I received this hull of the Cutty Sark back in 2013. A friend of my son gave it to him to give to me. It has sat in my boatyard all this time. Back in March I started working on by planking the deck. 

 

post-1157-0-56210300-1367280718_thumb.jpg

 

post-1157-0-88236100-1367280737_thumb.jpg

 

post-1157-0-32156200-1367280728_thumb.jpg

Share this post


Link to post
Share on other sites

This planking was started in March as you can see there wasn't  a false deck. I had to put in wood block in order to support the decking. The planks were marked with a black magic marker. 20180313_190913_001.thumb.jpg.c5d64cb4a74d9098a1d11ecae9a93d0c.jpg

20180227_162218_004 (1).jpg

20180314_173137.jpg

Share this post


Link to post
Share on other sites

After the deck was planked I moved on to building the deck houses and other deck fittings. As I have no real plans I used the Billings plans and a copy of the Scientific plans. I believe that the deck house on the cutty was smaller than this one. April 2018 - June 2018

20180314_173237.jpg

20180407_161625.jpg

20180407_161634.jpg

Edited by Cuda1949

Share this post


Link to post
Share on other sites

The deck houses are not glued onto the deck as I am currently working on attaching the rails and deadeyes. I also have the two bathrooms built and the winch and chain. This was completed on July 7, 2018.

20180707_114746.jpg

Share this post


Link to post
Share on other sites

In order to attach the deadeyes inside the bulkhead I attached and glued the bass wood strips to the deck. 

20180808_173135.jpg

20180808_173142.jpg

Edited by Cuda1949

Share this post


Link to post
Share on other sites

After the glue dried on the bass wood strips I attached the railing and drilled holes into the bass strips so the deadeyes would be able to be glued in place.1938995895_20180811_211800(1).thumb.jpg.bf3a860900f4269884faafbfdf7066ef.jpg

20180811_211806 (1).jpg

20180811_211806.jpg

Share this post


Link to post
Share on other sites

Currently awaiting delivery of Longridge's books but in the meantime I have installed the deadeyes for all the masts. I have glued in the two chicken houses and the two bathrooms. I also installed the stanchions on the foredeck. 20180822_160847.thumb.jpg.d29887a4b16108f963f75bd3276b4116.jpg20180822_160855.thumb.jpg.6656186a60ab443028b254c759f09245.jpg20180822_160900.thumb.jpg.452642b6101527869db417c496654d55.jpg

Share this post


Link to post
Share on other sites

You're doing a fantastic job bringing this model back to life...what a gift to have been given.  One thing, If I may...you might consider bringing those deadeyes up closer to the rails...l think you'll appreciate it when you begin to rig the shrouds...More to scale and such.

 

Great job.

 

Rob

Edited by rwiederrich

Share this post


Link to post
Share on other sites

Longridge's books arrived and after some investigation I have started on the masts, I also have made two pin rails with the belaying pins.  I took the advice from the books and made a stand to build the masts off from the ship. Much easier to work on.  The ship in the background is a sib of the Flying Cloud awaiting insertion into a bottle.

20180911_171413 (1).jpg

20180911_171132 (1).jpg

Edited by Cuda1949

Share this post


Link to post
Share on other sites

Hi Al

 

Nice work!  The Cutty Sark is such a beautiful and iconic ship and you’re definitely doing her justice with your model.

 

Keep the great work coming.

 

Cheers. 

 

Patrick

Share this post


Link to post
Share on other sites

And so it begins. I have completed the build of the foremast. I am currently rigging the deadeyes on the upper part of the mast. Quite a challenge using small deadeyes what with my big fingers lol. Also received The Neophyte Jackstay what a great reference 20180923_164752_001.thumb.jpg.c739fa4c9ec5c54d5ea826d509ffa100.jpg20180925_164143_001.thumb.jpg.3cc4b7fbd28780282b379631d81ed5fb.jpgbook.

20180925_164138.jpg

Share this post


Link to post
Share on other sites

Latest update. Foremast is finished and has been placed on the ship. Now I am working on the main mast just started rigging the dead eyes and started to rig the upper shrouds. 

20181005_175125_001.jpg

20181005_175149.jpg

20181005_175153.jpg

20181005_175206.jpg

Share this post


Link to post
Share on other sites

Two down one to go. Finished the main mast. Now on to the last mast. I also added a railing on the top of the rear cabin. 

20181007_114355_001.jpg

20181007_114406_001.jpg

20181007_114526.jpg

20181007_114444_001.jpg

Share this post


Link to post
Share on other sites

The last mast is done and placed in the deck. The deck houses are placed on the deck ready for gluing. Now onto the bowsprit.

20181018_184847.jpg

20181018_184858.jpg

20181018_185108.jpg

20181018_185010.jpg

Share this post


Link to post
Share on other sites

Bowsprit finished and starting to glue down deck houses etc. Pin rails in place,  glued down as well as chain crank (?) and hatch cover. Next is forming the spars and finish the rigging. 

20181024_173043.jpg

20181024_173132.jpg

20181024_173102.jpg

20181024_173052.jpg

Edited by Cuda1949

Share this post


Link to post
Share on other sites

So I am starting to rig the lower masts but really did not have any place where I could work on the rigging as the table is too low and the ship too tall to fit on my work desk. So I built a rigging stand so the deadeyes are almost eye level. 

20181105_130618.jpg

20181105_130433.jpg

Share this post


Link to post
Share on other sites

So I have finished the rigging for the shrouds 6 on each side for the fore mast and main mast. 4 on each side for mizzen mast. I have glued the deck houses ( all except the one on the poop deck). So I guess I will start the spars although I am not sure how I am going to attach them to the masts. When I build by ships in bottle I drill holes through the mast and through the spar and tie it to the mast. I read somewhere that you can do it by using a piece of wire. Guess trial and error.  Happy Thanksgiving to everyone.

20181121_174141.jpg

20181121_174150.jpg

20181121_174154.jpg

20181121_174123.jpg

Share this post


Link to post
Share on other sites

So after some research I realized I had placed the front deadeyes and lines in the wrong position. I am in the process of  correcting this. 

 

My question is I am ready to build the spars and I am not sure How to attach them to the masts? My first full sized build so any help is appreciated.

 

 

Share this post


Link to post
Share on other sites

Two ways that I know of Al.  The best probably is it pin the yard to the mast in the proper location.  The yard should at least be completely ready for it's rigging or even pre-rigged.  The other way, and I'm not a fan of it, is to rig the yard, hoist it aloft using the rigging and them a spot of glue to hold it to the mast.  You might have a look at way Rob is doing his:  

 

Share this post


Link to post
Share on other sites

Hi Al

It depends on whether you want to do it as per the real boat or not, each yard had a metal truss of different shapes and slings to hold up, the different similar trusses can be seen in Ed t's young America log and there are pictures for most of the yards in Longridges Cutty Sark vol 2

Or of course you can do it like Mark said with a pin or glue, the amount of metalwork required for the sarks yards is  quite incredible as can be seen in eds log, remember also that originally the sark's yards were iron and had considerably less bands than a wooden yard

Hope that helps

Regards

Paul

Share this post


Link to post
Share on other sites

Well, I think you are doing a fine job sir. I will pull up a chair and follow along if I may. 

 

Mark

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Recently Browsing   0 members

    No registered users viewing this page.

About us

Modelshipworld - Advancing Ship Modeling through Research

SSL Secured

Your security is important for us so this Website is SSL-Secured

NRG Mailing Address

Nautical Research Guild
237 South Lincoln Street
Westmont IL, 60559-1917

About the NRG

If you enjoy building ship models that are historically accurate as well as beautiful, then The Nautical Research Guild (NRG) is just right for you.

The Guild is a non-profit educational organization whose mission is to provide support to our members in their efforts to raise the quality of their model shipcraft.

The Nautical Research Guild puts on ship modeling seminars, yearly conferences, and juried competitions. We publish books on ship modeling techniques as well as our world-renowned quarterly magazine, The Nautical Research Journal, whose pages are full of articles by master ship modelers who show you how they build those exquisite details on their models, and by maritime historians who show you what details to build.

Our Emblem

Modelshipworld - Advancing Ship Modeling through Research
×