Jump to content

USS Constitution by AndyMech - FINISHED - Revell - 1:96 - PLASTIC


Recommended Posts

Deadeyes:  There was a lot of flash to remove from these pieces, which took a day by itself, then they were painted black and the ropes a dark tan. Finally, glued onto the ship.

I'll start the port side next -- I kept them separate so as not to get confused about which pieces went where. 

 

post-308-0-98791800-1361045427_thumb.jpg

post-308-0-77023000-1361045428_thumb.jpg

 

Port side:

 

post-308-0-94961400-1361045463_thumb.jpg

post-308-0-95261100-1361045464_thumb.jpg

Link to comment
Share on other sites

 I got the bowsprit assembled and installed. I decided to paint the upper spars brown (leather) instead of white as it more closely matches current photos. I also like the look of that a little better.

Everything went pretty well except for some inadvertent bumping of the black yard - I repaired it as best I
could, but it's pretty fragile.

 

post-308-0-69420200-1361045626_thumb.jpg

post-308-0-63479900-1361045627_thumb.jpg

 

All the pieces assembled and painted. The jib-boom is lashed to the bowsprit as well.

post-308-0-73919100-1361045628_thumb.jpg

post-308-0-13018300-1361045599_thumb.jpg

 

The gammoning around the bowsprit. I used a needle to thread it through and it went pretty well.

post-308-0-06467100-1361045630_thumb.jpg

Link to comment
Share on other sites

After putting in the bowsprit cover, I got to work on the anchors next. They were pretty straightforward - glue together, a little paint and tie them to the bow. After seizing all the cannons, doing a little seizing
on the giant anchor rope was a piece of cake. 

 

post-308-0-52190800-1361045720_thumb.jpg

post-308-0-59847600-1361045721_thumb.jpg

 

Anchor on port side. You can also see the boomkin glued into place.

post-308-0-81977700-1361045722_thumb.jpg

 

Link to comment
Share on other sites

I've started the mast construction:

- I'm reinforcing the masts with 0.047" (1.19mm) music wire from my local hobby shop. It's pretty stiff and difficult to cut, so I hope it helps stiffen the masts. The wire is glued in with thick CA.
- My white paint thickened up over the few weeks break, so I thinned it with a little water and was amazed how much better it went on the masts! It took multiple coats of course, but no brush marks and looks very good.

I'm starting to need the various blocks provided with the kit, so it will be a long process to clean off the flash, remove from the sprue and paint.  

 

Wire reinforcement in the yard.

post-308-0-25375600-1361045835_thumb.jpg

 

post-308-0-31574700-1361045836_thumb.jpg

 

 

Gluing the mast and yard together.

post-308-0-36894800-1361045837_thumb.jpg

 

post-308-0-21755200-1361045838_thumb.jpg

 

The deadeyes installed on the foremast top.

post-308-0-50398100-1361045839_thumb.jpg

 

Link to comment
Share on other sites

I completed the fore mast, with the exception of the yards. I'll add those after building all three vertical masts.

The critical eye will notice that I changed the wood paint color on the masts to a lighter shade of brown. This is the "Wood" color (Model Master Acryl number 4673). The older Leather color just seemed too dark after looking at some photos of the masts.  

 

post-308-0-38632000-1361046081_thumb.jpg

post-308-0-92827700-1361046093_thumb.jpg

 

Link to comment
Share on other sites

My plan is to finish all three masts, with the exception of the yards, then pore over the rigging plans to attempt to understand how the blocks are used, which ones go where, etc.

I did a first pass of this a week or so ago and found the rigging plans more-or-less clear. There's a lot
there, but if I took my time to puzzle it out I think I made progress understanding it. I bet it'll take a few more readings to get a better feel.  

 

I finished all three masts, with the exception of the yards

 

post-308-0-95222800-1361046179_thumb.jpg

post-308-0-84765800-1361046181_thumb.jpg

post-308-0-50740800-1361046183_thumb.jpg

 

 

 

Link to comment
Share on other sites

I've spent a lot of time poring over the rigging plans with the intention of marking off on the yards all the blocks and lines attached to it.

I created a paper diagram the of 4 yards on the foremast. My plans is to

1. Add the footropes and stirrups
2. Add all the blocks

3. Lastly, add the booms

There are a couple of questions:

- The braces attach with a block at the end of the yard. I noticed on the Syren's plans, that block is good distance from the yard, but my rigging plans have it quite close. Any opinion on this distance?

- The halyards for the upper two yards (topgallant and royal) seem to be "singles". I can't tell from the plans if those two halyards have a left AND a right component. Do they? Also, it looks like those two halyards are tied to the yards instead of to a block - is that correct?

I'll post a picture of those instructions. 

post-308-0-80055400-1361046291_thumb.jpg

post-308-0-51594800-1361046290_thumb.jpg

 

Link to comment
Share on other sites

I finished the stirrups and footropes on one half of the lower fore mast yard. I started with a clove hitch to attach a the 3 stirrups, then made a loop over a pin and applied a little CA to hold it.

After the CA dries, remove the pin, leaving nice little hole. I strung the large diameter black thread through this hole and attached the two ends to the yards with another clove hitch. One of the holes collapsed, but it wasn't too difficult to glue it back once the threaded footrope was through it.

Little weights in the form of bent pins are placed between the stirrups to create a sag and then set in place with some more CA.

The technique complements of Hubert Sicard at Ship Modeling for Dummies. 

 

Clove hitches attach to the yard. I know seizing is more accurate, but for the smallness of the detail I went with the easier knot to tie.

post-308-0-93694700-1361046387_thumb.jpg

 

The little loops are glued under tension of the clip weights

post-308-0-87469500-1361046388_thumb.jpg

 

The finished footropes - I hope to improve the sag for future ones.

post-308-0-84624400-1361046389_thumb.jpg

 

Link to comment
Share on other sites

Time was spent trimming and painting blocks. It's mind-numbing, and I only did the amount needed for the foremast and main mast yards. 

 

Painting blocks. Each gets two coats of "wood" color, followed by a black for the ring and strop (not shown here)

post-308-0-25998200-1361046532_thumb.jpg

 

The footropes on the other side of the yard.

post-308-0-05897500-1361046535_thumb.jpg

Link to comment
Share on other sites

I finished my first yard before installation on the mast. This is the foremast lower yard.

I've tied all the blocks to it, added the booms with lashing.

I've taken to using plain white Elmer's glue to fix the knots. I did buy some fabric cement, but I'm not overly pleased with it - seems to be a bit thick coming out the tube. The trick with the white glue is to not let it clump up before drying as that still shows, so I will dab a bit on with a needle, let is dry a little, then move the rest around so it doesn't show. It works pretty well, especially for getting overhand knots to stay until I can complete the knot. Plus, its much more forgiving than CA. 

 

post-308-0-30048200-1361046697_thumb.jpg

post-308-0-24556500-1361046711_thumb.jpg

post-308-0-88631200-1361046715_thumb.jpg

 

After spending nearly 3 weeks on the foremast lower yard, Iwas able to do the top yard in just a day. Only two blocks and two stirrups, so it went pretty quick.

 

post-308-0-48070200-1361046718_thumb.jpg

 

Link to comment
Share on other sites

Have finally finished the foot ropes for all 12 yards. The photo shows them foremast, mainmast and mizzen mast. I decided to do them all at once rather than attach blocks and booms since I seemed to get better at them as time went one. I completed the lower main mast and mizzen mast ones today, for example, in much quicker time than the earlier ones.

Next steps will be to attach the blocks to all yards and then the booms. I'll do a little touch up paint, then
set the yards aside and work on installing the masts and the starting the standing rigging. 

 

post-308-0-49087200-1361046849_thumb.jpg

post-308-0-25448300-1361046852_thumb.jpg

Link to comment
Share on other sites

I got the masts installed yesterday - all three glued into place. I had earlier dry-fitted them, so this part went pretty well. It definitely looks more like a ship.

I may have to do a little touch up paint where I scraped it away to make the glue work, and I need to paint the trysail mast. 

 

post-308-0-62310100-1361046967_thumb.jpg

post-308-0-64143200-1361046972_thumb.jpg

Link to comment
Share on other sites

I started with the standing rigging today. After painting the trysail mast and doing a little other white paint touch-up on the just-glued masts, I began with the foremast lower shrouds/ratlines.

On the Revell kit, these are pre-formed. As this is my first attempt at tall ship rigging, I figured I would use them. If they looked terrible or didn't fit or something, I could always remove them and do them by hand. Overall, I was pleased with how they went - was able to make them decently taut. I'm sure I'll keep them. 

 

post-308-0-79524800-1361047052_thumb.jpg

post-308-0-59673800-1361047033_thumb.jpg

post-308-0-63405400-1361047054_thumb.jpg

Link to comment
Share on other sites

I added the lower shrouds and ratline assemblies to the main and mizzen masts, which was pretty straightforward and identical to the foremast.

I've been worried about dust getting on the model especially now that the rigging is going up. A lot of build logs here mention having a case ready to go well before the model is completed, so I took that advice to heart.


On the other hand, I don't have good place to display model yet and haven't had the time to create a "nice" case. So, I came up with an interim solution. I'll keep the model on the floor of my basement and constructed a temporary case on the cheap.

I went to a local home improvement store and bought 30 feet of 1/2 inch PVC tubing, and the store cut them for me -- 4x40inch lengths, 4x28inch and 4x16inch lengths (going for a 40x28x16 inch case). I also bought 8 1/2 inch corner fittings and a window insulation kit. Total cost was under $25.

I assembled the PVC tubing, using the corner fittings and without glue - it fits together quite tight enough without cement. Next, I wrapped the window plastic around the 5 sides and used a hair dryer to
shrink it tight. It's quite lightweight and easy to move on and off my model and should keep the dust off and the spiders away.

I do plan on making (or having made) an acrylic box on a wooden base as a more permanent home -
meanwhile this will do during construction (I can also re-use for future models). 

 

post-308-0-94683200-1361047214_thumb.jpg

post-308-0-85941100-1361047223_thumb.jpg

Link to comment
Share on other sites

Tied off the futtock shrouds this morning. I seized the foremast and mainmast shrouds and used a simple overhand knot for the mizzen mast. Tying to plastic ratlines is a challenge. 

 

post-308-0-36760400-1361047281_thumb.jpg

post-308-0-11269300-1361047293_thumb.jpg

post-308-0-91407900-1361047332_thumb.jpg

 

 

 

I've completed the shrouds and ratlines for the masts. There are three levels, all using the pre-formed ratlines. Mostly, it works ok. Doing them by hand would certainly look better and I'm sure this is the last
time I'll use any pre-formed things for this.

Next up is the bowsprit rigging. 

 

post-308-0-98193700-1361047381_thumb.jpg

post-308-0-82766200-1361047382_thumb.jpg

post-308-0-74835700-1361047383_thumb.jpg

Link to comment
Share on other sites

I started rigging the bowsprit last weekend, and finished only part of it today. I got 10 bulleyes tied to the bow. First, I measured how long each line needed to be, then seized that line to the 10 bulleyes prior to
putting them on the bowsprit.

The plans called for 5 bulleyes on each side, with the lines going to various eyebolts installed earlier.

Next up, I need to tie some blocks and a few more bulleyes to the bow area. 

 

post-308-0-39008200-1361047449_thumb.jpg

post-308-0-98686600-1361047451_thumb.jpg

post-308-0-47502100-1361047454_thumb.jpg

post-308-0-76708500-1361047455_thumb.jpg

post-308-0-64671800-1361047456_thumb.jpg

 

Link to comment
Share on other sites

I completed the first step in the rigging of the bowsprit - the shrouds and stays.

Tying the pre-formed "Bulleyes" to the bowsprit and the blocks to the yard were mostly straightforward. The hard part were the three bulleyes tied to the section where the bow rails come together. It took me all day yesterday to tie just the 4 bulleyes there on the port side. As I worked, I noticed the starboard side piece was loose, so I removed it. Since it was out, I tied the bulleyes to it, then installed it and that was sooooo much easier.

Future kit builders - attach those bulleyes to the eyebolt piece (see photos) prior to gluing onto the ship. 

 

post-308-0-58081000-1361047554_thumb.jpg

post-308-0-58993200-1361047660_thumb.jpg

post-308-0-63241600-1361047661_thumb.jpg

post-308-0-71064500-1361047662_thumb.jpg

Link to comment
Share on other sites

I continued the rigging, following the instructions closely.

First, rig the guys and stays on the dolphin striker. That completes step 3 of the standing rigging. Next was the forestay rigging - I started with the bow to mainmast stay, then did the foremast mainstay and the
fore topmast stay.


I still need to add the ladder thread to the forestay. 

 

post-308-0-05887800-1361047758_thumb.jpg

post-308-0-03505800-1361047759_thumb.jpg

post-308-0-96999200-1361047761_thumb.jpg

 

Shows how the rigging wraps around the mast and is tied to form a loop.

post-308-0-87639500-1361047764_thumb.jpg

 

Link to comment
Share on other sites

Today I finished the lower forestays for the mainmast and the mizzenmast. It took a full day of work (3-4 hours) for me to prepare the bulleyes and the eyebolts as well as tie the 3 blocks to the masts.

Then today I was able to rig the final large thread forestays. Doing the seizing on them was quite challenging due to all the ratlines and shrouds in the way, but I'm pretty happy with the result. 

 

A shot of where I had to glue the bulleyes near the foremast - the instructions were not clear, so I used the foremost holes to glue them in.

post-308-0-74684400-1361047887_thumb.jpg

 

 

The main mast forestay - here against the foremast. I threaded these behind the futtocks as they were pressing against them otherwise.

post-308-0-36844300-1361047899_thumb.jpg

 

The completed mizzenmast lower forestay

post-308-0-17338800-1361047901_thumb.jpg

 

Shows the forestay tied to the rope around the main mast.

post-308-0-14213800-1361047902_thumb.jpg

Link to comment
Share on other sites

I complete the foremast forestays:

Jib Stay

Fore topgallant stay
Flying jib outhauler
Fore royal stay

Flagstaff stay

(I get these names from the instructions, I certainly hope they're correct).

The only difficult part is the getting the tension just right -- to much and it bends the masts (which it may have just a bit), too little and the lines are slack. I'm using simple overhand knots or
hitches for these.

I've also decided to forgo doing the forestay ladder rigging as the photos of the current Constitution don't show them and I personally don't feel they add much to the look of the model.

 

Closeup of the block rigging on the jibstay and flying jib outhauler. This is detail O in the instructions

post-308-0-75097100-1361048056_thumb.jpg

 

bowsprit rigging

post-308-0-11005700-1361048058_thumb.jpg

 

The completed foremast forestays

post-308-0-34094100-1361048059_thumb.jpg

 

Full ship shot

post-308-0-48513800-1361048024_thumb.jpg

 

 

 

Link to comment
Share on other sites

Waxing the lines with beeswax makes such a big difference in how the lines feel and tighten.

Finally, I'm just about out of my medium size black thread. I'm not sure if other Revell Constitution builders had this problem or not. I ordered and received 30 yards of 0.012inch thread from Model Expo, that should be enough to finish the standing rigging.

 

I finished the forestays today - connecting the mainmast tothe mizzenmast.

The mizzenmast is very slightly out of vertical now, but only slightly so I will leave it as is. Again, hopefully the backstays will correct it somewhat. 

 

post-308-0-31572400-1361048201_thumb.jpg

post-308-0-51776800-1361048202_thumb.jpg

Link to comment
Share on other sites

I finished step 5 of the standing rigging - the manropes and boomkin guys on the bow.

No real comments - it was a straightforward set of ropes, easy to get taut. Doing footropes again was fun, and getting the right amount of sag not too difficult. I stiffened the lines with 50% dilute white glue. 

 

post-308-0-36176100-1361048352_thumb.jpg

post-308-0-72638500-1361048362_thumb.jpg

post-308-0-72153900-1361048366_thumb.jpg

 

 

Link to comment
Share on other sites

Finally, the standing rigging was completed with the addition of the backstays.

 

Bowsprit final:

post-308-0-89616700-1361048471_thumb.jpg

 

 

post-308-0-55186900-1361048467_thumb.jpg

post-308-0-35953300-1361048468_thumb.jpg

 

Link to comment
Share on other sites

Last weekend, I added the yards, all 12 of them, to the masts.

 

I also did a slight bit of touch up painting.  where the yards are glued to the masts.

 

post-308-0-69302900-1361048634_thumb.jpg

post-308-0-99493600-1361048635_thumb.jpg

 

This gets us caught up to present time.  I'm tired, so I'll work on the ship tomorrow.

 

Andy.

Link to comment
Share on other sites

hi andy

 

good to see your build log back up

will keep following it :)

 

Current builds : HMS Bounty, Constructo Pilar

Next build : undecided

On the Shelf : AL San Juan, Mamoli HMS Victory

Builds on hold : Ochre Gorch Fock, Hachette/Amati Black Pearl

Previous Builds Gallery : Virginia; King of Mississippi

Previous Builds logs : AL King of Mississippi 1/80

Link to comment
Share on other sites

Great work Andy! I was following your build before and it's nice to see the progress you've made.

Steve

Edited by docidle

Current Build: Merit 1/48 Early Eco 80' PT Boat and Imai 1/50 Catalan Ship

Finished:

Revell 1/196 USS Constitution (My oldest son's school project)
Revell 1/72 Hanse Kogge
Revell 1/50 Viking Ship
Revell 1/72 U-Boat
Zvezda 1/72 English Medieval Ship Thomas

Revell 1/90 The Nina

Link to comment
Share on other sites

Hi Andy! I,m a newbie here thanks for the detail! I'm traveling to B-town next week and plan on spending as much time as possible at the Constitution. My camera is loaded and ready to document. Anything you want photo details on for your build? I have the model Shipways kit in my closet and I'm going to get as much imaging as I can especially bow and stern details. If anyone else out there needs some shots let me know!

Link to comment
Share on other sites

Thanks for the photo offer, but I think I'm good. I found a batch of photos a while back that I've been using, and now that the running is underway, I think I'll be relying on the instructions more than anything else.

 

Thanks though, and thanks for following the build.

 

Andy

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...