Jump to content

Swallow 1779 by tlevine - FINISHED - 1:48 scale


Recommended Posts

A few years ago, I was looking at some of the models posted on the RMG website and came across Swallow 1779.  I instantly was attracted to her overall appearance and the fact that she was clinker-planked.   The model is listed as SLR0540 and the plans are ZAZ4719.

1448207178_Swallow(1779)-Warship-Brig-Sloop-14-guns-0a.jpg.e3f885d62571cfd7901348984918a400.jpg

1502321299_Swallow(1779)-Warship-Brig-Sloop-14-guns-1a.jpg.b44bc9297c470b4b90d66c3e240c9029.jpg

Swallow did not have a long career.  According to Rif Winfield, in his book “British Warships in the Age of Sail 1714-1792”, she was purchased on the stocks in 1779 and was originally designed to be a cutter.  On the sheer plan one can see where the original mast (located at the dead flat) was erased from the plan.  She was registered as a sloop and originally carried fourteen 4pdr guns.  The following year, four 18pdr carronades were added.  There is no mention of swivel guns, although the plan shows mountings for twenty-two of them.  With Lively, Swallow captured the US privateer Black Prince in 1779.  She was coppered in 1780 and on August 26, 1781,, Swallow was run ashore and burnt to avoid capture by US privateers off Long Island.

 

The first order of business was to develop a set of plans.  Comparing the plans with the model revealed several inconsistencies.  Starting at the bow, the model has a much larger stem with cheeks, rails, a false rail and a figurehead.  The bowsprit come out of the hull in the midline.  The plans show a simple stem and the bowsprit exits the hull to the port side of the stem.  The model shows the capstan at midships but the plan has it aft of the main mast.  The locations of the various hatch covers also differ between the model and the plan.  There is a difference in the deadeye configurations and the swivel guns are not modeled.  Finally, although the gold detailing is stunning, this little boat certainly would have never been decorated in other but the simplest schema.  To make things even more confusing, in small print on the plan is the following..."a copy of this was given to Mr. Ladd for finishing two cutters the Board bought of him when half built 9 Feb? 1779".  And, yes, the question mark was in the sentence as written.  So the plan is actually the proposal for finishing and not as-finished.  

 

I had to decide whether I was going to model a model or model a ship.  Because the model is most likely a presentation piece, I decided to use the plans layout rather than the model's.  This still left me with concerns.  The biggest one was whether to model the swivels.  Since the model does not show them and Winfield does not mention them, I decided to leave them off.  There is also no "proper" access to the lower deck on the plan but a companionway is visible on the model.  I have added a ladder and companionway.  If any of you have additional information or insights to the contrary, please let me know.  Things are easy to change at this point.

 

This was going to be a plank on bulkhead model.  My reason for this construction style was that the beauty of this ship will be in the clinker planking; therefore, both sides of the hull will be completely planked.  I will be installing the lower deck and its associated fittings in the mid-ships area as I plan on making the hatch covers removable.  Plans were developed using the tutorial written by Wayne Kempson which is found in the Modeler’s Database. 

http://modelshipworldforum.com/resources/plans_and_research/DraftingShipPlansInCADwayne.pdf  TurboCAD 18 was my CAD program. 

803630524_Swallowsheerplana.thumb.jpg.9aa63f94415fb67c847af84fbe6a5bee.jpg

Once the plans were developed I made a half hull in 1:96 scale to make sure that I did not have any glaring errors in my rendering.  

1202113214_BabySwallowa.thumb.jpg.abf233cf3e7dd5be8b6ffd02ab51e3f7.jpg

 

 

 

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

Original armament, according to Lyon's The Sailing Navy List, was 10 4 pounders and 12 swivels. 4 18 pounder carronades 'were to be added'. I would trust Lyon over Winfield, with all due respect to both gentlemen!

Be sure to sign up for an epic Nelson/Trafalgar project if you would like to see it made into a TV series  http://trafalgar.tv

Link to comment
Share on other sites

Thank you druxey.  I only have Winfield.  If you notice anything else, let me know.  

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

Hi Toni - 

 

Looks like another interesting project, and the finished model is certainly quite beautiful.

 

I have done a number of lapstrake hulls, and I would not want to fiddle with fairing the overlaps while also worrying about the dead space between bulkheads.

I would fill at least one more space at the bow and two at the stern.  That should make the fairing process a bit easier.

 

Hope that helps.

 

Dan

 

Current build -SS Mayaguez (c.1975) scale 1/16" = 1' (1:192) by Dan Pariser

 

Prior scratch builds - Royal yacht Henrietta, USS Monitor, USS Maine, HMS Pelican, SS America, SS Rex, SS Uruguay, Viking knarr, Gokstad ship, Thames River Skiff , USS OneidaSwan 42 racing yacht  Queen Anne's Revenge (1710) SS Andrea Doria (1952), SS Michelangelo (1962) , Queen Anne's Revenge (2nd model) USS/SS Leviathan (1914),  James B Colgate (1892),  POW bone model (circa 1800) restoration

 

Prior kit builds - AL Dallas, Mamoli Bounty. Bluejacket America, North River Diligence, Airfix Sovereign of the Seas

 

"Take big bites.  Moderation is for monks."  Robert A. Heinlein

 

 

Link to comment
Share on other sites

Agree with you 100% Dan.  I plan on adding fillers in the bow and stern areas to facilitate planking.

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

That's a nice looking boat Toni, good luck with the build

Regards

Paul 

The clerk of the cheque's yacht of sheerness

Current build HMS Sirius (1797) 1:48 scratch POF from NMM plans

HMS Winchelsea by chuck 1:48

Cutter cheerful by chuck 1:48

Previous builds-

Elidir - Thames steam barge

Cutty Sark-Billings boats

Wasa - billings boats

Among others 😁

 

Link to comment
Share on other sites

That's a lovely model, Toni and I love the details of the launching cradle. I look forward to your approach to clinker style planking

Greg

website
Admiralty Models

moderator Echo Cross-section build
Admiralty Models Cross-section Build

Finished build
Pegasus, 1776, cross-section

Current build
Speedwell, 1752

Link to comment
Share on other sites

I agree, Greg.  That cradle adds a lot to the model.

 

I am using 1/4" basswood plywood for the backbone and bulkheads.  The thickness will result in a stronger structure and will give a better gluing surface for the planking.  The backbone is made from three pieces and the joints are supported with a strip of scrap.  You can see the section between stations F and 16 that will have the lower deck completed.  To make cutting the rabbet easier, the upper part was sanded into the backbone before the keel/stem assembly was added.  At station O, the angle of the rabbet gradually increases from 45 degrees to 90 degrees and the width therefore becomes more narrow.  Just below station FP, where the angle is 90 degrees, the entire width of the rabbet is on the stem.  

92198620_Spineassembleda.thumb.jpg.32ac7393ae332472a1c4361bd033c8d8.jpg

The keel, stem and sternpost are made from costello boxwood.  The false keel is pear.  The width of the keel is 10.5" based on the RMG plan.  This is narrower than the 12.5" dictated in the Establishments but this difference most likely is because Swallow was designed as a merchant cutter, not a military sloop.  I do not have any pictures showing the construction sequence, but it is straight forward.  The keel was made from three pieces, scarfed together and secured with six bolts.  Black paper was inserted into the joints to simulate felt.  A 45 degree bevel was cut into the keel from station 14 going forward for the rabbet.  Aft of station 14, the deadwood starts and the angle changes.  The plan does not show structural details for the stem and I was unable to determine the structure from the model.  Based on other ships of this size and era I came up what I feel is a reasonable guess.  The width of the stem is 12" at the head, diminishing to 8" at the keel.  These joints also have black paper to represent felt.  Brass wire was inserted through the inner part of the stem to secure the pieces together.  The pictures show the stem before the rabbet was cut.  The bottom of the keel is curved fore and aft.  In order to keep the hull stable on the building board, I added scrap basswood to the bottom of the false keel.

1069628862_Stemportsidea.jpg.b845ced7ad427111fa9848a385007681.jpg

1982519947_Stemstarboardsidea.jpg.26aa7796ff65e4db6cdee2706681506b.jpg

The photo shows a test fit between the backbone and the keel/stem assembly.

1649352246_Spinewithsterma.thumb.jpg.9ebd509ccc9be8f175408b4e43fa4908.jpg

Although this picture is taken out of sequence, it shows how the keel and stem were bolted together.

520408671_Keelboltsa.jpg.dd567fd0e66ae07469805b0d273a89ee.jpg

 

 

 

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

Have you looked at the ANCRE monograph for Le Cerf 1779?  It is also a cutter and clinker.  The different construction for it is that the frames notched. The upper edges of the planks are thicker - the lands are mostly cut into the frames.  

Buenas suerte and buena fortuna  on the clinker planking.  I think it is significantly more difficult to do well than carvel.

NRG member 45 years

 

Current:  

HMS Centurion 1732 - 60-gun 4th rate - Navall Timber framing

HMS Beagle 1831 refiit  10-gun brig with a small mizzen - Navall (ish) Timber framing

The U.S. Ex. Ex. 1838-1842
Flying Fish 1838  pilot schooner -  framed - ready for stern timbers
Porpose II  1836  brigantine/brig - framed - ready for hawse and stern timbers
Vincennes  1825  Sloop-of-War  -  timbers assembled, need shaping
Peacock  1828  Sloop-of -War  -  timbers ready for assembly
Sea Gull  1838  pilot schooner -  timbers ready for assembly
Relief  1835  ship - timbers ready for assembly

Other

Portsmouth  1843  Sloop-of-War  -  timbers ready for assembly
Le Commerce de Marseilles  1788   118 cannons - framed

La Renommee 1744 Frigate - framed - ready for hawse and stern timbers

 

Link to comment
Share on other sites

Jaager, I hope I do not need too much luck but I am happy to accept good fortune.  Seriously, I have not looked at Le Cerf.  At one point I toyed with the idea of opening up the midships on one side and installing "real" frames rather than bulkheads, showing the frame notches.  I am still thinking about it but do not have to make a final decision for a while since I plan on completing the lower deck before starting planking.

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

Really nice choice Toni.  I actually considered this as a subject for a kit but saw too many differences between the model and the drafts I found.  I even questioned whether the model is properly identified so i decided against it.  But like you I fell in love with the model.  

 

You are off to a great start.  

 

Chuck

Link to comment
Share on other sites

6 hours ago, Chuck said:

I even questioned whether the model is properly identified

Wonderful model but I am also cautious about the identification.

🌻

STAY SAFE

 

A model shipwright and an amateur historian are heads & tails of the same coin

current builds:

HMS Berwick 1775, 1/192 scratchbuild; a Slade 74 in the Navy Board style

Mediator sloop, 1/48 - an 18th century transport scratchbuild 

French longboat - CAF - 1/48, on hold

Link to comment
Share on other sites

Toni,

I think the clinker planked boat is a great idea.   Few of us have done one and this will be a tremendous opportunity for us to learn some different techniques.  You've got a great set of plans, even if some modifications might be necessary.  No pressure to match your project to the model since there are questions of provence.  She's a lovely boat.  Looking forward to the saga.

Maury

Link to comment
Share on other sites

Jan, thanks for the reference.  You are right, the head looks much more like the model, although the model had a figurehead instead of a fiddle head.  Zephyr shares the same capstan location as seen on the plans for Swallow (neither of which agree with the model) and there are no gun ports on the transom.  I struggled with the whole issue of accuracy for several months before deciding to forge ahead with the project.  I guess at this point you could say that I am modeling the plan with the addition of a ladderway (and possibly a companion) and only twelve swivel guns but using the model as inspiration.  

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

Link to comment
Share on other sites

I was thinking the figurehead on the model might depict St Francis, being a tie-in with the name ' Swallow '..

Luck is just another word for good preparation.

—MICHAEL ROSE

Current builds:    Rattlesnake (Scratch From MS Plans 

On Hold:  HMS Resolution ( AKA Ferrett )

In the Gallery: Yacht Mary,  Gretel, French Cannon

Link to comment
Share on other sites

Thanks for all the likes.  Mike, I plan on making the cradle.  Gregory, the nuns never taught me that relationship...and they were Franciscans.

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

  • 2 weeks later...

It has been a while since I updated the log but installing bulkheads and fairing a hull just is not very exciting.  The fist step in permanently installing the bulkeads is making a building board.  This will secure the keel so that the bulkheads (hopefully) will be installed plumb and square.  I was able to reuse my building board from Atalanta and simply glued Swallow's waterline plan to the board.  I secured two strips of wood on either side of the midline with oversize holes to that they could be snugged against the keel.

1905683494_BuildingBoarda.thumb.jpg.36aba9cf1a61813b5485a8ece05f2a80.jpg

The bulkheads were cut from 1/4" basswood plywood.  I plan on constructing the lower deck amidships so the center of bulkheads F through 14 only extend to the level of the lower deck.  The other bulkheads extend to the upper deck.  

Bulkheadsa.jpg.bc3c3d6071f50f5a0552d9b09c7696e5.jpg

The bulkheads were installed using the same technique seen in the half hull project, clamping them to machinist squares.  I also keep a small level on the bulkhead while the glue sets.  This becomes most important with the bulkheads that only extend to the lower deck; there is only a narrow slot so it is easy to get them out of plumb.  Once all the bulkheads were in place, spacers were installed to stiffen the hull in preparation for fairing.

2125538688_Bulkheadsinstalled1a.thumb.jpg.2f0cd55eb11ce16fb1a61171062f6547.jpg

336400802_Bulkheadsinstalled2a.thumb.jpg.cb7e896c2b93c7eebd6db9119e1f1bea.jpg

I use a combination of techniques to fair the hull, including sanding discs on the Dremel, sanding blocks and files.  One thing which is very helpful for the concave surfaces in the stern is rolling sandpaper around one of the rubber sleeves from my spindle sander.  Before I owned the spindle sander I would use a shot glass.  The key in fairing a hull is taking a lot of breaks.  It is too easy (for me at least) to remove too much wood otherwise.  On this hull you can see a few places that happened.  Those spots were built back up with strips of walnut from the scrap bin.  One techniqe I use to check for a fair run is to take strips of masking tape and run them along the hull.  Another useful technique is to run a marker along the bulkhead.  As the hull approaches fair, the marker is gradually sanded away. 

Fairing1a.thumb.jpg.cf6a4573868ca48ee49f4ec0f7c051cb.jpg 

At this point I am reasonably satisfied with the shape of the hull.  Several of the spacers become loose during the fairing process.  Rather than replacing them, I ran a ribband along the hull, gluing it in place and then securing it more with zip ties.  The red marks represent the wale and the bottom of the rail.  The plans show the gunports extending to the rail but the model shows an additional row of planking above the ports.  I have not decided which direction to go at this point.  Neither the plans nor the model are "as built" and it was common to add the extra row of planking to help protect the crew.  

Fairing2a.thumb.jpg.3676eea33d6585c716f82246783d59ce.jpg

Fairing3a.thumb.jpg.905547d99741c4c4afb4c6cfd0e10626.jpg

Fairing4a.jpg.9a21061a2fa4ba9dcb0929ac6b193746.jpg

Fairing5a.thumb.jpg.2bb9904cb112b98193bff3ae082616cd.jpg

Bulkheads installed3a.jpg

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

  • 3 weeks later...

It has been a while since I posted an update but not for inactivity in the workshop.  Once the hull was faired, I installed the upper deck clamps.  These were made from beech because of its flexibility.  This was also a good time to make the upper deck beams.  They have a 6" roundup.  Only the beams under the deck openings will be visible so these were made from costello; the rest were make from ply.  Two of the beams were temporarily installed to prevent rotation of the hull.

369684512_Deckclampsa.thumb.jpg.106191af046f77f30a87c06570fdd30a.jpg

325404895_BuildingBoard2a.thumb.jpg.c88a312d0cd361a8d7ebcd6b5730a4bf.jpg

As mentioned previously, I plan on having the gratings for the hatches removable.  The lower deck waterway was installed next.  Although the ability so see details on the lower deck diminishes the further you get from the midline, I decided to install waterways and ceiling timbers.  All of these were made in costello.  However, because the inner hull will barely be seen, these planks were edge-bent rather than spiled.  The apparent irregularity in the waterway of the first photo is an optical illusion, as it is not seen in the second photo.  

Ceilinga.thumb.jpg.eb2daaf6d3f53cfe121a94bea1a8ccd8.jpg

Ceiling2a.thumb.jpg.2d23dec8c77d470fc9856ad112a5e0eb.jpg

I was preparing to install the transom and the counter timbers when nothing started to make sense.  I double checked all of my measurements, both against the CAD drawing and the original plans and discovered that although I had done a beautiful job of fairing the outside of the hull, the tumblehome was too great by approximately 4".  This left me two options: keep going and simply build a slightly inaccurate hull or laminate extra wood onto the bulkheads and start the fairing process again.  The first option was unacceptable to me and so I spent another week undoing my error.  The transom/counter timber assembly is next.  The transom took only three attempts to get right.  My initial attempt was the alarm bell informing me that the fairing was incorrect.  My second attempt utilized a transom configuration from my CAD drawing; this was too small.  Finally, I took an over-sized piece of basswood, installed it and shaped it based on the curvature of the hull.  What I discovered was that the shape of the aft surface of the transom was almost identical to the shape from the CAD drawing.  Two brass pins secure it to the backbone.

 

I installed the six counter timbers into slots in the aft bulkheads.  Thread is tied between the ribbands to maintain the correct curvature.  This will facilitate fabrication of the filler pieces.

Counter1a.thumb.jpg.7a4269f38fa6683060a7a41563138940.jpg

Counter2a.thumb.jpg.0ab9695d76a6c5883fb2c42c136a791c.jpg

Counter3a.jpg.bda209827b33f93ac23b49ad2d18db83.jpg

Counter4a.jpg.8326397d2729a8bbe15b00523595aa52.jpg

There is still some fairing to do on both sides but I will hold off on that until the lower deck is completed.

Counter5a.thumb.jpg.28890a443c02ab23e1f25d4e7cd1e483.jpg

 

 

 

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

  • 4 weeks later...

I realize it has been a long time since my last post but I will try to be better going forward.  The lower deck has a fore and main hatch, a pad for the stove and a pad for the base of the capstan.  I do not see any evidence of mast partners on the plans.  There are also openings in front of the main mast for the pumps. The hatches are constructed next.  Because this is a POB model, the frame construction is simplified from the prototype.  A more complete description of hatch construction is located here:

 

The gratings were made first and the frames made to fit the gratings.  On a ship of this size, the ledges (the notched part of the grating) were 3.5" x 1" and the battens (the strips that fit into the notches) were 2.5" x 3/4".  In order to maintain an even spacing between the notches, I CA'd a strip of wood the same width as the batten onto my Preac.  Then, using a blade the same width as the batten (0.05") it was a simple matter to cut the strips of notched wood.  I generally use two hands when cutting the notch but needed one hand to take the photo.

510622528_Lowerdeckhatches1a.jpg.84c186ac73def70132e2b8dfc39a31c2.jpg977312484_Lowerdeckhatches2a.jpg.1cc396b52898227d9d359efccc5a6542.jpg

The pictures show both hatches in position on the paper template.  I simulated the treenails in the hatch grating by making a depression with the point of a compass and putting the tip of a sharp pencil in the depression.

2009931_Lowerdeckhatches3a.jpg.220b456b755a2dc9e8d9e2a08a83046c.jpg

1004400076_Lowerdeckhatches4a.jpg.e65b2aed3d89b64b66eb609da097d113.jpg

1250159997_Lowerdeckhatches5a.thumb.jpg.480514986f43d2062c908de32f222b88.jpg

The pad for the stove was installed next, just in front of the fore hatch.  This will be covered with an "iron" plate later.

119190328_Lowerdeckhatches6a.thumb.jpg.64da8e4a7f6d3b547d4899e6d545d8b7.jpg

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

The lower deck planking is 2" x 10" with an average length of 15 feet.  I used a four-step butt shift.  As this deck will barely be seen, I did not treenail the deck.

414014984_Lowerdeckplanking1a.thumb.jpg.e93e2dfdb9a042390bc23906aca26110.jpg

1870509326_Lowerdeckplanking2a.thumb.jpg.6c4bcb3098b53b901b6d910ddf6fece0.jpg

At this point I had an oh-s*** moment.  I inadvertently placed the main hatch too far aft, a distance of one bulkhead.  So all of the involved planking and the main hatch were removed.  Surprisingly, I did not damage the hatch in the process.  The hatch was then installed in its correct location.  The hole is the location of the main mast.

1957623180_Lowerdeckplanking3a.thumb.jpg.0835ce7781bc972f1ab0e26cfccb735d.jpg

The holes for the mast and the pumps have been enlarged to their final size and the pad for the base of the capstan is installed in front of the bulkhead leading to the captain's quarters.

2107897683_Lowerdeckplanking4a.thumb.jpg.bc3ff8ddb20a7d525f48c2de28620f84.jpg

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

Until this point, I had not decided how much of the lower deck would be visible.  My final decision is to have the fore hatch permanently fixed in place and the main hatch cover removed and placed to the side of the hatch.  The stairway aft of the main mast will also provide visibility to the lower deck.  For this reason, I am building the bulkhead just aft of the capstan spindle.  This is the entry to the captain's cabin.  The exact configuration is an educated conjecture.

 

A template for the bulkhead was made from paper and the wood strips were glued onto the template.  The raised areas are built up with two layers of strips.  The windows are painted paper.  After I installed the bulkhead, I realized that I did not leave enough room above the doors for them to open without hitting the upper deck beams.  So I had to remove the completed bulkhead and remove 4" from the bottom to accommodate that.  After reinstalling it, s finishing strip was glued above the assembly.  The first two pictures are "before" and the last two are "after" replacing the assembly.

1264993248_Lowerdeckaftbulkhead1a.thumb.jpg.6f853e5ba379f90655a0bcbfa06232b7.jpg402077364_Lowerdeckaftbulkhead2a.thumb.jpg.faf88b0fcc7969ff6485a4c9515b1968.jpg761045242_Lowerdeckaftbulkhead3a.jpg.bace4016579d66bfeec1ba8a91505c9f.jpg1574866650_Lowerdeckaftbulkhead4a.jpg.2efb3bbccc58a785039a6eb0f4e14cb6.jpg

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

The ship's stove was modeled after the one illustrated in TFFM Vol. 2.  Because this area will barely be visible, there is no detail work on the stove.  It was made up from basswood sheet and painted with dilute artist acrylics.  The metal base is painted paper.

Stove1a.thumb.jpg.3322d471964426da87b2fbf462197dd0.jpg

Stove2a.jpg.a0684956871894e1efd96682aa6e2381.jpg

Stove3a.jpg.def71870872583fe147891e332c8c5e6.jpg

 

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

Nice simplification, Toni! Gratings look great. Before you do the weather decks, you might want to check the pattern of your butt shifts. (That didn't sound quite right. You know what I meant!) 

Be sure to sign up for an epic Nelson/Trafalgar project if you would like to see it made into a TV series  http://trafalgar.tv

Link to comment
Share on other sites

Thanks for the hint, Druxey.  I realized the problem about 3/4 of the way after I had already redone it once.  I promise it will not happen again!  Also, thank you to everyone for their likes.  

Toni


Chairman Nautical Research Guild

Member Nautical Research and Model Society

Member Midwest Model Shipwrights

 

Current Builds:     NRG Rigging Project

Completed Builds: Longboat - 1:48 scale       HMS Atalanta-1775 - 1:48 scale       Half Hull Planking Project      Capstan Project     Swallow 1779 - 1:48 scale               Echo Cross Section   

Gallery:  Hannah - 1:36 scale.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...