Jump to content

wolfxserver

Members
  • Posts

    4
  • Joined

  • Last visited

  1. With the nose pieces installed the sanding began. There's a great deal of wood that needs to be removed to provide a smooth transition surface when planking.
  2. The Bow upper nose piece requires 2 gunports to be cut. After cutting and squaring up I trimmed the inside walls with walnut strips.
  3. Framing and lower decking in place. For some reason my upper bow nose piece will require a smaller spacer to fit snug. That will happen after gun ports have been cut out.
  4. Greetings to all. This will be my 1st Build Log but have been a long time lurker. My history of ship building includes Constructo HMS Grimsby, Constructo Pandora, and last with my skills sharpened Panart San Felipe. I'm not in much of a hurry when building these but more importantly, always finish what I've started.
×
×
  • Create New...