Jump to content

Papa

NRG Member
  • Posts

    1,219
  • Joined

  • Last visited

Everything posted by Papa

  1. One more painted rock. I think another week or so and I’ll be ready to go back to my ship model.
  2. More rocks. I need a long break from rigging.
  3. taking a break from rigging the Charles W Morgan by painting a few rocks.
  4. Yards are coming along slowly. The lines all need some tensioning and adjusting. I am planning on simplifying the rig. Basically if it attaches directly to a sail it isn’t going on.
  5. Thanks. I should have painted on something more permanent. Time and weather sent the pumpkin to the great pumpkin patch in the sky.
  6. The lifts for the fore lower yard belay to the pins on the mast ring, 19 and 20 on the belaying plan. should they go through the fairlead mounted on the foremast?
  7. Now needed a Fall theme for the next holiday.
  8. Using John Ruy’s technique. Not as easy as it looks. The little nubs keep breaking off. Takes lots of superglue and patience.
  9. Scale is 1” to 1”😀 thanks for the nice comment.
  10. Thanks. That looks perfect And I believe I have a stash of 1/32 square strips many thanks again
  11. The kit contained several strips 1/32" strips of jackstay material that I used them all up on the mizzen and bowsprit (or possibly lost some over time). Now I've noticed that the yards all need the strips also. Model Expo does not seem to sell the strips separately, nor does any other fitting supplier I've look at. Any recommendations on how to scratch build these? Could they be 3D printed?
  12. For Halloween I decided to paint a pumpkin instead of rocks😁
  13. I have all the davits in place. They needed a bit of adjustment in position to avoid other structures. Also at about the 3rd davit stay I discovered that the stays should be wire not thread. There is a note on the plans that the stays are light yellow ocher. Ooops. Removed the thread and now using wire. Next I need to do the bearers, cranes, and skids. I really pays to study all the plan sheets thoroughly!
  14. I tried small brads into drilled holes. That seems to work. Here is the port stern set up including a boat placed temporarily. Now, do i want to rig the boats as the davits are in or wait until much later in the build. Say after the running rigging is in.
  15. It has taken me a week or more just to get 1 davit, 1 lashing post and one crane in place. There is not much glue surface and they keep coming loose. Plus i can’t focus on the fine details as my cataracts are worsening. I hope to finish up one complete rig at the port stern today and post a picture. I am thinking that it would help to use a fine brad to help support the posts.
×
×
  • Create New...