Jump to content

HMS Beagle by Dave3092 - Mamoli - Scale 1:64 - Originally built around 1817, this build will be on the ship as provided - First wooden ship build


Recommended Posts

I decided on the H.M.S. Beagle because we had traveled to he Galapagos islands back in 2012.  I purchased the kit on eBay after it was no longer available from the manufacturer.  This particular kit was originally purchased in 1995, so it us already 23 years old.  So far, I have scanned and OCR'd the instructions and parts lists from the original instructions. 

 

DSCN3024a.thumb.jpg.caa549eb129b09f4009c47256a501d10.jpg

From that, I created a master parts list to compare to the inventory provided.  Almost everything seems to be there, but I have two items that I need some help identifying.

 

These were in the same bag as the cannon and carriages.  They look like a strap to hold the wheel axles, but the bumps do not line up with the axle indents on the carriage.

5ad7bd5f506ad_CannonParts.thumb.JPG.e1e1751dcc6548fe11aa08d9d8fa09e2.JPG

And I haven't been able to identify what these might be.

Unknown.thumb.JPG.bbb3aa353165966afd44c7a105348337.JPG

Any help identifying these would be greatly appreciated.

 

Thanks!

Link to comment
Share on other sites

Dave, the strips of wood with angled cuts look like they are the sides of stairs. The treads go in the slots.

Keith

 

Current Build:-

Cangarda (Steam Yacht) - Scale 1:24

 

Previous Builds:-

 

Schooner Germania (Nova) - Scale 1:36

https://modelshipworld.com/topic/19848-schooner-germania-nova-by-keithaug-scale-136-1908-2011/

Schooner Altair by KeithAug - Scale 1:32 - 1931

http://modelshipworld.com/index.php/topic/12515-schooner-altair-by-keithaug-scale-132-1931/?p=378702

J Class Endeavour by KeithAug - Amati - Scale 1:35 - 1989 after restoration.

http://modelshipworld.com/index.php/topic/10752-j-class-endeavour-by-keithaug-amati-scale-135-1989-after-restoration/?p=325029

 

Other Topics

Nautical Adventures

http://modelshipworld.com/index.php/topic/13727-nautical-adventures/?p=422846

 

 

Link to comment
Share on other sites

Thanks a lot!  I can see that now that you mentioned it, as there are 4 ladders with 3 steps each, and there are 12 slots in these pieces.  The kit also had twelve steps, but it looks like the kit needs 24 - 12 for the ladders and six on each side of the ship.  I guess I will have to make up the difference!

Link to comment
Share on other sites

  • 2 months later...

6/18/2018

This post covers the work done to prepare the keel and frames for gluing.

Right up front, I want to credit Model Shipbuilding Simplified by Frank Mastini (heretofore referenced as MSS).  I bought the book to supplement the somewhat terse instructions provided by Mamoli, and it has been a very valuable aid in understanding how to proceed.  In addition, the Italian – English dictionary of nautical terms was helpful in translating the parts list.

I hit a gumption trap (from Zen and the Art of Motorcycle Maintenance) almost at the beginning.  I ordered a tool kit, plank bender and vacuum base vise, and while the first two arrived with no problem, it took three tries by an unnamed big box store to get the vise.  Between that and my schedule, it was a delay of almost two months!  However, it did finally arrive.  I am using a ceramic tile for the vise to adhere to and to provide significant weight to the vise while remaining portable.

Ta-Da!

DSCN3169.thumb.jpg.2a200f32c992e58c716bc54e9533b8bb.jpg

While I was waiting, I created poster board templates of the frames to check for symmetry and to ensure the slot is centered on the frames as recommended in MSS.  In MSS, he also recommends using the false deck if there are no bulwarks.  I liked this way of holding the frames perpendicular (as opposed to the other methods suggested in the book), so I decided to so created “false” false decks of poster board to hold the frames in place for gluing.  I cut back the poster board decks so that they would not engage with the bulwarks on each deck.

DSCN3165.thumb.JPG.2efed419584a417a3575f18527a7dcec.JPGDSCN3162.thumb.JPG.4f4ef3d26d1e99ae2810e457695902c6.JPG

Once I received the vice, I started work on the frames, I made adjustments to the frames previously identified with the frame templates.  I then checked and adjusted the height of the bulwarks.  Most of them were 15 mm above the deck, so I used that as the standard.  Mamoli puts a 1.5mm wide step on the outside of the bulwark separating the planking for the bulwarks from the planking for the hull, so I checked and adjusted the distance between the top of the bulwark and the step to 13mm, which was the distance on most of the bulwarks, as well as the depth of the step.

5b284a98545bd_DSCN3167(2).thumb.JPG.8467633b7eef476d682dcd5f99706067.JPG

Once the frames were corrected, I checked and adjusted the keel slots so that the top of the frames were level with the keel, except for the two frames that sit below deck level.  I then filed down the edges of the first three and last five frames to chamfer the edges to accommodate the bending of the planks.  There will probably have to be fine tuned before I begin planking.

5b284af46081b_DSCN3153(2).thumb.JPG.b52be0e66fe4a8f455c7f516f4cdf4f1.JPG

5b284b83de8bb_DSCN3150(2).thumb.JPG.bdbdbd3b92638ab3bf6091dd2688c3fa.JPG

Instead of using the existing cuts for the masts as is, I decided to square off the end of the masts so that they would be less liable to twist in the socket.  The main and fore masts are 6mm, so I created a square mast box that is 5mm on a side.  The mizzen mast is 5mm, so I reduced it to 4mm.  I also increased the depths of the masts from 13mm to 15mm.  It is not much, but I thought it would help provide more rigidity to the masts.  I will deal with the bowsprit mast box after gluing the frames to the keel, since it is defined by the bow quadrant pieces that are added after the foredeck is in place.

Foremast Mastbox

5b284c216323c_DSCN3154(2).thumb.JPG.b9e7b6bed48e7dfd4e2f8c16196629f0.JPG

5b284c093ce98_DSCN3158(2).thumb.JPG.9b7f27b03c9fba4c0d888e27ff5d1b66.JPG

Finally, I laid in and tacked down the poster board false decks to hold the frames for gluing.  For the two frames that fall short of the false decks, I glued a piece of wood on each side of the keel in front of the frame after squaring up the frame to the keel (another technique suggest in MSS).  They will hold the frame square until it is glued.

5b284cea44245_DSCN3163(2).thumb.JPG.6654ed86adb6d043564230877dc55c05.JPG

Build time to date – 64.5 hrs: 45 hrs preparation, 19.5 hrs working on the frames

Link to comment
Share on other sites

  • 5 weeks later...

7/4/2018

Something I forgot to put into my last build log.  I created a lumberyard from a cereal box and paper towel rolls with poster board separators.  It works really well to sort out the various laths used in this model.

DSCN3166.thumb.JPG.a72f805792c62d79876d613d43bd8eda.JPG

DSCN3178.thumb.JPG.44a60b29956f6501d8f2a148793270a4.JPG

This post covers the work done to add the false decks, the bow and stern walls, the plank landing blocks and fairing the hull.

After stripping off the poster board false decks, I fitted the false decks for the foredeck, the main deck and the bridge deck.  I then glued down the decks and nailed down all the decks to the keel and frames.  I had to add a block on the foredeck starboard side to pull down that side of the foredeck.  I planked and added the the bow and stern walls.  I ran a pencil along the edge of the planks to bring out their definition.

 DSCN3171.thumb.JPG.ca536dd4199be916ef3e5e98d4593852.JPG

DSCN3172.thumb.JPG.2947aed6d16d928ed6e1739419b5608a.JPG

DSCN3173.thumb.JPG.d7a1bdbb384ad5df0311c6734d1d23a8.JPG

A large segment of time was spent in forming the plank landing blocks for both the bow and stern.  These were recommended by MSS to anchor the underplanking when planking the hull but not provided in the kit.

 DSCN3175.thumb.JPG.41d819ec9b30519b4140df39ae96ea21.JPG

DSCN3174.thumb.JPG.e9bb558a2dc15fb51593a886333cb40a.JPG

I struggled a bit in fairing the hull as I couldn’t tell on the port side whether frame 7 was sticking out too far or that frame 8 was too far back.  I ended up taking 5 measurements (A thru E) along each frame of frames 5 to 10 on both the starboard and port sides.  I compared the measurements between port and starboard sides and found that, indeed, frame 7 need to be filed back about 1 mm on the port side (compare 6-7 on starboard side with 6-7 and [R}evised6-7 on port side).  This brought both sides within a millimeter of being the same on both sides.

FrameCheck.thumb.jpg.17f8ffc2ae2ee8e25852e37e5fec242d.jpg 

I then mounted four underplanks on each side of the hull to help with fairing the hull (also recommended by MSS).  I found 3 or 4 places that needed to be filled in.

 DSCN3177.thumb.JPG.373f9b9c570cb04c263ca86ff671e2cd.JPG

I am now ready to start underplanking the hull.

 

Build time to date – 92.75 hrs: 28.25 hrs for the work in this build log.

MSS - Model Shipbuilding Simplified by Frank Mastini

 

DSCN3176.JPG

Link to comment
Share on other sites

  • 2 weeks later...

Dave I really like reading your post and look forward to reading many more informative articles. I too have this kit but only collecting dust in my shed so I'm very interested in your build. Who knows I might even blow the dust off the box one day.

 

Graham

Link to comment
Share on other sites

As a geologist, I love the idea of building the Beagle someday, so I'll happily follow along with this. I like your lumberyard; I did something similar by gluing a series of short PVC pipe sections into an upright cluster; the wood flop around more but it takes up less space on my workbench.

Link to comment
Share on other sites

  • 4 weeks later...

Thanks Graham and Eric for  your comments.  I think it is a very doable model, as long as you don't solely rely on the instructions provided.  I like the idea of the PVC sections.  I decided to do my lumberyard that way as I was moving between a summer house and main house.  My approach allowed me to package everything up quite readily.

Link to comment
Share on other sites

8/27/2018

Another item I had intended to include before is my parts inventory storage.  At my wife’s suggestion, I used sandwich bags and Post-it Notes with a different color for each type of material (wood, metal, other).  The parts are stored alphabetically by type.  It works very well (at least so far!).

PartsInventory.thumb.JPG.73f2724ebb143deeb7f268cf324d61ae.JPG

This post covers the work done to underplank the hull.

To soak the planks, I created a plank bath from a length of threaded PVC pipe.  I cut it to a length slightly larger than the planks, then capped the threaded end. I used a slip cap on the other end to put in and take out planks.  When done for the day, I would empty the pipe, then unscrew the cap so that the pipe could dry out.

PlankBath.thumb.JPG.54f55c467c938d6e981178c47e26a5da.JPG

I used the gluing method recommended in MSS.  I put wood glue on the frames and the top of the plank around the frames, and put Superglue in the middle of the top of the plank.  However, I did two frames at a time, as opposed to the one suggested in MSS.

Glue1.thumb.JPG.3caace2637081a9337f8afa7790788c8.JPG

Glue2.thumb.JPG.66c6264fba662ecaa62cfeaa9f4266a2.JPG

I used the older version of the Aeropiccola plank bender as I thought the various curvatures available on the plank bender would be useful, which turned out to be the case.  TIP: Have a plier handy to pull the roller out for inserting the wood and moving the roller up and down the curved surface.

PlankBender.thumb.JPG.32ea078a7ffc8e0687ef104d81cdb844.JPG

Overall, the planking went well, except for the bow area.  The picture in the instructions showed the planks going across the bow horizontally.

InsturctBow.thumb.JPG.786256025c773aa63a705c59664166ef.JPG

However when I tried to do that I found it difficult, if not impossible, to get the planks to lay flat against the frames. 

PartialBow.thumb.JPG.655c6136f732bde8be9080be4c1a5b61.JPG

PartialUnderplanl.thumb.JPG.55d4f9ae2b8e03ee6aa06ea8d4f71767.JPG

PartialStern.thumb.JPG.b1c697981f9075c393f32e1b485879a6.JPG

 

After some online research on other builds, I decided to angle the planks as I worked down the rest of the hull.  This worked much better.  Because of this I added an additional landing block to the bow.

NewLB.thumb.JPG.dc262a72e950cd8ac1ca784e0d0b8d8a.JPG

I generally held the hull in the vise when I was laying the planks.  However, as I neared the bottom that was impractical.  I found that a folded bath towel provided enough cushioning while holding the hull in place while I worked.

Towel.thumb.JPG.de9f345e7be3154c6a1b3acfdaaafe73.JPG

Here is the completed underplanking of the hull.

FinishPlank1.thumb.JPG.d5fedcbba69e49a580928c37daeeaf4d.JPG

FinishPlank2.thumb.JPG.63637d076052c4c80ec9316399db1ca7.JPG

FinishPlankBow.thumb.JPG.3db1136dd1356cf6a5f91cbfa0cfc990.JPG

(Looks pretty rough, huh?)

FinishPlankStern.thumb.JPG.40cf4dec057c3beffa398c06649cc7ff.JPG

Once the hull underplanking was completed, I worked up the bulwark extensions to underplank the bulwark.  I decided to leave the nails in as I worked down the hull and up the bulwark, hence the hedgehog appearance of the finished hull.

FinishBulwark.thumb.JPG.a275c2e4082466ce400d6200f4861f52.JPG

Once all the underplanking was finished, I removed the nails, sanded the hull and filled where necessary.  I made four passes over the hull – rough grit, medium grit, fine grit and 0000 steel wool.

Sanded1.thumb.JPG.dacd8a74bc3333b2bcb9ca65b436d2e9.JPG

SandedBow.thumb.JPG.2452e47a7543c66625255449810cd805.JPG

(Looks MUCH better!)

SandedStern.thumb.JPG.0eaffc8a72d674723373043cdaa558b1.JPG

Now I am ready to begin applying the finish planking.

 

Build time to date – 126 hrs: 33.25 hrs for the work in this build log entry.

MSS - Model Shipbuilding Simplified by Frank Mastini

 

Link to comment
Share on other sites

There are two ways to get planks to lie "horizontally" as if they were parallel to the deck. Either you edge-bend them, so that they curve both sideways and up-and-down, or you spile them, meaning you cut the complex shape needed out of a wider piece of wood. It's not otherwise possible to make a straight strip of wood follow the flow of a hull, especially on bluff bows. Kit instructions (especially European ones) tend to be awful at explaining how to do this; I suggest you consult some of the excellent planking guides on this site to learn more about how to do this before you start laying your final layer.

Link to comment
Share on other sites

Hi Dave.

A interesting project.. I think I will follow along with this one. The Beagle has been one of my daughter's favourite ships.

This kit is now available from Dusek Ship Models. I don't know if Daniel has updated the kit. 

Take time to read the planking tutorials here on MSW. They are good and I learnt a huge amount from them.  http://modelshipworldforum.com/ship-model-framing-and-planking-articles.php

 

Awaiting your next update.

Regards Antony.

Best advice ever given to me."If you don't know ..Just ask.

Completed Mayflower

Completed Fun build Tail boat Tailboat

Completed Build Chinese Junk Chinese Pirate Junk

Completed scratch built Korean Turtle ship 1/32 Turtle ship

Completed Santa Lucia Sicilian Cargo Boat 1/30 scale Santa Lucia

On hold. Bounty Occre 1/45

Completed HMS Victory by DeAgostini modelspace. DeAgostini Victory Cross Section

Completed H.M.S. Victory X section by Coral. HMS Victory cross section

Completed The Black Pearl fun build Black Queen

Completed A large scale Victory cross section 1/36 Victory Cross Section

Link to comment
Share on other sites

Hi Dave,  I 'll follow along on this one as well as my daughter has always been very interested in the work of Charles Darwin (she's an environmental and biology scientist!) I was thinking of doing this model at some stage in the future to give to her as a present.

 

Cheers...........Fernando  :cheers:

Current Builds - Colonial Brig Perseverance 1807 by Fernando E - Modellers Shipyard - 1:48 scale

 

Previous Builds - 

S Lucia by Fernando E - Panart - Scale 1:30

Sloop Norfolk 1798 by Fernando E - Modellers Shipyard - Scale 1:36 

 

Link to comment
Share on other sites

  • 1 month later...

Thanks, Eric and Antony, for the referral to the Articles Database. 👍 I downloaded all the relevant articles and reviewed them multiple times.  My constraint is that I am determined to build this ship using the materials provided, which is incompatible to the methods discussed in the articles.  However, I eventually decided on a hybrid approach of interweaving plank segments from the bow and side to cover the curvature of the bow.  It is not perfect, but it seemed like a good compromise (see following article).

 

Best,

Dave 

 

Link to comment
Share on other sites

10/19/18

This post covers the work done to finish plank the hull.

I first planked the stern followed by the sheerstrakes, decorative (I think) planking and bulwark on the starboard side.  I then worked my way down the starboard side of the hull.

5StartboardStrakes.thumb.jpg.8f6a2b94f3f8f0f7cbcfb4dba2a6a0ee.jpg

At the recommendations from other members of this site, I read all the articles on planking available in the Articles Database getting a much better understanding of the task before me.  I am constrained in that I am determined to use the materials provided to complete the ship and, therefore, could not cut planks out of a wider plank of wood as recommended.  I therefore interwove planking coming around the bow with the planking from the side for each row. This is not perfect, but it is a significant improvement in appearance over the way the underplanking turned out.

I did each row of plank in three segments:

1)    From the bow to Frame 4 or 5 (alternatively)

2)    From Frame 4 to Frame 8 or from Frame 5 to Frame 9

3)    From the stern to Frame 9 or 8 (alternatively)

5PlankSegments.thumb.JPG.886778662991737a7bc92589ffcf51d7.JPG

This allowed me to do the detail work at each end of the ship, while taking advantage of the relative evenness of the center area of the side.

I used the method shown in one of the Planking articles for creating custom cuts of planking.  I lay masking tape of the opening, trace out the opening in pencil, transfer the tape to paper and cut out the tracing.  This can then be used to create the appropriately shaped piece.

5TapeTemplate.thumb.JPG.abcacbccfb7edd5eb208230325c34696.JPG

TIP:  Use double-sided tape on paper to provide a holding table while working on shaping the planking.

5BuildTable.thumb.JPG.d7b23293280064e0502f13a27caaa2b4.JPG

I used the gluing method recommended in MSS for finish planking.  I used Superglue at the beginning of the plank, then applied carpenters glue over about 1 to 1 – ½ frames.  While holding the wood in place, I then ran the plank bender over the glued plank.  This pressed down the plank while steaming it and drying out the wood glue to adhere the plank to the underplanking.  I also found that if there was a small gap, moving the plank bender perpendicular to the current plank and toward the previous row would help close the gap.  I kept a wet rag handy to wipe up any excess glue before it dried.

Once I completed the planking, I went back over each section applying a wash of diluted carpenters glue to seep into any openings or gaps.  I then wiped off the excess glue, dried the planks and sanded the surface with fine sandpaper.  This allowed the sawdust from the sanding to adhere to the glue in any openings providing a smoother finish.

After completing the starboard side, I did the same thing on the port side.

For the port side, I was short of material for completing the sheerstrakes and decorative planking out of the kit.  I had to splice one of the rows of mahogany planking on the port side.  I cut the plank on a 45-deg. angle to reduce the visibility of the splice.  Also on the port side, I substituted a 2mm x 2mm + 2mm x 4mm walnut sheerstrake for the 2 – 2mm x 3mm walnut pieces that were not in the kit.   I then completed the planking on the port side.

5PortBow.thumb.JPG.77c7e607d73d10441054fa0a9f6b0882.JPG

5StarboardBow.thumb.JPG.8915bc11cc0f09c982a26f1160e9c808.JPG

5Stern.thumb.JPG.a6f2a01f9c38df3ce5b6d54d9b71115d.JPG

5Bow.thumb.JPG.57cb7ad77f0b9e124005153b1135b7f7.JPG

After completing the bulwark, I trimmed it to the top of the frame extensions.  Since this kit does not provide the material for the interior of the bulwark or encasing the frame extensions, I decided to at least stain those areas so that they would be closer in appearance to the rest of the material on the deck, in case I am unable to cover them.

5StainedBulwark.JPG.f3a0cfc3df7bee23e35e6741c91a33c1.JPG

One of the reasons that I wanted to do a plank on frame model such as this was for the experience of bending wood to conform to a curved surface.  I have worked with wood all my life as a rigid material, but I became fascinated with idea of shaping it into something of such complex curvature.  It is not perfect, but I am happy with the way it turned out and glad to have had the experience.   

 

Now on to work on the deck.

 

Build time to date – 181.5 hrs: 56.5 hrs for the work in this build log entry.

MSS - Model Shipbuilding Simplified by Frank Mastini

 

Link to comment
Share on other sites

Thanks for your kind comments.  It has been tough at times to keep from pushing through to get on with the next part of the build.  However, I am thoroughly glad to be done with the hull after spending over 180 hours on it.  It doesn't look like anything else (with the possible exception of the rigging) will be as labor intensive.

Link to comment
Share on other sites

Planking is definitely a major part of a build. Don't underestimate the sheer time slog and detail of rigging, but it's also more forgiving in that you're not fighting against the material, just carefully installing detail one step at a time.

Link to comment
Share on other sites

  • 1 month later...

10/19/18

Happy Thanksgiving!

This is a special post to recognize 200 hours of effort so far on the Beagle.

In this entry I opened up the bulwark between frames 4 and 8, added the railing and started planking the decks.

I found that for this work, the best way to hold the hull was to put it on the keel stand, but put the bow in the vice to stabilize the hull for the work.

DSCN3261.thumb.JPG.41fb12a90bcc23cfce38c0d875acf1ad.JPG

As I opened up the bulwarks, I realized that the original intent of the kit was to have the deck below the level of the step that defined the bulwark on each frame.  Unfortunately, the way the frames were cut the top of the deck came out even with the step.  I decided that I would complete the work on the deck, then add a small section of bulwark at the bottom of the openings between frame 4 and 8 to conceal the interior deck construction.  This will be done in the next phase.

DSCN3272.thumb.JPG.4d7667bc7013fdfa9f83b4b6760d1ee9.JPG

Before installing the railing, I trimmed back the frame extensions to about 1 – 2 mm.  The instructions suggested doing this after the railing was installed, but I thought it much easier to do before the installation.  I found the best way to do that was to use a hack saw blade, as it is flexible enough to work down along the bulwark.

DSCN3258.thumb.JPG.643d81dab3b12204f48fcdb3797bb5b8.JPG

DSCN3259.thumb.JPG.99fe49c21674b178b834a92b97753f17.JPG

I then added railing around the perimeter of all decks, piecing the fore deck to match the curve of the hull.  To ensure that the rail was in the proper position over the open portions of the deck, I rigged a segment of bulwark (previously removed) to the standalone frame extensions with a rubber band.  

DSCN3263.thumb.JPG.d4715d6d2d4932f0e06e64e29a4f99b7.JPG

Also, to try to ensure the 1 mm overlap of the railing over the bulwark, I used a piece of 1mm lath laid on the bulwark when gluing the railing.  After the railing was installed, I washed the joints with diluted glue and sanded the railing to fill in the joints.

DSCN3267.thumb.JPG.32ff6a10336000e281806979262ed8e5.JPG

Tip:  Since there is very little to hold the railing in place, it is very important to take the time to bend the railing, both horizontally and vertically, so get an exact a match as possible to the compound curve of the hull.

Once the railing was in place, the frame extensions of frames 5 to 7 were removed.  Again, I used the hack saw blade, since it was flexible enough to lay flat on the false deck to cut off the frame extensions.

With the railing in place, I was ready to start on planking the deck.  I built two jigs to help with that.  The first jig had an 80 mm length on one side and a 40 mm length on the other.  Combined with a straight edged side cutter, it was easy work to prepare the plank boards.

DSCN3264.thumb.JPG.d2a9b274d2f964b8187c4199ab07c261.JPG

The second jig was used to add holes at the end of the planking to simulate nails.  I put two tacks in a couple pieces of poster board, taped them together, then mounted them on a wood platform high enough to get the planking under them.  By pressing down on the nails, I could quickly add the holes.  I then highlighted the holes with a pencil point, and ran the pencil around the edge of the planking to help define the edges when assembled.

DSCN3265.thumb.JPG.e90bd456831e4d4c64e03a45a8078485.JPGDSCN3266.thumb.JPG.ff4b1d1e300e6fe9f4ddc952797c5f1f.JPG

To help ensure that the plank ends stayed in alignment across the deck, I made a small right triangle out of poster board and used it to mark out the joint lines on the deck.

DSCN3268.thumb.JPG.52b2ba857fe74ee49875c9f9cf428636.JPG

The decking itself went on pretty easily.  It was fascinating to see yet another compound curve as the main deck is concave fore to aft and convex from the center to either side.  It makes a lot of sense to managing water on the deck, but I wonder what it must have been like to walk along the deck that was continuously sloping. 

[A side note:  We were in Carmel-By-The-Sea recently, and I stopped in at a nautical shop that had a number of models.  I examined them with great interest, but one thing that struck me immediately was that the decks were flat!]

I finished the bridge deck completely (hurray!) and main deck, except for piecing around the perimeter.  I will do the fore deck last.

 

DSCN3273.thumb.JPG.c8462dfb97ef31b221180b91c5ad9e9a.JPGDSCN3274.thumb.JPG.46d1c5e3f0068c9f07dd079eb9b32099.JPG

Build time to date – 201.25 hrs: 19.75 hrs for the work in this build log entry.

MSS - Model Shipbuilding Simplified by Frank Mastini

 

Link to comment
Share on other sites

Hi Dave

 

Your build is coming along very nicely. I also like the two jigs you have built for the deck planking...very useful and one I will use on future builds.

 

Cheers...............Fernando :cheers:

Current Builds - Colonial Brig Perseverance 1807 by Fernando E - Modellers Shipyard - 1:48 scale

 

Previous Builds - 

S Lucia by Fernando E - Panart - Scale 1:30

Sloop Norfolk 1798 by Fernando E - Modellers Shipyard - Scale 1:36 

 

Link to comment
Share on other sites

  • 2 months later...

 

 

February 18, 2019

 

 

Complete hull, decking and hull attachments

 

 

 

First, I want to give credit to MSS for the deck plank cutting jig.  I should have mentioned that in the previous blog.  Also, the use of a compass for drawing cut lines on the edge deck planking (mentioned below) was suggested by the article, A primer on planking by David Antscherl, that I found in the database of articles on Framing and Planking.

 

 

I continued with completing the main and fore deck.  I used a compass set to 1 or 2 board widths to provide an initial cutting guide for the edge planks.  This made fitting the planks go a lot faster and cleaner.

 

 

7DeckDrawingTool.thumb.JPG.7a83a4b1f9faf9a2459092da5f45863c.JPG

Here is the ship with all decks planked.

 

 

7DecksCompleted.thumb.JPG.db2c9ba404b67a5b39cefa8d54b84ca3.JPG

A closer look at the plank fitting on the main deck.

7DeckFittingDetail.thumb.JPG.d4b111959f04c6c08d91ad7162c52076.JPG

I then went back to build in gunwales on the open portion of the main deck (as mentioned in the previous blog).  I added a 2 mm wide length of underplanking on each side, then covered it with Maple lath on the front and top.  I also add Maple lath to each end of the opening.  I think the result turned out rather well.

 

 

7Gunwale.thumb.JPG.77037cbcb0bc2f617dba133722851109.JPG

The next step is planking the keel.  Before starting that I drilled out a hole for the Bowsprit woolds.  The hole is a little ragged, but I’ll clean that up when I cover it with planking. 

7BowWooldsHole.thumb.JPG.2a505943664e9a581cd4ecf61d3f5239.JPG

I planked the entire keel bow to stern, including the edge of the keel.  Note the hole for the bowsprit woolds.

 

 

7BowKeel.thumb.JPG.44da26b6e77e8c5d18f0995218865b7a.JPG

7BottomKeel.JPG.8409468eccb4b7caf28d4ac57cd820e2.JPG

 

 

In order for the planks on the keel bow to be at a consistent angle, I set up this cutting jig. 

 

 

7PlankJig.JPG.d36d9d4ab29590737d2e71ff8d30196a.JPG

 

 

However, I don’t think planking the edge was planned for in the kit, because I ran out of the walnut planking.  I’m guessing that it wasn’t to be planked as it is for the most part painted (similar to the inside of the bulwark).  However, I have decided to leave the hull unpainted to better see the beautiful woods used to make it. 

 

 

I ended up ordering additional planking from Modelers Central in Australia.  While ordering, I got a 2mm x 4mm walnut plank to replace the one I had to use on the port side sheerstrakes (along with a 2mm x 2mm plank) when I was short of the two 2mm x 3mm walnut needed.  I also picked up a couple of blocks missing in the kit and some blocks for anchoring the cannon on the deck.  The company was easy to work with and delivered as promised.

 

 

After completing the keel planking, I planked the rudder.  The rudder came without the cutouts for the hinges, so I had to do that before planking.  To create the dowel for the tiller, I rounded off the edges of a 2mm x 2mm piece of walnut.

 

 

7Rudder.thumb.JPG.7bd033f848d7930cd10704043da3e067.JPG

After all planking was done, I applied diluted wood glue to the edges, wiped off the excess, and sanded (another MSS technique).  This is the same thing I had done on the hull and the decks.  It does an amazing job of smoothing out the planking.  I attached the rudder to the hull with the three sets of hinges then finished the lower part of the keel, rudder and lower part of the hull.  Since I saw many recommendations of using diluted shellac for a “primer” coat, I decided to use shellac for the finish.  I did the primer coat, the two additional coats of shellac full strength.  I like the look and feel of the finished product.

 

 

7RudderFinished.thumb.jpg.e2dd182b11b8f1fa1519393bc30fd30c.jpg

Next was putting the fenders on the aft section of the ship.  This is where I found out that 25 year old walnut (yes, the kit was 25 years old when I got it!) was pretty brittle.  Out of the six pieces I originally cut, only three survived carving out the hull profile.  The other three I made from the recently purchased 2mm x 4mm walnut.  It was much easier with the new wood.  I used my notepad with the various lengths to keep track of the fenders.  The poster board template I used to make the initial cuts is also shown.

 

7FenderDetail.JPG.888007aeaa4986823bcac3e5511c802b.JPG

 

 

7Fenders.JPG.f2038a4903223d4e4813eb8365d55009.JPG

The metal pieces were the next things I worked on.  As you can see, after banging around in the box for 25 years, they were pretty beat up.  I used steel wool on them, then re-sprayed them.  The taff rail was the only piece that survived pretty much intact.

 

 

7MetalParts.JPG.c5a238592c3608b8c16055c2c6cb9d24.JPG

I did the following detail painting on the metal pieces:

·        Bow Serpents – I painted in the grooves with brown.

·        Taffrail  - I painted the background brown to bring out the carvings.

·        Transom molding – After some research, I realized that it was the Royal coat of arms of the United Kingdom.  I tried as best I could to replicate that.  Given the size, I thought it turned out rather well.

 

 

The instructions had minimal painting instructions regarding the transom molding and none for the other pieces.  However, the pictures on the box had shown the painting indicated for the other two items.  All metal items, including the rudder hinges, were attached using epoxy glue.

 

 

The installation of the bow decoration, bow serpents and bow serpent bottoms were shown in Diagram 9 of the instructions, but no instructions were given regarding their installation. 

7BowSerpentPlan.JPG.984ade29d80edc95b9734ace6246ba2c.JPG

In addition, the bow serpent bottoms, which are indicated in the parts list to be metal, were missing from the kit.  I decided to carve them from some existing fir that I had available.  Here is how they looked after rough carving. 

7BowSerpentBottomRough.JPG.cbbd050943741f5d7b60be44a8bb55e8.JPG

In the end, I thought they turned out pretty well.  I filed down the attachment points on the bow serpents to more closely match the hull / keel surface and provide contact area for the epoxy glue.

 

 

    TIP:  The metal in this kit is very brittle and does not bend!  Believe me, I found this out the hard way!

 

7BowSerpentFront.thumb.JPG.2a8d81b5b31362a9137baf490e7a8e2e.JPG

 

 

7BowSerpentSide.JPG.544bf0d67197eba1a200c5d537b5d612.JPG

7BowSerpentTop.JPG.8daa84cfddf49c985910353d06cfbf80.JPG

The last item to be installed was the transom molding.  I thought that the windows provided in the kit looked unfinished in the molding (plus the lines framing the windows did not match the actual opening too well).  I decided to frames the windows with small pieces of Tanganyika wood (used for the decks and hull).

 

 

7TransomMolding.thumb.JPG.f8fd8055e7d3cd71484973822adcb90d.JPG

Lastly, I decided to put a little more color to the inside of the bulwarks, so I stained the bulwark with a maple stain and painted the stanchions black.

 

 

7BulwarkStain.JPG.a980ae1db1b3d50000ac8cfbd23e124f.JPG

Build time to date – 258.75 hrs: 57.5 hrs for the work in this build log entry.

 

 

MSS - Model Shipbuilding Simplified by Frank Mastini

 

 

 

 

 

 

Edited by Dave3092
Link to comment
Share on other sites

Hi Dave....looking good. A lot of work put into it over the past couple of months. Nearly at the deck furniture stage , then the rigging! 

 

Cheers..........Fernando :cheers:

Current Builds - Colonial Brig Perseverance 1807 by Fernando E - Modellers Shipyard - 1:48 scale

 

Previous Builds - 

S Lucia by Fernando E - Panart - Scale 1:30

Sloop Norfolk 1798 by Fernando E - Modellers Shipyard - Scale 1:36 

 

Link to comment
Share on other sites

  • 4 months later...

 

July 12, 2019

 

Deck Fixtures

 

This build log entry covers the fixtures (or deck furniture as Fernando calls them!) on the decks.  Given the conflict between finishing the deck and attaching the fixtures, I decided to build all the fixtures attaching the ones that I could where it would not create a problem when it came time to finish the deck.  For example, I attached the anchor davits and cleats to the foredeck, but I did not attach the ladders to the foredeck, as I needed to finish behind them.

 

Since I was doing so much work on the deck, I decided I needed a better holding mechanism for the full.  I added an angled brace to the keel in the front and a rubber band in the back to push it against the brace.

DSCN3317.JPG.0b0170587e4793395625cbc6ea81db0b.JPG

 

DSCN3318.JPG.aeecc597113fa881d8bc8a01309856a1.JPG

The first brace did not hold up, so this is version 2.

 

DSCN3407.JPG.9e6ba4fa9c8677d88385a150b25c43e3.JPG

There are a lot of pieces for this part of the project, so I used egg cartons to store the completed pieces until I was ready to install them.  This way I could keep them in order and tell starboard fixtures from port fixtures.

 

DSCN3393.JPG.d8aafea28c6a92ad79b771ff9f7e65d3.JPG

For all the posts in the fixtures, I added pins to help hold them in place (another recommendation by MSS).  This includes the binnacle, the belay pin racks around the masts, and the balusters for the railing around the quarterdeck.

 

DSCN3319.JPG.b64d89d5a28a242618234a3b7d0a68fe.JPG

To drill out the belay pin racks, I created a die from balsa wood so that the holes would be properly positioned and evenly spaced.  I used this technique for all the belay pin racks.

 

DSCN3320.JPG.e17548c36f6d2bc20efe693c8d674f4f.JPG

DSCN3321.JPG.660d053cee4e1873e9f7c28584df00c6.JPG

To try to make sure that the hatches and skylight moldings were square, I glued them together inside the square corner of a box.  I put wax paper underneath so that the fixture would not get stuck to the box.

 

DSCN3335.JPG.4ffbe642d7924419883e94b22e1d284e.JPG

In order to be able to drill the balusters for the quarterdeck railing, I created another die that would mark the center of the baluster so that I could drill it (there was not a lot of room for error on the baluster!).

 

DSCN3337.JPG.295683aba8ba6a24b8e7736e039041f9.JPG

Here is a completed set of balusters for one side of the railing.  I marked the top and bottom of the railing while side by side to ensure uniformity in baluster placement.  I used the end of a brad in the hand drill to make the corresponding holes in the railing and deck for the pins.  This same technique was used on the other fixtures with pins.

 

DSCN3391.JPG.fdd7952134d16a48d8aacb9439da7dad.JPG

Here are the decks with everything installed before the finish was applied.  The green tape masks off areas for gluing on fixtures that will be added after the finish.

 

DSCN3394.JPG.d95f780a33a83567584b289f23523777.JPG

DSCN3396.JPG.981f5361e1a6294f062a8234459aa513.JPG

… And here are the decks after finishing of the deck and the remaining fixtures, then installing everything.

 

DSCN3397.JPG.3b50a5aad131e92b4e2c552f6ff5e5af.JPG

DSCN3398.JPG.5ac2e7ed4541c3a5fd5becd62ea7d9fb.JPG

·        Anchor davits, cleats and bowsprit belay pin rack on the foredeck

·        Binnacle with bell, ladders, foremast belay pin rack, forward belay pin racks and cleats and the forward hatch on the main deck

 

DSCN3410.JPG.e2c9d111c32a01091ccd790f5e76e322.JPG

·        Second and third hatches and lifeboat cradles

 

DSCN3400.JPG.4388ce4b124711fadd04f8ceaec68d04.JPG

·        Pump, mainmast belay pin rack, middeck belay pin racks and cleats and forward skylight

 

DSCN3401.JPG.fa7e9e6daac7d2b44da9b86974e0a8d7.JPG

·        Middle skylight, ladders to the quarterdeck, helm and hatches to quarterdeck on the main deck

·        Quarterdeck railing (including belay pin rack), aft skylight and davits for aft lifeboat on quarterdeck

 

DSCN3405.JPG.320293afe32c7212860ffde2bc404438.JPG

Note:  The kit provided windows for the three skylights, but was short two windows for the second skylight.  I made up the remaining two windows using extra window in the middle window fore and aft, as they are the hardest to see (normally!).

 

DSCN3402.JPG.da5fdf35f515c6b6dfb1cbcc39447013.JPG

Build time to date – 319.75 hrs: 61 hrs for the work in this build log entry.

 

MSS - Model Shipbuilding Simplified by Frank Mastini

 

 

 

Link to comment
Share on other sites

  • 2 months later...

September 18, 2019

 

 

Last Touches to the Hull

 

 

 

This build log entry covers the remaining items to be attached to the hull / deck.  Before I start, however, I wanted to mention two things that were useful during the last build, but I forgot to mention.

 

 

To hold down things being glued to the deck, I created 3 sandbags, which had sand double bagged in plastic zippered bags.  They were very useful in applying pressure to the deck fixtures while the glue was drying.

 

DSCN3445.JPG.9bf803f21c900770c0963f4b400e843a.JPG

 

Also, I decided to update the wood inventory to compare what I had left to build with the material on hand.  This was important in deciding what piece of wood to use when it was not specified in the model instructions.  This proved doubly useful for this segment of the build.

 

 

167478875_WoodInventory.jpg.48c001933f2ec534781d5889ce667eb7.jpg

This part of the build covers the steps, shroud supports, lifeboats and cannons.  In some ways this was one of the most difficult sections, as there was little information on the construction of the lifeboats and cannons, and I felt the sparse mounting of the cannons was inadequate.

 

 

The wood inventory told me that but I didn’t have enough 2x3mm wood available to use that, so I used 2x4mm wood, which I have plenty since I had purchased an additional meter of it earlier.  I think the steps turned out well with that material.

 

 

DSCN3446.JPG.d17599f220610503349009414ecdd34e.JPG

When installing the shroud supports, I decided to add a 2x4mm beveled brace (since I knew I had enough) under the shroud supports to provide additional support to them.  It seems likely that would be helpful when rigging the shrouds later on.

 

 

DSCN3441.JPG.a12830df04e3861d24d7e184eddc6f1b.JPG

There were no instructions regarding the assembly of the lifeboats, so I had to improvise based on the diagrams and pictures available. 

 

 

DSCN3411.JPG.f17b78ae7bcc3ccd8aa5bded6c648f74.JPGDSCN3426.JPG.35b0644c492b0ee424fee485a4677e0d.JPGDSCN3425.JPG.be824d875ac7aa6d99192148cddf4ffe.JPGDSCN3412.JPG.58eeb779bf2b08e5bd5d1cf659bff9d0.JPG

Since the wood inventory told me that I did not have enough wood from the kit to provide the keels, railings or inner railings, I decided to acquire some wood that was just about the right width from a well-known, but unnamed coffee shop.  With a little sanding, they were the perfect width for those additions to the lifeboat hulls. 

 

 

DSCN3413.JPG.0488d2c9a2eb658be0bbd8c0e62a42db.JPG

Since the aft lifeboat was 75% the size of the main lifeboat, I made the keel, inner railings, aft bench and bow bench 25% smaller on the aft lifeboat, but I left the other bench sizes the same on both.  I installed the keel, railing and inner railing, then stained the railing and inside of the lifeboats.

 

 

DSCN3419.JPG.74a984a7f8dbf362b32211a76d3f98ff.JPG

The benches were made from maple lath and glued to the inner railing.  For the bow and aft benches, I made a tape template from the inside of the railing, and I used that for the first cut of the bench, then shaped as needed. 

 

 

DSCN3420.JPG.534ea2fc04bf80e5d022f2a561626444.JPG

After installing the benches, I shellacked the railings and interior and painted the outside of the hull to finish the lifeboats.

 

DSCN3421.JPG.458fd414f57bb396ea8b8344dc70ddae.JPG

 

 

In the kit, the cannons were shown on the deck with nothing holding them in place and no instructions about their assembly. 

 

 

DSCN3434.JPG.c46b6fd29662387567cd58e6863cc2c8.JPG

I thought that looked too simplistic, so I decided to add side tackles and a breech rope to each cannon.  I purchased the smallest blocks available from Modeler’s Central and used tan sewing thread for rope.  [Kudos to Modeler’s Central – four of the blocks were misdrilled and they sent me replacements free of charge!].  I also added an elevation block to each carriage.  It was shown in the diagram, but not mentioned in the instructions. 

DSCN3424.JPG.b61d7d82a3f0b5c89a02888cdf00f434.JPG

DSCN3422.JPG.7079eed81aa4caa9af33dfca3ebcff41.JPG

I also drilled a hole on each side of the cannon carriage towards the rear to mount the side tackle block.  I positioned the cannon carriages on the deck, which was covered In tape.  I marked the position of the wheels, then cut out the tape and sanded the exposed deck so that the glue would adhere.  I then glued the carriages to the deck.

 

 

DSCN3429.JPG.da3c9404f6ace56c0cef06dde2c942e9.JPG

DSCN3431.JPG.08d829f75132488af72699867431374d.JPG

I stropped the blocks with #34 gauge black annealed wire (a suggestion from MSS).  I used an alligator clip to hold the block while attaching the strop. 

DSCN3435.JPG.afd2391ded5f22109031448c58798e09.JPG

I then attached the breech ropes and side tackles to a set of half ring with a straight end.  After building each side (for 4 cannons), I inserted the straight ends into holes drilled into the deck.

 

 

DSCN3430.JPG.f6ba7038d7654c13c3003568d4480164.JPG

I then installed the side tackles and breech rope securing the side tackle block to the cannon carriage.  That was followed by installation of the cannon with the holding brackets followed by attachment of the breech rope.  I completed the cannon installation by winding the appropriate amount to rope to run out the cannon next to each side tackle.  There were created by winding them on two-sided tape, then applying shellac to hold them together.  I then lifted them off the tape and installed them on the deck overlaying the end of the side tackle rope.  [This technique was suggested by barkeater in the Rigging Forum].

 

 

DSCN3432.JPG.b69faacffe8135646c3feaea11af6d88.JPG

DSCN3433.JPG.47737cb951d9e9bf999a01553ace5c2b.JPG

After the cannon were installed, I attached the main lifeboat amidships.

 

 

DSCN3438.JPG.413b7b4cfb7b5d5d56eec52003c4e249.JPG

 

Finally, I marked the waterline on the hull.  After fooling around with a pencil and bracket, I realized I could use a laser level, sitting on my toolbox.  As long at the hull and laser level are both level, it makes it very easy to draw an even line across the contours of the hull.

 

 

DSCN3440.JPG.0af24a77e5888827a6211b1daa12d561.JPG

DSCN3443.JPG.3ba8f773c5ee560975220e2708c8c742.JPG

Build time to date – 374.5 hrs: 54.75 hrs for the work in this build log entry.

 

 

Next: Masts and yards

 

 

MSS - Model Shipbuilding Simplified by Frank Mastini

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Edited by Dave3092
unneeded pictures in post
Link to comment
Share on other sites

  • 1 month later...
  • 2 months later...

 

 

January 18, 2020

 

 

Masts & Yards

 

 

 

This build log entry covers the preparation of the masts and yards and assembly of the masts.  However, before I started on that there were a few items remaining to be done on the hull.

 

 

The shroud supports had been glued to the hull, and now the deadeyes had to be installed.  This is when I found out that the shroud supports for the foremast and mainmast were not symmetrical (see 3rd picture below).  The deadeye slots were closer to one end than the other, and the way they were manufactured and labeled caused them to be offset differently on each side of the ship.  I tried to compensate for that (as well as even out the spacing) when I widened the precut slots to accommodate the deadeye holder.

 

 

Note:  The metal parts in this kit have no deformation capability; they just break.  I found this out trying to bend the deadeye holder around the deadeye as indicated in the instructions.

 

 

To properly align the deadeyes to the shroud lines coming down from the mast, I construct substitute masts of the correct height, then ran thread down to each deadeye slot, so that I could determine the proper angle to put on the deadeye link when mounting it to the hull.  This was suggested in MSS.

 

 

10ShroudAlignmentl.thumb.JPG.62ae6627b9d6e256767f582dc7cd00f8.JPG

For the mizzen mast deadeyes, I found that the provided deadeye links were too long for the hull that is available at the stern, so I shortened and re-bent the link to fit the available space (this is the only metal that is pliable).

 

 

10MizzenShroudLinksl.thumb.JPG.6bcea8f4b78de70c56d180de39fa1b59.JPG

After installing the deadeyes, I covered the edge of the shroud support with a piece of mahogany lath, which seem to blend very well with the shroud support wood.

 

 

10Deadeye2l.thumb.JPG.b46279594f30a705e36777773166e599.JPG

The second item was crosshatching in the bow.  It is shown in one of the instructions …

10BowGrid1l.thumb.JPG.c9bc4a0fec7f13c25f1fecfe54d245e6.JPG

and the material is provided for it, but there is no mention of adding it in the instructions.

 

 

To fit the material in the bow space, I created poster board templates for the port and starboard sides to give me a starting point for cutting out the crosshatching. 

10BowGrid2l.thumb.JPG.97878a82ee1a7e4387e0b7ee74fee870.JPG

I then put together a grid of laths to accommodate the templates, cut out the pieces, and sanded them until they fit into the bow area.  These will be installed after the bowsprit woold is completed.

 

 

10BowGrid3l.thumb.JPG.3c715a832608f1c8d4d42c46782640e5.JPG

Now that I was ready to start on mast construction, I started by building the masttops and crosstrees for each mast.  Although not indicated by the instructions, I added a chock between each mast for all the masttops and crosstrees, as suggested by MSS.  I believed this would aid in aligning and securing the masts during assembly. 

1089755816_10MasttopsCrossTreesl.thumb.JPG.d9718b01a2e11738a3f46210dd042e1f.JPG

For the main and fore mast masttops, I added bolsters, also suggested by MSS, to protect the shroud lines extending down from the masts.

 

 

10Bolsterl.thumb.JPG.9b6001a0905be55576b6526c59539595.JPG

I then proceeded with cutting and shaping the masts and yards.  I drilled holes in a 2x4 and labeled each hold with the respective mast or yard putting them in order from stern to bow.  I cut out all the masts and yards from the supplied material leaving excess material to be used to handle the wood through the shaping process. 

1294764658_10MastYardsl.thumb.JPG.106365b386aa71f94bd0893f1027b874.JPG

I shaped the masts and yards as needed by setting up a homemade lathe using my electric drill (another MSS suggestion) with a loop of Velcro (felt side) to hold the other end of the wood.  The other piece of Velcro was over the trigger to keep the drill on.

 

10HomemadeLathel.thumb.JPG.1b714adb96f1a15b1aa6e7a31659b8f6.JPG

 

As I mentioned previously, I had built square mast boxes in the hull for the three masts, so I now needed to square up the masts to fit into those boxes.  I did that by placing the mast into the vice, leveling both, then filing down each side of the mast – another MSS suggestion.  I did the filing iteratively with testing the fit into the hole until I achieved a tight fit.  I then labeled the side of the mast facing the bow, so that I could build the rest of the mast segments on top facing in the correct direction.  I used the same process to square the tops of the masts.

 

 

10MastSquaringl.thumb.JPG.07fd2365f0a070e24f2d8718e9f5a74f.JPG

The mizzen mast boom and gaff required yokes, which again were indicated but no material was provided.  So I fashioned the yokes out of a bit of oak by drilling the mast hole, then cutting the yoke out using the hole as the base.  In addition, I drilled a hole in the bowsprit mastcap for the martingale. 

10Yoke2l.thumb.JPG.18278dca6e94898127155da06eda9679.JPG

The yards, booms and mastcaps were supposed to be either dark walnut (instructions) or black (paint diagram).  I chose to go with the former.

 

 

10Yoke3l.thumb.JPG.d1f19ecfc6c9b023a3be4aa9a88bdf22.JPG

The last thing to add was the mast woolds on the main and fore masts (see picture below).  Here the amount of 0.8mm hemp rope was completely inadequate to do the woolds, no less that other uses for that diameter on the ship, so I had to order some additional rigging line.  Now that I was ready to assemble the masts, I first ensured that the workbench was level.  Since the masts sit vertically in the hull, then I could everything as it was being added with a level.  In addition, I verified that the masttops and crosstrees were parallel to the deck planking, and I tried to make sure that masts were parallel where they overlapped.

 

 

10MastCompletedl.thumb.JPG.dcd1c1d50481bf466d5eaa8a691a1ea9.JPG

I also verified that all the masts were aligned when looking from bow to stern and vice versa.

 

 

10MastAlignmentl.thumb.JPG.e4cd5c2e1561d9992a03ee81b1aec31d.JPG

Since MSS recommends rigging the masts before stepping them, I inserted the masts into the hull for assembly, but I did not glue them to the hull.

 

 

10MastNextStepl.thumb.JPG.86682e446a386ab3f09b0b23d52b07c1.JPG

Lastly, I put a rope gannion on the bowsprit jib.  It wasn’t shown in the instructions or diagrams, but it did appear in a diagram in MSS, plus it makes a lot of sense to hold the jib boom in place.

 

 

10BowspritGannionl.thumb.JPG.f7431eff94b36593c324ac1ed903fbc2.JPG

Build time to date – 434 hrs: 59.5 hrs for the work in this build log entry.

 

 

Next: Rigging

 

PS - 95% of the time was in preparing the materials; only 5% of the time was spent in actually constructing the masts.

 

 

MSS - Model Shipbuilding Simplified by Frank Mastini

 

 

 

 

 

 

Edited by Dave3092
Minor corrections
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...