Jump to content

Civil War Ironclad USS ST. LOUIS by thorn21g - 1:24 - POF - Gateway Model Shipcrafter's Guild


Recommended Posts

  • 4 months later...

Again apologies for the delay in  posting these pictures and captions. These are from January, 2021 and entail a variety of smaller  projects, such as engines, hurricane lanterns described in the previous post, using rope splicing fids and rigging of the cannons. These projects were done by Bill Kammermeyer (who is the source of the pictures and captions), with assistance from Bob Keeler, Mike Orgel and Vince Murphy.

 

ENGINE REWORKED

                                                                      image.png.abb79f803549b17c974bc371e641e46c.png

 I had the steam engine positions reversed and needed to place them in their proper positions with new live steam wrapped pipes in their proper positions.

 

                                            image.png.91bfbf3714f3d13946c657497c6de639.png

Entry points of live wrapped steam pies on outboard sides of engines. Oil lamps may be seen on the backside of boiler room ventilating screen (BK 12/07/20)

 

OIL LAMPS

image.png.a6ba51b9d2760c36bc2857156c0ed309.png   image.png.df21db0afe790d95e00d4102ae454867.png

Hurricane lamps that I made earlier are now in position around the boiler room ventilating walls. (BK 11/18/20)

 

DETAIL OF ENGINE ROOM LADDER

 

image.png.a94f86a5e8f6c131567385df9cd9c5f9.png  image.png.7bf6ba5a22e7ffbc11fe6a722f88e5f6.png

                                                   Detail of engine room ladder and walkway rail. (BK 1126/20)

 

ROPE SPLICING FIDS

 

image.png.a7b9321c2cdb4ec604dd93ff6388b600.png image.png.10575ecac904a49c4d0060d3fe7b8284.png

Rope splicing fids made of brass tubing and brass rod, soldered and ground to a fine point make faux splicing a snap! (BK 12/01/20)

 

CANNON ATTACHMENT TO DECK

 

                                                                          image.png.715d5dc2339088055cfec44ad442d89a.png

Breast plate and deck 1/8" drilled, breast plate 5/32" drilled then 7/32" top counter sunk for 1-1/2" X  6" finish screws. (BK 12/15/20)

 

                                                                 image.png.7c7155a15016a43440e4176dff5d4947.png

Carriage being attached to deck through the gun port. Screw will not show and cannon will be reock solid. (BK 12/15/20)

 

                                                                image.png.16e891cf50376b3d746a75ee30b8eab0.png

                                            Now, barrel, cap squares and pins may be installed. (BK 12/15/20)

 

                                                     image.png.1ab1d6fb97d6649789c6b5b31a221b66.png

                                Maple grating that Mike cut and I assembled and sanded to fit all the gundeck hatches. (BK 11/11/20)

 

LOCK PINS ON CAP SQUARES

 

                                                                                image.png.bc5e51a1b4456e6bb3ae2ba18613a297.png

18 Gauge brass wire, on left, bent, flattened, and drilled. Same wire bent, crushed, fit with a fid, trimmed and soldered. Penny for scale. (BK 12/12/20)

 

                                                                 image.png.967dd715d20030d4fec57e85a69988e9.png

Since barrels and cap squares must be installed through the gun ports after the carriage has been screwed to the deck, fid is soldered in place and unit acts as a nail. Finished on top, rough at bottom. Penny for scale. (BK 12/13/20)

 

INTERIOR GUNPORT DOOR LIFTS

 

                                                                        image.png.25cde24d15e434e0040cf12ea40cb481.png

12 Gauge copper wire flattened, punched, drilled and end rough shaped while on long wire. Shaped with 80 grit sanding disc. Wire cut and other end finished in the same way while in a clamp. (BK 3/4/20)       

 

                                                     image.png.5f8954d85db788f42323cc85b606dd39.png

                              Cleat attached to inside casement with gun port lifting rope in place. (BK 12/20/2020)

 

That's all for now, more coming in short order. LOT of stuff in this January 2020 edition, 

 

Tim
                   

 

 

 

 

 

image.png

image.png

image.png

Link to comment
Share on other sites

More stuff from January 2021:

 

CANNON TRAINING TACKLE:

 

                                                             image.png.9b1b8ad0e527839842ed8298194b2a57.png

Jig that I used to hold blocks while rope is rove through them and then gathered and tied in ship shape fashion in the center. (BK 2/20/20)

 

image.png.5bd2c87fe9f84ba83264934d40ebe2a9.png

While still on the spreaders, the rope is dampened with Aleene's Fabric Stiffener and tied with lighter cord. (BK 12/17/20)

 

image.png.123505219855feec0acac4e44bf83c40.png

In just a few minutes, the stiffener dries to a flat finish and holds the rope in a very natural fashion. BK 12/17/20

 

image.png.fd834fb80f4866a1a644f16daf27b260.png

When I am ready for the final installation of the cannon, I will wet the rope near the blocks with more stiffener and push down until dry to give the appearance of natural weight. (BK12/19/20).

 

HURRICANE DECK LIGHTING

                                                        image.png.f4b5659b2a21205691ae4963b308f93b.png

 

 

1/8" wide LED light strip in "beam trough " that hides the strip from view, yet focuses the light down onto the deck. (BK/BobK/MO 12/26/20)

 

image.png.a18c5be7abf96ed444492ede718b12d1.png

 The amount of light generated from the LED strips makes a dramatic difference on the detail in the interior of the ship. (BK 12/26/20)

 

image.png.a367fa6044486b8e16d7d48b26e9d2de.png

This view of the LED strip is completely blocked from normal viewing by the trough built around it. (BK/BobK/MO 12/26.20)

 

CANNON TOOLS:

 

image.png.f2714cfc4472b246d93537d58c49d286.png

Cannon tools that I previously made were attached to racks that Tim Jovick and l made last year. The tools were fit and glued to the racks and then the racks glued and nailed to the 45 inside casement as a unit.  Ready to use and out of the way. (BK/TJ 12/27/20)

 

image.png.84002cb67f28b4e5720f9c8f20e48c65.png

 View of bow cannon tools, ammunition boxes, and tool boxes.  Open padlock on green chest while the yellow chest is locked.  Fused bombs are in the blue ammunition chest for the 8" smoothbore at the center bow casement. (BK 1/2/21)

 

image.png.5bd92bc6fb545027e8ab06cc0a35a881.png

 

View down the starboard gun deck showing the angle at which the racks and tools are attached. Also, how they are attached and out of the way. Scale man at right. (BK 1/2/21)

 

AMMUNITION CHESTS AND LOCK MANUFACTURE:

 

image.png.98051f90014bc74bea1010cccc1217e4.png

 Ammunition chests with 32- lb. cannon balls (green) and 8-inch fused bombs (blue) in racks. Bright and blackened padlocks showing how I made them.  (BK 12/31/20).

 

image.png.bae4a2730268d71f10415462231c73a8.png

After painting chests with craft acrylic paints and a period of drying time, they were given a coat of walnut stain to darken them and give shadow definition to all recessed areas. (BK 12/28/20)

image.png.be14278c1a7cf3660e24a660d7d24fe4.png

Padlocks were made by punching discs from 3/64-inch brass plate. By moving the punch a bit into the last disc hole, a clip was made in the current disc.  The center dimple is part of the punch process. An added punch point, with luck, makes the bottom part of the keyhole.  Flattened ends of 18 Gauge brass wire were soldered to the back of the blanks to make the shackles. #45 drill bit formed the i.d. of the shackles. BK 12/30/20

 

image.png.5dbc5de33204f3cf72311d8fe86cf39b.png

 

image.png.3888c039c86f9b8eb5b29916ef8aa2b5.png

These shots show how well the stain picks up the detail on the wood and hasps. The padlocks look relatively realistic considering the penny for scale next to them. (BK 12/31/20).

 

 

MAKING FIGURINES 1/24 SCALE

 

   We have been using a couple of 1/24 modified figurines for reference over the course of this build (you’ve likely seen the guy with the shovel at various places around the boat). The plan is to make perhaps 25 uniformed figurines (both officers and seamen) at a number of places around the gunboat doing various functions (e.g., cannon crew).

 

   As mentioned previously, we learned how to make figures from Bob Temper, by fashioning “skeletons” out of scrunched-up aluminum foil, with clothing and heads made from Sculpey.

 

   More recently, we purchased a number of solid 1/24 male figurines from Schaefer’s, a local Hobby Shop, with the intention of cutting off the heads, arms and legs (in two parts) and then casting them with the intent of reassembling them in whatever position we wanted. Vince Murply has made a number of such heads, with the help of Fred Hecker. 

 

image.png.c19ad8e26f504a13cf977ea2a2f78b53.png

1/24 solid male figurines, purchased from Schaffer’s Hobby Shop (VM 01/20/21)

 

image.png.747ae33670cf3806834b15100503ad73.png

Cut-apart (head torso, arms, legs) 1/24 figurine (used by Bill, for reference), along with Alumilite brand silicone mold kit, including high-strength mold material, mold-release solution, and measuring cup and scoops. (VM 01/20/21)

 

image.png.d05c6e2dcc0cfe1542ae327f49e6a6ca.png

Early attempts to make molds. The clips on the device are to hold the heads in the mold (which is in two parts) so they won’t sink. The syringe holds the casting solution. (VM 01/20/21)

 

image.png.5b526d32c09968c98067ff4e910d9c1f.png

2-part mold box with holes in front and back panels. The head from the figurine is suspended by a wire passed through the holes to keep it in place. The insert with pegs is to align the two halves of the mold. The insert is put into the box, then the head is suspended, and the mold material is poured in, only half-way. This half is allowed to completely dry, then the red solution is brushed on before the second half of the mold solution is poured in, so the mold halves will not stick to each other. (VM 01/20/21)

 

image.png.f6b95d548ac18e45c73dd46cca97e810.png

Silicone molds for two-part casting, along with two heads cut off the 1/24 scale figures (VM 01/14/21)

 

image.png.98564cc3901d3e7d2874a57b632a5211.png

“Smooth-Cast” two-part casting solution, provided by Fred Hecker (VM 01/14/21)

 

image.png.0ad03b79c710fca3a9aa204dc6d14290.png

Silicone Casting forms for two-part heads, plus completed heads (VM 01/14/21)

 

image.png.35f613fa80c4f2e5e32119415f1b6de9.png

Cast heads, formed from two pieces (front and back), separately cast from silicone forms (VM 01/14/21)

 

image.png.30d72c63aa21b51edeb760f31a075e59.png

One-piece heads (longer necks) (VM 01/14/21)

 

image.png.b63cc1b36f8607dd956dbd7cf02acbfe.png

Both one- and two-piece heads, with their silicone molds. Penny for scale. (VM 01/14/21)

 

OK, that's all for today. Next submission will look at an alternate method of making figurines using wire armatures for the "skeleton," if you will, plus more about making heads. 

 

Tim

Link to comment
Share on other sites

Hi all, here's the next installment of making figurines: again unless otherwise noted, pictures and captions are by Bill Kammermeyer:

 

 

 

(MAKING FIGURINES, CONTINUED)

 

Another method was to build armatures for the “skeleton” out of wire, and then fill out the body and clothing with Sculpey. The heads could either be provided by those cast from the 1/24 purchased figurines or made from Sculpey using a toothpick as a tool for details. Bill has done that work.

 

image.png.b0d40af49024ae853a81a98dfa3b1d9d.png

A simple wooden jig used for maintaining scale consistency for the wire armature used in my figure construction. (BK 1/6/21)

 

image.png.e08ceecba73f80b5fb3298672370eb11.png

Torso is 14 Gauge copper wire bent into a "u" with the ends and bend flattened.  It is soldered to an arms-and-shoulder wire with a yoke bent into the center for the neck hole. (BK 1/6/21)

 

image.png.4a6d237d128b088de329339c949eeb3c.png

Yoke for neck hole shown, and head armature in a pin vise. (BK 1/6/21)

 

image.png.d6a65e54ed02bd8b661fe497d06c7ce5.png

Lower figure in the soldering jig, the upper armature is ready for animation. Note the recess holes beneath the solder joints. This allows the wire to heat to soldering temperature without the wood acting as a heat sink. (BK 1/6/21)

 

image.png.99347c812308795857ef2be012b70c8f.png

The torso is first tinned at the soldering points and then soldered to the arms-and- shoulders wire with the yoke facing the figure back. That assembly is then removed from the clamp and laid on the pre-bent legs, and soldered at the tinned touch points. (BK 1/6/21)

 

image.png.2dc04366a6cf86d7ee56f75beaa24692.png

 Shallow notches are cut at the backs of the knees at the mark on the jig. Bent and filled head

 

image.png.4780771d7de3d0aa5a3d5c0704009747.png

Let the animation begin! (BK 1/8/21)

 

image.png.5eae34cf327ed523137abb5d1dbcc4c3.png

22-gauge bell wire was wrapped around the 14-gauge scrap copper wire armatures to give the clay more purchase surface. (BK 1/8/21)

 

image.png.59aaec640603070c9e7f229bf5d82bb7.png

An L shaped 3/64" brass rod was soldered to a foot with an aluminum clip heat sink in place to protect previously soldered joints. (BK 1/8/21)

 

image.png.58c62bf83e52de1ead3b0286ff5a51e8.png

Protective aluminum heat sink clips made from old hair-styling clips. Nothing fancy, but they protect the previously soldered joints. (BK 1/10/21)

 

image.png.707525c685ec4cf7aa2a443dabf014bf.png     image.png.786644af2c19258416b1622614f1157c.png

The foot pegs in a hole make animating the armatures much easier. Bell wire extending beyond the flattened hand sections will be a support for a thumb when figure is gripping an object.  I will now start bulking the bodies with clay as in the figure on the left. (BK 1/9/21)

 

 

SCULPTING CREW HEADS

 

image.png.14b64119d20ac2ac5bb979defab7a03f.png

Steps for sculpting crew heads, left to right.

16 Gauge wire is bent into a 1/4-inch eye and soldered. Sculpey clay is packed into eye and heat-hardened. That is then sanded into a plug and wrapped with a thin layer of clay. Using only a toothpick at this time, horizontal eye dents are made, followed by vertical nose dents.  Horizontal dent is made below nose and rolled up creating basic nose and upper lip. (BK 1/22/21)

 

image.png.0875b309850b4b40adf086b555b8ae10.png

(view progress from right to left) Pupils are set with a toothpick end, in line with corners of the mouth.  All movement of clay at this time is made by rolling the toothpick lightly on the surface of the clay. Excess clay is rolled down neck and cut off with an X-Acto knife. Rolling toothpick in a trial-and-error fashion creates facial features.  I have about 6 minutes of sculpting time invested in the head on the left at this time. (BK 1/21/21)

 

image.png.14b91f5ce5ecb5ad718c4043d606de2b.png             image.png.1a82638ddbadb2d8203b9b5a1864825d.png

 Ears are now added by rolling a 1/8-inch ball of clay, cutting it in half, balling it again and sticking each small ball to the side of the head about eye height.

 

image.png.76802ad9795bc637f367dbf9bbcd6b35.png          image.png.5f721ff2ef9d87d29beace3886afb0ce.png

A rounded rod is touched to the center of the disc and worked out in an ear shape, the front of the ear flat with the face. All clay at this time is moved by rolling the toothpick or tapping with the rounded rod. (BK 1/21/21)

 

image.png.187b955955afc96f3d1061428328d043.png

A pin on a stick is used to tease out the whiskers on his pork chops and hair. A thin strip of clay is added under the nose and teased with a pin to make his mustache.  (BK 1/21/21)

 

image.png.bcb7f262e62c09d16184ec769e7efce9.png

The soft clay is hardened with a heat gun and the top is sanded flat to the top of the copper eye.

Penny for scale.  (BK 1/21/21)

 

image.png.ca55752e43ba7e61f835f9c94796a779.png

Oversized card stock is cut and glued to the flattened head. (BK 1/23/21)

 

image.png.75b60faa01b3c4916509342294e30f34.png

A small ball of clay is packed on top of the hardened head. With an "L" shaped, 1/8" wide tool, the band is pressed in, the top is rolled with my toothpick, and detail is stamped in.  (BK 1/23/21)

 

image.png.ade13792e769729a212d5c2eb493c642.png

After hardening head with the heat gun, the cap bill is sanded to shape with a moto tool and fine disc. Pin vise is a  real aid in sculpting these small heads. (BK 1/23/21)

 

image.png.d51d68b5d848b189b7b638dfa172923d.png

These are the tools I used to make this part of the crew. (BK 1/26/22)

 

image.png.e3a1e79a23c4dffa4cb8b8259f586fa8.png    image.png.0f5b055ba405b84ab9a1f50c8df84443.png

All heads are made with flat tops, to which I may build hats after the lower portion has been heated and hardened. This allows the facial features to stay intact when the hats are pushed around on the heads. (BK 1/17/21)

 

image.png.eea0a269eaaa2673a08310ff9b1b8d1d.png

 The five heads in the back row are actually a bit too large to use. While they are nice heads, I will have to find another project for them where the scale is not so important. I had made them before I developed a constant armature for the head (the small copper ring at lower right). I covered this with clay and hardened it as a face base (white object in center).  Penny for scale.

(BK 1/16/21)

 

image.png.1e7d73708150327c10dd612b09a64f40.png

Keeping to a true 1/24 scale became much easier when Vince Murphy provided plastic train figures in that scale to me. I removed the heads from several and drilled an appropriate counter-sunk hole in the neck. While the clothing on the figures is not appropriate, it does give a great feeling for the scale. Thus, to maintain the proper scale, I built the heads on small rings of 22 gauge copper wire covered with Sculpey clay. Using mostly a round double-pointed wooden toothpick and a pin vise by which to hold the wire aperture, I pushed and poked the soft clay into face shapes and inserted them onto the neck of the figures (BK 1/10/21)

 

OK, that's all for January, 2021. The next entry will be from March of 2021, making oars for the cutter and launch, and cannon wheel hubs. Hopefully in the next few days.

 

Tim

 

 

 

image.png

Link to comment
Share on other sites

Beautiful work by everyone on the project. So much more detail on this larger scale than I was able to cram into my build. Keep the updates coming. 😁

 

-Brian

Current Builds:                                                                                                  Completed Builds:

Mississippi River Towboat Caroline N.                                                                HMB Endeavor: Artesania Latina

                                                                                                                            USS Constitution - Cross Section: Mamoli

Non-Ship Builds:                                                                                              HMS Victory - Cross Section: Corel

New Shipyard                                                                                                     King of the Mississippi - Steamboat: Artesania Latina

                                                                                                                            Battle Station Section: Panart (Gallery)

In Dry-dock                                                                                                       Chaperon - 1884 Steamer: Model Shipways  

USS Constellation: Aretesania Latina                                                                  USS Cairo - 1862 Ironclad: Scratch Build 

Flying Fish: Model Shipways                                                                               

                                                                                                                            

                                                                                                                            

Link to comment
Share on other sites

  • 3 weeks later...

Hi all,

 

A few from the March 2021 Newsletter, looking at construction of the cutter and launch, as well as making cannon wheel hubs. Here we go.

 

 

(N.B. For the most part, Bill has been working on this on his own, with assistance from Bob Keeler, Dr. Mike Orgel and Vince Murphy. Unless otherwise noted, all pictures and captions are by Bill Kammermeyer)

 

STEPS IN MAKING OARS FOR THE CUTTER AND THE LAUNCH FOR THE USS ST. LOUIS

 

                                                 image.png.08dabacb217b5ef668db34cf21b3ddfa.png

Hard Maple blocks were center-drilled in a jig to accept 1/8" hardwood dowels. The blades were then tapered and formed using a bench top belt sander with fine grit abrasive cloth and an oscillating tube sander for the side rounds.  Penny for scale. (BK 02/24/21)

 

image.png.60a30521b6113f32b66dd66fa90e31a8.png

2 different homemade core drills were used to make the handle at the end of the oars. Penny for scale. (BK 02/24/21)

 

image.png.a1da411f8601e9d863f2978cf2b328ef.png

After sanding to shape on the bench sander as well as the oscillating sander, the 40 oars were hand-sanded and then varnished to be sanded again to remove any fuzz, so as to be very smooth and ready for painting where needed.

(BK 03/6/21)

 

image.png.f7a28ec31c7ab4437e6d56c9c9b8a5df.png

Enough oars for 4 boats, all double varnished and sanded, ready for paint. A far cry from the blocks and sticks with which I started.  (BK0 3/7/22)

 

Problem with my mouse. Will resume when I figure the )^&^%^&&* thing out.

 

Tim

 

 

 

Link to comment
Share on other sites

SUCCESS! Just needed a battery. OK, on to:

 

 

CANNON WHEEL HUBS

 

The 2 parts to a cannon carriage wheel (truck) were set cross grain and bolted together to dramatically increase their strength under the pounding they endured with 1 to 3 tons of iron above them being bounced around the deck by large amounts of gun powder. Over 100 of the hubs with bolts were needed to outfit the wheels, plus extras.

 

image.png.8eb455e7f4f8e872463c665cef214502.png

Over 100 sheets of .005 copper sheeting were center-punched by Mike Orgel and slid on a 1/4" bolt (we later found that a smooth shank threaded at the end would work better).  He compressed them into a solid rod, adding spacers as needed. He ground a special cutter and cut them to a uniform size on his lathe with the lathe live center in the drilled end bolt.  (MO 02/25/21)

 

image.png.ce6e70ed379e3a278e5c08b622b0fa6d.png

Mike and Bill made the center die of brass ring and indexed pins soldered in countersunk holes.  When it is placed on the rod, a blank (left) is added, followed by the black neoprene. The brass tube (left) is added and the unit is pressed in a vise, end to end. The result is the embossed hub (center) and blackened to the right.  (MO / BK 03/1/21)

 

image.png.192c28ce85a9f7ca12a83805198308d7.png

Materials and tools needed to make hubs. (BK/MO 03/6/21)

 

image.png.7d01154a70fc4f31bd22839cf46d0ff0.png

 

         Detail of finished hubs and homemade tools. (BK/MO 03/6/21)

 

OK, wanted to make sure to finish up the March 2021 issue. Next is fully a year later; although we weren't meeting due to COVID, plenty of work went on. Stay tuned! 

 

Tim       

                                                                                            

 

 

 

Link to comment
Share on other sites

SUCCESS! Just needed a battery. OK, on to:

 

 

CANNON WHEEL HUBS

 

The 2 parts to a cannon carriage wheel (truck) were set cross grain and bolted together to dramatically increase their strength under the pounding they endured with 1 to 3 tons of iron above them being bounced around the deck by large amounts of gun powder. Over 100 of the hubs with bolts were needed to outfit the wheels, plus extras.

 

image.png.8eb455e7f4f8e872463c665cef214502.png

Over 100 sheets of .005 copper sheeting were center-punched by Mike Orgel and slid on a 1/4" bolt (we later found that a smooth shank threaded at the end would work better).  He compressed them into a solid rod, adding spacers as needed. He ground a special cutter and cut them to a uniform size on his lathe with the lathe live center in the drilled end bolt.  (MO 02/25/21)

 

image.png.ce6e70ed379e3a278e5c08b622b0fa6d.png

Mike and Bill made the center die of brass ring and indexed pins soldered in countersunk holes.  When it is placed on the rod, a blank (left) is added, followed by the black neoprene. The brass tube (left) is added and the unit is pressed in a vise, end to end. The result is the embossed hub (center) and blackened to the right.  (MO / BK 03/1/21)

 

image.png.192c28ce85a9f7ca12a83805198308d7.png

Materials and tools needed to make hubs. (BK/MO 03/6/21)

 

image.png.7d01154a70fc4f31bd22839cf46d0ff0.png

 

         Detail of finished hubs and homemade tools. (BK/MO 03/6/21)

 

OK, wanted to make sure to finish up the March 2021 issue. Next is fully a year later; although we weren't meeting due to COVID, plenty of work went on. Stay tuned! 

 

Tim       

                                                                                            

 

 

 

Link to comment
Share on other sites

OK, now, here we go with April of 2022, which concentrates on the building of a mortar barge and the mortar itself:

 

 

This month’s focus for the USS St. Louis will be on a 1/24 scale mortar barge, which is being built by Bob Keeler. The mortar itself was built by Bill Kammermeyer. These mortar barges typically accompanied larger steamships or gunboats, and has been discussed for possible inclusion in the USS St. Louis Display.

 

MORTAR BARGE (photos and captions by Bob Keeler)

The mortar barge was 45 ft long x 30 ft wide. Building at 1/24 scale gives a model that is 22.5 inches long by 15 inches wide.

 

image.png.16e7e542d37f6ee28a9b01a701832cf1.png

Mortar barges were not built for long life as you can see by condition of this barge.

 

image.png.1a775a14f337128f6a841e4dc2adeeab.png

Civil War sketches of mortar barges were not consistent with photos and each other’s sketch configurations.

 

image.png.33691104050d04d25e60c0e07c2c5b57.png

Tool used to build interior structural beam layers

 

image.png.363e434ee4ee6784738ffa8f2709071a.png

Building the lower skin first layer of beams and start of interior cribbing which would support the mortar's weight and recoil of mortar.

 

image.png.dbdc9143f6c7725b7ffb4ab0b33d62da.png

Looking down at the lower skin (,5 in wide by .25 thick planks), structural beams and interior cribbing made of alternate layers of .75 in x 1.00 in beams. Notice strips used to keep things aligned.

 

image.png.2b77b79e34479a177a8c85583f409e31.png

View showing interior beams made up of .75 in by .75 in

beams and .5 in x .5 in beams

 

image.png.0e3df7b1b6fb2c338377ca585bbb8a5d.png

Adding the support beams for the Exterior cribbing after skinning sides and .  Cribbing on mortar barges was1 foot on sides and 2 feet on ends.

 

image.png.d7d39c2fa3017fd5f48374c4f7d0ae32.png

Model with the side skinned, the upper deck in place and the exterior cribbing.  The upper deck is removable for access to the interior.

 

image.png.031c1efb7fcc9389c088aec483efcb42.png

 

One side is exposed to show interior. This is current status of model.  Next step is to add supports for .04 in armor shielding. (It was 1 inch thick iron plate.)

 

MORTAR (photos and captions by Bil Kammermeyer)

 

As part of our build of the USS St. Louis, one of our members Bob Keeler decided to build a mortar barge in the same 1:24 scale.  This non-powered raft of timbers had a 13-inch costal mortar mounted amid ship and was pushed where needed by a powered member of the fleet.   I had seen these mortars at White Garden near the Battery in Charleston SC and was impressed with their squat bulk and the 200+ shell they fired over 2 miles in a big arc.  I decided to build 3 scratch built models, one for Bob's barge, one for me and one for my son-in-law, Lance Carlton who lives outside Charleston and grew up on Folly Beach, the site of a lot of the action during the civil war.

 

image.png.5d43392be4a17cd2dd03ee966d76be17.png

Just thought those who had no idea what I am building might like to see a period
photo c.1863. BK

 

image.png.d67ca60e5e99234d1cd38f3012bd6691.png

I drilled hard maple blocks for the bores and trunnions. BK 4/16/21

 

image.png.3b43cdc9f96357537c2a324c7e2a0ccc.png

Turned the barrels on 3 different types of lathe. BK4/23/21

 

image.png.8464f32ef5ae213fe04bc5ae522afe7d.png

I cut the carriage sides out of sheet brass as per plans that Bob obtained. BK 6/8/22

 

image.png.eda3125f52a5601bd5dc60817716d093.png

Parts were cut and soldered together. BK 6/25/21

 

image.png.5521feb9e35246c0dfb1c9ef9024f313.png

Flash soldering required the use of a propane torch, heat sinks and clamps to join brass of different thickness without unsoldering previous joints. BK 13/27/21

 

image.png.88ab1ebfc385f8f993e2524443036a68.png

Using the carriage as a guide i cut a groove for the elevating lugs on my bandsaw.  BK 12/31/21

 

image.png.bac95d8eec76eef062bb296c7240fc44.png

Using a horizontal jig i cut the lugs in the strip of hard Maple I had glued in the slot. BK 1/3/22

 

image.png.24d7b02491d208b8e73a4b4941b3cdb3.png

Over time I made 300+ "nuts" for the "bolts" that joined the 2 sides of the carriage half that clamped the "t" strip around the edges of the carriage half. BK 1/5/22

 

image.png.a29c779fe0fbf69eba681c8759d3b766.png

The mounting hardware for the loading cranes as well as the cranes (gibbets) themselves were made.  Penny for scale.  BK 1/9/22

 

image.png.71506f213f550c06724d64a53eda8d69.png

Parts of the cranes as sub assemblies (7 parts for each crane) soldered together. BK 1/9/22.

 

image.png.9bfbf5f035f43ed47a81d29a5523d654.png

The front loading steps we're soldered to brass angle using a spacing jig. The full crane is in place and functional.  BK 1/11/22

 

image.png.8946582f163257d59996d257d70fbf5a.png

The triplets are moving right along. It is a constant situation of fit and file. BK 1/12/22

 

image.png.5c69821f1fd5ac2e9c93345bf8826a63.png

The small wheels on the side and the internal cam operated by the tube on the axle allowed the wheels to lift and hold the 8 tons of mortar and carriage a fraction of an inch and then with iron rods in the wheel holes, rotate the mortar left or right. Penny for scale.  BK 1/23/22

 

image.png.3a8a4e28ad47ccecbcb3e2a295b2efd0.png

Making the cam sockets required soldering small brass rings to the ends of small brass tubes. Penny for scale. BK 2/23/22

 

image.png.67c952fea0dbfdf64321c67c389b80fc.png

Using an indexing jig I drilled 6 equidistant holes in a half inch brass tube.   I inserted a wheel that I had turned to the exact internal dimensions of the tube  to form the cam section of the wheel in the cut ring of drilled brass.  BK 1/22/22

 

image.png.15950f9908d2cf6316906899570f75ed.png

All the wheel parts were permanently attached to the axle and bars were made to switch the cam mechanism as well as turn the wheels.  All parts were primed before painting.  BK 1/25/22

 

image.png.b89f741e9342996f7c62475f5aa1f145.png

All of the parts had to be finished and attached on the right side and free  and open on the left side so I could pull the carriage sides apart and insert the cannon barrel. I did this due to the strange size and configuration of the cap squares that cover the trunnions on the cannon.  I will never do this again. In retrospect the significant amount of time and effort needed to make the 2 sets of steel jigs for the cradles and cap squares would have been well worth it. BK 2/27/22

 

image.png.0549bae9cc35151b99f7a121c7f29f6a.png

Since only one of the mortars will be in a mortar barge the other 2 will be on a hard surface platform. 

 

 As per period photos I built 2, scale 12' x 12' heavy timber platform with heavy skids. I then tried different methods to show the use of the crane, 200 lb. shells and tools needed to load and service the mortar. BK 2/12/22

MORE TO FOLLOW 

 

 

 

Extra Added Bonus! Bill’s very own CIVIL WAR CANNONBLL!!! (pictures and text by Bill)

 

As I was leaving a garage sale with my 50 cent purchase I noticed a small dark object at the corner of the driveway and the street.  It was convex and about 4 inches in diameter.  I asked the homeowner if it was a cannon ball and he said "That's what the guy who gave it to me said".  I asked if he wanted to sell it for $5 and he said yes. I borrowed a shovel and kept hitting iron as I worked outward. the ball was much bigger than I thought and I needed help getting it out of the now 10 inch hole filled with wet mud and slick leaves.  I just could not grip it with my finger tips. Turns out that it was not only wet and slick but weighed 65 pounds.  It was a shot for an 8 inch Civil War cannon.  Oddly enough the 3 largest cannons on the USS St. Louis that I am building at 1:24 scale happen to this same gun. This 65 pound hunk of iron could be fired over 2 miles with devastating effects to fortifications and troops, and was!  

 

image.png.69b301100571423ee2b7e3cf8dac4de6.png

The ball was heavily rusted and large flakes of scale from about the size of pinheads to that of quarters distorted its shape. (Penny for scale, no pun intended). After about 3 hours of chipping with a brick hammer at the scale I was able to remove most of it.  A steel cup brush on an angle grinder removed the rest of the flakes.

 

image.png.0b1c641a150540866c4b0249feaa9d62.png

After rinsing it with water, this is its current condition. I have no idea how long it was in the ground or its origin other than the fact that they were stored aboard the City Class gunboats built in Carondelet, south St. Louis and Mound City, and were fired at fortifications in mass south of St Louis. BK 11 / 1 / 21

 

image.png.39534fcfe3337f308919a80d01aacf6f.png

To be able to more easily move and store my treasure, I built a carrier of white oak boards, which were cut, glued and screwed together at cross grain with a tapering hole in the center. The ball rests securely in the pocket and stays where I put it.

 

image.png.7d43d824d6c42cf013277608323aac15.png

Holes were drilled through both boards at the corners, with the bottom hole being enlarged to hold the knot for the ends of the  nylon rope handles.

 

image.png.83a03f8f9ef16820d9ccbd85ad5c3957.png

A piece of copper tubing was flared at the ends and used as a handle with both ropes passing through it to comfort the hand while lifting the 65 pounds.  It is great fun watching the reaction of friends and family as they give this relatively small sphere a lift.

 

image.png.700991a7cec4ea37ceca2d1926603824.png

One-inch, rotating casters were screwed to the bottom for easy movement. It is a lot easier to roll it than lift it.  It is a neat conversation piece and I am pretty sure I am the only guy on the block that has one,  BK 12/12/22

 

Hope you have enjoyed this little tangent. Back to the USS St. Louis proper in the next installment, which will look at all manner of things, such as lanterns, multiple tools and ceramic jugs. 

 

Tim

 

 

 

Link to comment
Share on other sites

  • 3 weeks later...

Hi all,

 

Here's the next installment, which is from February of 2022:

 

MAKING SMALL BRASS LANTERNS (built by Fred Hecker and Bill Kammermeyer; photos and captions by Bill unless otherwise noted)

 

image.png.07b68bad5644d38568ae3c601fd58fd5.png

An alternative method of making the lanterns was developed by Fred using square, clear, acrylic rod as the glass. The edges were the same plastic angle with a brass tube cut in half for the vent.  The bottom of the rod was drilled with a tiny bit, frosting the side of the hole-- PRESTO!, a candle! Some were “lit” by using an even smaller bit for the wick and a bit of paint on a thin wire for the flame.  Great job, Fred !   FH 5/28/2021

 

image.png.42fcf9898f0d5671af898ccbcfcdf52a.png

Drilling holes in the brass lantern vent for wire bail handles was Bill's job.  The use of a special bit allowed the holes to be drilled without the use of a center punched mark.  This is a good view of the candles with their lit flames.  these will be used in the lower working part of the engine room and storage holds. Penny for scale.  BK 8/10/2021

 

image.png.219ebfd5ce6ae9e355a066fc76085947.png

Use of a machinist’s centering bit allowed for pilot holes to be drilled quickly without damaging the glue joints and then they could be slightly enlarged later to fit the 20-gauge brass wire used for the bails.  the relatively heavy shank of this type of bit relative to its tip keeps the tip from wandering on the surface as would a standard bit.  Penny for scale..  BK 8/10/2021 

 

image.png.5d2ea05abca891192eb3fe0ca9c0a64a.png

The 20-gauge wire handles add a touch of realism to the look and will be added to a few of the crew below deck as with the 1/24 figure that I use as a gauge for my figure sculpting.  Penny for scale. Fred made a total of 21 lanterns that will be used around the "dark places" of the ship as well as in the deck storage sheds ready for night maneuvers. BK  8/11/2021 

 

OPERATING PILOT HOUSE WINDOW ARMORED COVERS (MADE BY FRED HECKER)

 

image.png.691159935c3aa633098d0e8a3cb380a6.png

image.png.a858ac8932b52d1dba6282f7152b53fe.png

Operating pilot house window armored covers. 2 will be in closed position, 4 will be open and 2 will be left off of open viewing sections. Another outstanding job done by Fred.  Hinge plates have been punched for Bill to drill to appropriate size for attachment pins. FH  10/13/21

 

MAP CASE FOR PILOT HOUE (made by Fred Hecker)

 

image.png.b7ca95bc406d8285903e6df48b54d207.png

image.png.24ddbdf88edaa96859af390a4939900e.png

When Fred Hecker sent these photos of a map chest to me, I thought it was for my approval. I thought they were pictures of an antique chest. I wondered if they would fit in the pilot house. FH 10/4/21

 

image.png.d933a094ff9da76ac955a9076b736d37.png

image.png.142df8a12e6199373ac0237b4f5970c9.png

Fred said this was what he built.  It looks so good I thought it was a photo of an antique. It looks great in place and there is still room for officer and crew as well as floor hatch use.  FH/BK 10/7/21

 

That's all for today. Next time,  also from February 2022, many many tools.

 

Tim

 

 

Link to comment
Share on other sites

Hi again all, 

 

More from February 2022, this time focusing on making and displaying tools as well as ceramic jugs. The former involved several people, including Bill Kammermeyer, Fred Heckr, Bob Keeler, Vince Murphy and myself.

 

Making Shovels

image.png.78d96e3ad36f878cd6fcba2ebd85bbc9.png

 I formed blades and soldered tubes to them to make collars. Penny for scale.
BK 5/18/21

 

image.png.bfa29f33d1807e40e6d75c39e0093c54.png

Using the same size tube with teeth filed into the end (as seen on the penny) a peg is formed that fits perfectly into the socket. BK 5/18/21

 

image.png.b2cefdc684d922c89f709bc3af022414.png

Old brass weatherstripping was repurposed into shovel blades with tube shafts soldered to them. BK 5/18/21

 

Tools, Lanterns, Brooms, etc.

 

image.png.2b68cf2b3f59d5f28ee67ea445ece1cd.png

Axes built and painted by Bob Keeler 8/9/21

 

image.png.c77eaa836aa77c5e55b0e2011f5c36a8.png

Push brooms by Tim (VM 9/15/21)

 

image.png.b3d51297ed6cdda77cef7d9dbb2ab276.png

Oil cans by Vince (VM 10/6/21)

 

image.png.71e6b76b7709ad9d5ffabc4f61c7d5c1.png

Tools for the deck storage sheds and the engine room. Lanterns by Fred. Saws, shovels, sledgehammers, clinker rakes and hook and most painting by Bill. Brooms, mattocks, hammers, wrenches and tool boxes by Vince and Tim. Axes by Bob. Penny for scale.  10/14/21.  FH / BK / VM & TJ / Bob K.

 

image.png.1f28dfd89dabb5d99d1d545d998607ac.png

View into forward work shed with tools in place.  BK 10/21/21

 

image.png.bc82d6eadcdf8e02a7954b880f1712f4.png

Forward work shed corner detail. Front boxes had bottoms reduced to cover "L" of cardboard that was glued to the bottom of the walls to allow the crates to be removed intact when the shed was removed from the hurricane deck.  BK 10/15/21

 

image.png.c0387eacc01c21ce1aeb1f42df0054bd.png

Rear shed tool and equipment placement. BK 10/20/21

 

image.png.bfe7e9f83e1032ef81729e445f752096.png

Tools and lanterns by everyone, selection and placement by Bill.  BK 10/20/21

 

image.png.b8a6cb31ca32fdcc8a85825bd0c69419.png

Detail in rear shed. Rope, sledges and shovels by Bill. Tool box and tools by Vince and Tim, lantern by Fred. 10/21/21 BK /VM-TJ / FH

 

image.png.07bdfd441236f2ab5ab1381e0b808059.png

Shelving attached to the curve of the wheel house made sense for added storage in the deck sheds. Canvas sun shade would have been stored here along with miscellaneous everyday ship needs. BK 10/10/21

 

image.png.cf2223d11c6ff433b576a6026e8bde68.png

Unlit and empty lanterns along with beans and general supplies. FH/BK 10/10/21

 

image.png.5b6575645ebb3a1bb067315572efc93b.png

All sacks, boxes, canvas tarps and barrels are attached to shelves and surface of the wheel house so they will stay in place when the wheel house and sheds are made into one unit that can be removed. BK 10/21/21

 

CERAMIC JUGS FOR PLACEMENT AROUND THE USS ST LOUIS

 

image.png.185535d01c6fe11d317441c5c2f050da.png

First I turned them by hand. Penny for scale. BK 1/31/22

 

image.png.ca0e7044f8adc06ec3298d3f1ce4ca6b.png

Then I attached handles, painted as with a ceramic glaze, and corked them.  BK 2/3/22

 

image.png.094886153ea4066a29c210a4bc1c7780.png

I made 1/2 gal.,1 gal. and 2 gal. size. Lookin' pretty good!  Penny for scale.  BK 2/3/22

 

OFFICERS’ STARBOARD QUARTERS

 

image.png.d402fb3c572caa562d062763a9d576cc.png

Covered mockup by Vince with thin planks and added doors and corrected after gap. VM/BK 10/28/21

 

image.png.5ac68fbd77f854f21ce4a1402cd478a3.png

Framed the doors and painted as the casement. Using the fit/sand/fit/sand method I was able to get a tight fit. BK 10/27/21

 

image.png.2b321db39f0d54ad5127b1310864e994.png

Using a punch, I was able to make door hardware. BK 10/29/21

 

image.png.a2586ef4a1fedbad4d1c38eb6cfaf038.png

Detail of door handles made of bent and worked copper wire with plates made wIth punch. BK 10/20/21

 

image.png.4dbd3b2bc08e81576a2c5afebf3f1c22.png

View aft with officers’ cabins installed, painted, doors framed and handles attached.  BK 10/19/21

 

image.png.bcd6a7a4fb2c8947564c0f7887a1d657.png

I spent more time than I should for a snug fit for this curved wall. I forgot that boxes would be blocking my handiwork.

BK 10/29/21

 

That's all for now. Next entry will be from October, 2022. Please to enjoy.

 

Tim

 

 

Link to comment
Share on other sites

Thanks for the update Tim. You guys' level of detail is just amazing!

 

-Brian

Current Builds:                                                                                                  Completed Builds:

Mississippi River Towboat Caroline N.                                                                HMB Endeavor: Artesania Latina

                                                                                                                            USS Constitution - Cross Section: Mamoli

Non-Ship Builds:                                                                                              HMS Victory - Cross Section: Corel

New Shipyard                                                                                                     King of the Mississippi - Steamboat: Artesania Latina

                                                                                                                            Battle Station Section: Panart (Gallery)

In Dry-dock                                                                                                       Chaperon - 1884 Steamer: Model Shipways  

USS Constellation: Aretesania Latina                                                                  USS Cairo - 1862 Ironclad: Scratch Build 

Flying Fish: Model Shipways                                                                               

                                                                                                                            

                                                                                                                            

Link to comment
Share on other sites

OK, this next session cover much of 2022, and covers not only further progress on the USS St. Louis , but also progress on the accompanying Mortar Barge built by Bob Keeler. 

 

USS ST LOUIS (Photos and text by Bill Kammermeyer unless otherwise noted)

 

image.png.646202ade43dc39ff9f25574fbc4cc8e.png

 In the pilot house, the lanyards for holding the armor plate window lids open are put in place around their pins. LED lighting has been put in place as a trial.  Fred and I are looking into fiber optics for the candle flame.  BK 3/21/22

 

CREW HEADS:

 

image.png.1317c096a53850079eedbd7134894842.png

The difficult mechanism for building the plumbing apparatus for the crew heads was as overcome by turning Styrofoam molds to be covered with liquid epoxy in the shape of a bowl and pipe using a pattern and duplicator.  BK 4/24/22

 

image.png.67e6cf047a1f5808f6f62d1a5570e3b6.png

The Styrofoam mold was trimmed and then removed from the dry epoxy bowl shapes using a moto tool with a round bit. After most of it was removed, a drop of acetone melted the rest. The rims were sanded flat.  BK 4/26/22

 

image.png.bade062bbd7786505b9c4d71a6c73dc8.png

The bowls were painted copper on the inside and black outside. The flat edges of the bowl were glued to the underside of the seats of ease with the pipes making a right-angle turn into the waterway. A drain from the starboard upper head may be seen with a stain in the background. BK 4/28/22

 

 

MASKING AND PAINTING OF THE CASEMENTS:

 

image.png.c24cbdb72d31274ca934a0da50971edc.png

Blocks of Styrofoam were cut, with Vince and Tim’s help, for a tight fit in the gun ports and open viewing cuts.  BK 6/9/22

 

image.png.d1ea57cc33a6ae94982c95e3a19db800.png

With Styrofoam plugs in place and masking complete the casements and the upper portion of the hull are ready to be painted. BK 7/27/22.

 

image.png.8b37526ea8468480f9d8a7009a594f1a.png

Bow and stern casements were painted off the ship and the side casements are ready to be painted. Aluminum foil works very well with irregular surfaces. BK 7/27/22

 

image.png.8e20068690a721ea433b0ee615d330c5.png

Painting went off without a hitch. The Styrofoam plugs worked very well.  The use of a flat red paint to designate removed sections of casement were applied. BK 8/4/22.

 

image.png.0b036fe6200b6ee4397049176b6aa238.png

All the edges of the gunports as well as well as the removed area had to be painted flat black and flat red respectively. BK 8/4/22.

 

SPITOONS, CHICKEN COOP AND LADDERS:

 

image.png.458f852212b3f17cc09bc618f8f50ba6.png

 

image.png.a82f3cf2dcd08ef5f9cad6f07c10cf61.png

image.png.104bfc549894a86e784b82c760e76934.png

image.png.6adc02608e529472a43cc907d49aefba.png

Using beads as the base and paper as the rims, Vince and Tim made a number of spittoons for placement around the ship. Pegs were attached to the bottoms of the spittoons so they could be placed solidly in holes drilled in the decking. They were painted brass. (see below regarding “straw” for the flooring of the coop)

 

image.png.b295bcd42959b03886a1e6128807ae7d.png

Chicken coop (unpainted), and ladders for bow and stern casements, made by Vince

 

image.png.c4fbfa41215bef134bca27217b314fa5.png

image.png.4d3298444a3e990ad96db188bad02764.png

1/25 scale chickens (hard to find, gotten from a Canadian company) white (see on right), painted brown, in preparation for their becoming residents of the coop. They came with pegs on the feet, for anchoring on the coop floor, and these pegs were placed in the end of a piece of corrugated cardboard while the paint was drying. VM/TJ 9/9/22

 

image.png.6e25ce2b4956beaef2fb45c8d831ee60.png

image.png.a404891a30e766b0344eb30bd08a0732.png

Coop painted black. Floor had standing chickens (including one rooster). Upper shelves had “nests” made from buttons. The legs were cut off these and the hens placed in the “nests” as if they are laying eggs. The “straw” for the floor and shelves was made from scale “rough grass’ and “dirt.”

 

ANCHORS:

 

image.png.9d6705fff25554923db4e64c7524e288.png

Research plans for an Admiralty anchor were printed to the proper scale, cut to rough shape and rubber cemented to brass sheet.   1/8" for the arms and shanks.  .0218" for the palms.  BK 10/28/22

 

image.png.2cae6c61d37c9cd2066819d318497676.png

The brass parts were cut to pattern size, filed, and sanded to final shape with a notch in the top of the arm and a shoulder filed on the end of the shank for a stronger soldered joint.  These parts were pinned to scrap wood with a hole under the joint so the wood would not act as a heat sink.  BK 10/30/2

 

image.png.10831c43be52457a59fc6dc5f7d367aa.png

The joints were fluxed and then overwhelmed with torch heat. Silver bearing solder was touched to the joint and I was done. A solid joint that just needed to be cleaned and filed. BK 10/30/22

 

image.png.5a8514de69772e56138bfe990b66d9f2.png

The finished joints after filing and sanding were smooth and true.  12-gauge copper wire was cut and bent as per plans with balls added to the ends. Balls were from an old brass bead chain with the links cut and one end drilled for the cross arm. BK 10/30/22

 

image.png.bfdd4d791bfcf162ad2bf6d5b1bcc67f.png

The palms and notches in the arm tips were fluxed and tinned, then spring clamped together and torch soldered while in a vise. The clamp was removed and palms were finish set using pliers and torch. Balls were soldered in place. Penny for scale.  BK 10/31/22

 

image.png.a819bb9a253bda3e7316c6b504abf45b.png

Shackles were made from 14-gauge copper wire. Stop rings and retaining pins were made of 22-gauge brass wire. Pins were drilled and 28-gauge brass wire was twisted and soldered to simulate the keeper chain. Anchors shown in working and stowed positions as they will be displayed on the bow deck. Penny for scale.  11/5/22

 

image.png.b361c2720698f8b261007332925eb8ee.png

Anchors displayed on bow deck, top view

 

image.png.aa001508085da8d2299547fb3d617d43.png

View from the bow.

 

image.png.af2f097c34ff6dc17a74cb33e682e7fc.png

The anchors store more easily with the cross bar stowed.

 

 

MASONIC SYMBOL:

 

The existence of a Masonic symbol located hanging from the support rods between the smokestacks is seen in some period pictures, although it has been difficult to verify. It is known that the USS St. Louis was renamed the USS Baron DeKalb (named after Johann DeKalb, a French military officer who served as a Major General in the Continental Army) in September of 1862 when it was transferred from Union Army service to Union Navy service. Her last Captain, Lt. Commander John Grimes Walker, was known to be a Mason. It is also known that during combat, Masonic members would not fire upon other Masons, even if they were the enemy. (thanks to Casey Jovick and Keith Dockins for their research assistance). Thus, despite the speculative nature of this symbol, it was decided to construct one, which could be removable but still part of the display if need be.

 

image.png.34774f1cfa07d61ee087e84ee846a72e.png

Sheet brass .021" from an old award plaque was cut to make the square, compass, and hinge buttons. Buttons were made with a Whitney #5 jr. punch. Penny for scale.  BK 10/26/22

 

image.png.9795adf43fc661f52611f78b92e356d7.png

Assembled parts were tinned, clamped and then flash soldered with a propane torch. Excess solder was sanded and filed away.  The result was pretty close to the plans I used. Penny for scale.  BK 10/26/22

 

image.png.0353bbafc099f4d611f60b01e7ace2e1.png

20 gauge brass wire hooks was soldered to the back for optional mounting between the stacks. It will be firm but not glued, giving us the option of removing it if proof is presented that in fact it was not historically accurate. BK 10/26/22

 

image.png.59897b4e4e7cf450c80fc7b663a447cf.png

Finished Masonic symbol as it will appear on the stack support rods viewed from the bow.  BK 10/26/22

 

image.thumb.png.2a3cf05db58ca23906271c3956ebf961.png

 

image.png.fc396c5023a9b5113e7471328d9cbe18.png

Buckets to be used on Bob Keeler's 1:24 scale 13" mortar barge (see below).  Long rope attached to retrieve bucket when thrown over the side to refill the sponge tub. Stained water in buckets is liquid steel. It dries level and has a water sheen. Penny for scale. BK 4/21/22

 

 

 

MORTAR BARGE, Continued (photos and text by Bob Keeler, 06/03/22)

 

image.png.a77eb3e73f07a6338fb1024f5dc1be2c.png

Shows .04 in x 1.25 in x 3.25 in styrene shielding representing 1 in x 30 in x 7 ft iron shielding on wooden supports.

 

image.png.9da5132b0ff3d4e896de5ce610d0eaa7.png

Side view

 

image.png.9aaf3d5ed25742f8937c57362e0709fd.png

View showing Bill’s mortar and supporting hardware with our scale man for perspective.  No, I didn’t paint the shields black; just the lightingeffect.  It does show the rifle ports to advantage.

 

image.png.1417004dbdcbeb9430ae63ae8a1e4f82.png

Another view showing the interior details

 

image.png.eb130d8f15121646a7ffb3d68a8063d8.png

Tool for cutting styrene into 1.25 in wide strips 

 

image.png.cbe3d4fc809b46eb8e8aca95feb0b92b.png

Tool for cutting strips to 3.25 in length.  Right hole is for drilling 1/8 in rifle holes; left hole is for locating hawser holes in 4 pieces.

 

After doing all this, it didn’t look right.  When I went back to the plans, I found out that I had made wrong calculations.  The supports should have been 1 in. high instead of 1.75 in. high, and the shields should have been 1 in. wide (24 in wide) instead of 1.25 in. wide (30 in wide).   So I will remove these supports and shield and build new correct ones.

 

WHEW! Lotta stuff there! Next installment will be from January/February and will look at the deck howitzer and the pump heads.

 

Tim

314-761-5435

 

  1.                                                                             

 

 

 

 

 

image.png

Link to comment
Share on other sites

  • 2 weeks later...

Hi all,

 

This next installment is from January/February of 2023.

 

12 Pound Deck Howitzer BK 11/23/22

 

 

image.png.317e43ec5242f1f851f359ae81f78fd5.png

image.png.c7d4026ce71905efb4fb7a15ddc649c4.png

 

Deck Pump Heads

 

Three octagonal "oak tree pump" shafts were made 4 years ago by Vince and Tim and installed in the bow and stern decks as per the Cairo plans. No pump heads were shown on the plans. Research shows that hand pumps were removable and stored on deck casements. I found a number of period pumps and drew plans for plausible type. These were used to empty the bilges, not as emergency water removal. In an emergency, the ship was run aground and the emergency addressed. 

 

image.png.e5bb4529e78450b67aac0dac2f3b1f30.png

image.png.46a1a07efdb663a7d4f9b7dcc7169778.png

Brass tube, rod, sheet stock and 14 guage copper wire were cut and soldered. The hardest part was attachment points so the pump handles would work the internal pump rod. BK 1/4/23

 

image.png.d63cdad3eb57de7b9725ea4e2f284fc7.png

Plan that I drew as guide for pump construction behind the finished pumps. The 2 in back will be mounted on the casements. The tail pipes will fit into a water-tight fitting to create a vacuum after the pump is primed.  BK 1/11/23

 

image.png.6b9a94c16aa42dd3aabf28d380577cd1.png

The mechanism that drives the pump rod works well,  and all pivot points pins are soldered in place in a fashion that allows movement. When they are painted this feature may disappear. BK 1/11/23

 

image.png.a8d1341f6eebaaee64339a076708652b.png

 

The pump heads rotate 360° with a nib on top of the spout to hold an attachment for a leather or heavy waterproof cloth hose to take the foul water over the side. No internal discharge was shown on the plans. BK 1/11/23

 

image.png.7aa23ab77b6e216c0d8d2169f1947693.png

Our scale figure shows relative size of the pumps. When in action, the pumps needed to be stowed to avoid damage by cannon discharge. BK 1/11/23.

 

image.png.2a22e5ed61090c19cfed3bbcd500d9c9.png

 

image.png.df6237c4756dab93189924b59d0b594f.png

 

image.png.3d2f322f21aa442e2b887e2a02cdf8fb.png

Painted pump mounted on a hinged bracket with a wooden pin to secure the latch. End of the pump pipe rests in a socket that supports the pump head weight. Elm tree pump column is plugged when not in use to keep debris out with a snug stopper. BK 1/20/23

 

image.png.c2e3ae626ed6de14a55d24762148702c.png

Painted, working pump head in the elm tree well that goes into the port bilge. The plug is stored in the pump tail support on the casement. BK  1/20/23

 

image.png.14aab7c824e9650d1353ecc76d34557e.png

 

image.png.83ef80975303f0db9b1491b5162cb329.png

 

image.png.422a6011bc31f4c3eebcfbe07f550aa4.png

Port anchor painted and stowed against the bow casement in its hinged latch with a wooden pin to secure it. BK 1/20/24

 

 

That's all for this time. Next will be the fashioning of anchor chain binders. See you then!

 

Tim

314-761-5435

Link to comment
Share on other sites

It's a good thing I have a thick beard or my jaw would be permanently bruised from hitting the desk every time you update this.

Edited by Cathead
Link to comment
Share on other sites

Hi all,

 

This entry is from July, 2023 and looks at making a chain binder w/ slip handle, and how to do splices using a homemade fid:

 

 

LEVER CHAIN BINDER WITH SLIP HANDLE

 

This device answers two questions on the fore deck of the St Louis. Number one, what was the purpose of the large ring bolt in one of the salvage pictures? Number two how did they control the anchor chain when deploying, it snubbing it, and weighing the anchor? This type of lever chain binder may have been used in this period of time.

 

image.png.04824c9c5f5f8e5571a648c365b151e5.png

 

image.png.7f2726bce04334303ef5b9b575fc8db9.png

 

 

image.png.8b3486cb6842e8fc7cd4d9982095daa5.png

 

image.png.406737d0ffc52aa71d06e31254c672f3.png

 

image.png.b006e4900642cf8b66d4791c7f19f611.png

 

MAKING SPLICES IN ROPES, with illustrations of their uses on Bill’s C. L. Hunley and HMS Bounty  (Pictures and captions by Bill Kammermeyer). While not technically 

image.png.190d15a1bae12e95dac45810928ebc36.png

 

 

image.png.d5d8dc89eedecb62b01d61b2cda5e5b1.png

 

image.png.6a85993cd7bc0bbb2e7011a98cd9a3b8.png

 

image.png.084ef76437d116fc2363ab77c036bcce.png

 

image.png.80ce4f1322cafbd921d14011abaf9d31.png

 

image.png.846cb46ce6c70bda3d0da5d14e5e0fb1.png

 

 

image.png.65337c33e9c85f50a11384ce110c3fc1.png

 

image.png.6207dee7e5950637fab5183d41958ab4.png

 

image.png.0db4eb895b75d3f154d35ab6fbd66b84.png

 

image.png.0a93e85156fa3dbb03d1d548793b5fb6.png

 

image.png.673c74d7f02d9883698e97e3e51e9bdf.png

 

OK, folks, we're caught up! The project is almost finished, with most of the effort going to making figurines 1/24 scale. Previous entries have looked at making armatures, heads and some clothing, which will be supplemented by adding specific figures in various poses around the gunboat. 

 

Tim

314-761-5435

 

 

 

 

Link to comment
Share on other sites

Don, this project was commissioned by the Missouri Civil War Museum, located on Jefferson Barracks (now a veterans' cemetery) in St. Louis. To be honest, there have been some communication problems between us and the Museum's director, so we're uncertain if and when the installation will be done. Hopefully it will come to pass, and if so, I'll be posting some pictures of the dedication/installation ceremony. Thanks for asking.

 

Tim

Link to comment
Share on other sites

  • 3 weeks later...

The crew heads are excellent. For clarity I am referring to the heads that sit upon the bodies not the bodies that sit on the heads.

Keith

 

Current Build:-

Cangarda (Steam Yacht) - Scale 1:24

 

Previous Builds:-

 

Schooner Germania (Nova) - Scale 1:36

https://modelshipworld.com/topic/19848-schooner-germania-nova-by-keithaug-scale-136-1908-2011/

Schooner Altair by KeithAug - Scale 1:32 - 1931

http://modelshipworld.com/index.php/topic/12515-schooner-altair-by-keithaug-scale-132-1931/?p=378702

J Class Endeavour by KeithAug - Amati - Scale 1:35 - 1989 after restoration.

http://modelshipworld.com/index.php/topic/10752-j-class-endeavour-by-keithaug-amati-scale-135-1989-after-restoration/?p=325029

 

Other Topics

Nautical Adventures

http://modelshipworld.com/index.php/topic/13727-nautical-adventures/?p=422846

 

 

Link to comment
Share on other sites

On 11/4/2023 at 11:37 AM, timboni said:

Don, this project was commissioned by the Missouri Civil War Museum, located on Jefferson Barracks (now a veterans' cemetery) in St. Louis. To be honest, there have been some communication problems between us and the Museum's director, so we're uncertain if and when the installation will be done. Hopefully it will come to pass, and if so, I'll be posting some pictures of the dedication/installation ceremony. Thanks for asking.

 

Tim

Tim,

 

Thanks, I hope you get your communications issues resolved - I am a little over 500 miles from St Louis and will make a special trip there just to see it in person. 
 

Don

Link to comment
Share on other sites

  • 1 month later...

Tim,

Thank you for the continuing fantastic updates to this decade long scratch-build model and my "hat is off" to all those "St. Louis Model Shipcrafters" who have persevered thru the "Pandemic" and continued their support and modeling skills. I echo Don's recent comments on "plans for "it's public display' which we originally estimated in 2014 to be a "Two or Three" year project however, we had failed to consider the volume of a 1:24 scale model which is also"over 7 feet long", and of all the possible modeling details that could be included, plus the inaccuracy problems we discovered on the available US Park Services "USS Cairo Class"  Ironclad model plans and missing data which required extensive additional research.  I also want to acknowledge all of the many NRG Member contributors to our "USS St. Louis" Model Forum.

 

JOHNHOWARD

Link to comment
Share on other sites

  • 3 weeks later...

Hi all, and Happy New Year! Bill is still working on the figurines, but in the meantime, here are some pictures of one of the ship's boats on davits, with tackle, and also some items such as oars, a boat hook, a box for smaller items, a grappling hook, an axe, and several lengths of rope. (The "railroad track" is in fact part of a ropewalk device made by Bill) 

 

Tim

image.png.6551a6f15f5ca4abb105b4de9ae68f05.pngimage.png.c9992696976e00f0b31b5bc08685c8c2.png

 

image.png.49db2a81ea7d8cedc1f2a80f166178f3.pngimage.png.1b38a569aafd737d2c0eb6a79cfd535b.png

image.png.0452f191b7bbc3a5ec738f59d83e3e54.pngimage.png.fbdac98c4aec07bd255d053ff5787552.png

 

 

 

Link to comment
Share on other sites

Stunning work gentlemen, absolutely stunning! I sure hope that everything works out with the museum, I will make a trip to see this build first hand when it’s done. 

 

-Brian

Current Builds:                                                                                                  Completed Builds:

Mississippi River Towboat Caroline N.                                                                HMB Endeavor: Artesania Latina

                                                                                                                            USS Constitution - Cross Section: Mamoli

Non-Ship Builds:                                                                                              HMS Victory - Cross Section: Corel

New Shipyard                                                                                                     King of the Mississippi - Steamboat: Artesania Latina

                                                                                                                            Battle Station Section: Panart (Gallery)

In Dry-dock                                                                                                       Chaperon - 1884 Steamer: Model Shipways  

USS Constellation: Aretesania Latina                                                                  USS Cairo - 1862 Ironclad: Scratch Build 

Flying Fish: Model Shipways                                                                               

                                                                                                                            

                                                                                                                            

Link to comment
Share on other sites

Some very nice hand crafted brass work - well done.

Keith

 

Current Build:-

Cangarda (Steam Yacht) - Scale 1:24

 

Previous Builds:-

 

Schooner Germania (Nova) - Scale 1:36

https://modelshipworld.com/topic/19848-schooner-germania-nova-by-keithaug-scale-136-1908-2011/

Schooner Altair by KeithAug - Scale 1:32 - 1931

http://modelshipworld.com/index.php/topic/12515-schooner-altair-by-keithaug-scale-132-1931/?p=378702

J Class Endeavour by KeithAug - Amati - Scale 1:35 - 1989 after restoration.

http://modelshipworld.com/index.php/topic/10752-j-class-endeavour-by-keithaug-amati-scale-135-1989-after-restoration/?p=325029

 

Other Topics

Nautical Adventures

http://modelshipworld.com/index.php/topic/13727-nautical-adventures/?p=422846

 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...