Jump to content

IgorSky

Members
  • Posts

    1,651
  • Joined

  • Last visited

Everything posted by IgorSky

  1. Then I placed the bottle on another slipway, pulled out all the gear of the standing and running rigging, fixed their CA, cut off the ends and set the flag in the stern.
  2. Then I took the model off the slipway and stuffed it all into a bottle, applying some silicone sealant to the bottom of the bottle beforehand. I placed the boat's hull diagonally and left it to dry.
  3. I made more thinner rigging yarns, made new stay ropes, finished the running rigging, added the tiller, the flag on the bowsprit, painted the underwater part with copper and reassembled the whole structure on the slipway
×
×
  • Create New...