Jump to content

Charles P Notman by cdrusn89 - FINISHED - BlueJacket Shipcrafters - 1/96


Recommended Posts

I finished the Fannie A. Gorham (three masted schooner) this morning and have the Charles P. Notman (4 masted schooner) ready to start but first need to clean up and reorganize the workshop.

 

This kit will be a first for me as the Notman used galvanized wire for the standing rigging so no Black/Dark Brown thread during this build.

 

Since the workbench is still a mess I will have to start with a picture of the box on the shelf. I did open it already and will take a look at the instructions and drawings when I get a spot cleaned off enough. It seems I must have taken out/used every tool, box, container and bottle in the course of building the Gorham. What a mess.

 

Famous last words - "I will clean up and put things away as they are no longer needed - THIS TIME!"

2F17F030-7633-4219-B374-2D931A2B8BE7_1_105_c.jpeg

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

Gary,

 

I am following as well, I have had my I on this kit for two years. I just can’t bring my self to spend that kind of money on a kit, until I hone my skills to be much finer. Looking forward to watching your build. 
 

John

Gallery Photos of My Charles W Morgan 

Currently working on New Bedford Whale Boat

 

 

 

 

Link to comment
Share on other sites

Eduardo/John,

 

Welcome aboard.

 

It may be a few days before I actually get started on the Notman.

 

The workshop is really a mess.

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

Chris,

 

    The level of detail and instructions are at a much higher level than on the Gorham. Vic told me the Gorham kit was developed in the 80's and the Notman in the early 2000's.

 

   I too am looking forward to seeing it come together.

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I got one end of the workshop cleaned and reconfigured to provide a good view of one sheet of the plans - in this case the profiles.should be useful when constructing the hull.

 

I will work the other side tomorrow. You would think I would have the arrangement down after four kits built in this workshop but every time I seem to come up with "a better idea'. I am reminded of a quote from  ADM Gorschkov (head of the Soviet Navy in the 1980's) that "better is the enemy of good enough".

IMG_3318.JPG

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

great choice for a schooner build.   I built Charles Notman in 1:48 scale and RC sailed her twice. I got quite a few fittings from Bluejacket.  They can be quite helpful too.    A friend was building the kit at the same time.   He loved it and did a great job.  She is a real beauty.   I recommend you find a copy of  A Shipyard in Maine.  It tells the whole story of Percy and Small where Charles Notman was their first 4 master. 

 

I will definitely follow along

 

cheers 

jon 

Link to comment
Share on other sites

Jon - I have (and have read) "A Shipyard in Maine" and visited the Maine Maritime Museum last summer while on a road trip that got cut short by an impending (but eventually a non-event) hurricane.

 

In my previous life I spent a good deal of time in Maine at BIW watching them build the Arleigh Burke (DDG 51).

 

I actually considered trying to build the Notman at 1/48th but the model would be over 6' long and I had enough trouble finding a place for the 1/35th scale Endeavour I built last year and that is just over four feet long (but five feet high).

 

I will try and do the model justice.

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

So I made up a bunch of new sanding sticks (I use tongue depressors), put new sheets on my sanding blocks, cut the building board and cleaned up my power tool table.

 

So it is time to "start building".

 

The rest of the cleaning can wait until I get "something" done.

IMG_5278.jpeg

IMG_5279.jpeg

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

The Notman looks like an interesting challenge. I wish you had shown us pictures before the clean up. Probably would have made me feel better. I’m following your build...Moab

Completed Builds:

Virginia Armed Sloop...Model Shipways

Ranger...Corel

Louise Steam Launch...Constructo

Hansa Kogge...Dusek

Yankee Hero...BlueJacket

Spray...BlueJacket

26’ Long Boat...Model Shipways

Under Construction:

Emma C. Berry...Model Shipways

 

Link to comment
Share on other sites

Welcome aboard Moab.

 

You asked for it - here is the part I haven't gotten to yet.

 

 

IMG_0652.JPG

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I had to adjust several of the port side bulkheads to get the required 1/16" clearance at the bottom  having decided that getting the 1/16" at the top was the more important place.

 

As can be seen a similar condition exists for the starboard bulkheads. I used the disk sander (with 220 grit) to very lightly take a bit off the bottom of the offending bulkheads with a 1/16" X 1/16" piece of boxwood clamped flush with the top of the keel to make sure I maintained the 1/16 clearance at the top.

IMG_5284.thumb.jpeg.1f3df83609bc80d63b0e0966bd4fb1c0.jpeg

Here are a before and after of one of the bulkheads that was modified.

IMG_5285.thumb.jpeg.48266fc07e2fcf1435426ec3d239c80e.jpeg

IMG_5289.thumb.jpeg.87daf4535b6f0174823a55b87009680e.jpeg

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

Gary; love the before photo. Makes me feel at home. Looking forward to a great build...Moab

Completed Builds:

Virginia Armed Sloop...Model Shipways

Ranger...Corel

Louise Steam Launch...Constructo

Hansa Kogge...Dusek

Yankee Hero...BlueJacket

Spray...BlueJacket

26’ Long Boat...Model Shipways

Under Construction:

Emma C. Berry...Model Shipways

 

Link to comment
Share on other sites

Continuing to build out the port side of the hull structure.

 

Everything is pretty straightforward except the LTN3A piece which forms the deck beam at Bulkhead 3 (LTN 3) sticks out past the end of the bulkhead and has to be trimmed back. Here is the offending part installed and sanded down (some). There will be balsa fillers in this area so this is not the last thing that will have to be sanded down..

IMG_5295.thumb.jpeg.f8dfeb92d6806f811c79d9dc0eca0864.jpeg

I used most every square "shape" I have to get the bulkheads glued in perpendicular to keel. It took several sizes of clamps due to the size of the "squaring blocks" and the size/shape of the bulkheads. Here is a shot of "work in progress".

IMG_5292.thumb.jpeg.00cf911b12893915b0776eb983a738dd.jpeg

It has been my practice on past POB kits to add diagonal stiffeners between the bulkheads and the keel and I am continuing that practice on the Notman. You can see these stiffeners in the picture below. After I did these I decided it might be better to get the decking installed first before adding the rest of the stiffeners so that was the next step.

 

I use thin CA to attach the stiffeners as this permits me to just hold the stiffener in place and hit it with the CA, hold for 5 seconds and that one is done.

 

Here is the hull with the aft deck and stiffeners in place.

IMG_5294.thumb.jpeg.4512884c5554aca798cf2a74f3e34fa3.jpeg

And here is the port side ready to add the lateral stiffeners which will support getting the starboard side bulkheads on "square".IMG_5296.thumb.jpeg.fb4f16e4d27ff0a6287cd06ef7d6ee46.jpeg

 

 

 

Edited by cdrusn89

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I started to cut the reinforcing pieces where the masts are stepped and found I was short one piece of the 1/2" X 1" basswood required. After looking around I found some 1/2" thick yellow cedar left over from something and I decided to use this instead of the basswood. I also decided to increase the size of the mast reinforcements to 1/2 X 2" so I cut two 15" strips which should be more than enough to do both side. Here are the two pieces and a dry fit of the fore mast one on the starboard side.

IMG_5297.thumb.jpeg.a123b790c5f1b60353b9c997a275dd15.jpegIMG_5299.thumb.jpeg.8f8b489ae059e213cdf9b7d937e34cc4.jpeg

Here is where we are Thursday night

 

I have all the bulkheads installed with the last two drying. I still have to install the diagonal reinforcements on the starboard side. I also have the two forward subdecks installed and the port side main subdeck. Once the starboard main subdeck is installed it will be time to install the rest of the reinforcing pieces (top and bottom) and then work on the filler blocks.

 

Here is the foredeck area (with some preliminary filler block work) and the two remaining bulkheads on the starboard side clamped up waiting for the glue to set.

IMG_5301.thumb.jpeg.c3f227e6c496a7451f894154c41263f2.jpegIMG_5302.thumb.jpeg.031444d6436cfd24aecfe69ab86a5c86.jpeg

 

 

 

 

 

Edited by cdrusn89

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I got all the reinforcing done and added the filler blocks.

 

The instructions and drawings show  fillers in the first three "blocks" forward and the last two aft. Based on experience on the 1/35th scale Endeavour I did all the blocks from Bulkhead 6 to the bow and from Bulkhead 13 to the stern. I used the pictures in the Photo CD to get an idea of what the block at the very stern should look like. The instructions promise that this will be dealt with "later". On the Endeavour I filled in the entire hull with balsa (was advised to by others who had experience building her) and was tempted to do that here as well but the hull is not nearly as complex as the Endeavour so I opted to fill in from both ends until the hull sections were close to the same.

 

Not the prettiest balsa filler job I ever did but 80 grit sandpaper can cut down balsa pretty quickly (I hope).

 

So here she is with the hull structure complete and waiting for the decking to be installed before being glued to the build board.

 

 

IMG_5304.jpeg

IMG_5305.jpeg

4F7A9B1E-6346-4A3F-B2BC-EE0FF90C51F6_1_105_c.jpeg

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

Next step, per the instructions is to put the prefabbed decking materiel on the decks (atop the subdecks).

 

On the foredeck this is just the two laser cut pieces which are joined in the center (which will be largely invisible because the bowsprit will be directly above).

Here is the stbd side foredeck planking being glued in place (port side is already down).

 

IMG_5311.thumb.jpeg.79285cc4658bc603082563e0d6ef2f7d.jpeg

 

However on the poop and main decks there is a strip of 3/32" wide planking that goes down the middle of each deck and then the laser cut pieces butt against this strip and continue to the deck edge. The 3/32" decking is supplied in 11" lengths and the seven plank wide strips are cut from this sheet. Given that the sheet is not long enough to cover the entire poop deck in one piece creates the question of where to make the joint which should be somewhere that will be covered by some piece of deck furniture as there is no realistic hope of getting two pieces of the planking to have similar enough coloring and spacing to not make a joint very noticeable.

 

It turns out that there is a hatch that almost completely cover the centerline area between bulkheads 12 and 13 and that the 11" length is just long enough to extend from the front of the main deck back to between BH 12 and 13. So that is where the joint will be placed.

IMG_5313.thumb.jpeg.c6cd870962272b8260c9d27fd6570682.jpeg

So here are the center planks being weighted down while the glue sets.

IMG_5314.thumb.jpeg.3e3eaca1d70c548e7b86373c4081d1b9.jpeg

And, yes those are two bulkhead extensions that have broken off (the two forward most) laying on the main deck.

 

With the foredeck planking completed I moved on to the main deck. It took some filing of the notches for the bulkhead extensions and the removal of one or two rows of planking but otherwise they installed without incident.

 

Here is the fore and main decks with the planking in place.

IMG_5317.thumb.jpeg.e0ea00760c7f64c4940c45083fbf53ed.jpeg

And here is the entire deck. I am not going to install the poop deck planking now as there was an issue with one of the pieces and BlueJacket is sending a replacement. I am going to wait until I have two good pieces before deciding which one goes where as they are interchangeable port and starboard. I (of course) want the best looking deck I can get short of planking it myself (although that thought did cross my mind).

 

IMG_5316.thumb.jpeg.f2c9dc15b5f1542f0d8e0d847a314a3d.jpeg

 

 

 

 

 

Edited by cdrusn89

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

When I decided to do the lower masts in Cherry I had not looked ahead (carefully enough) to realize that all the spars are "painted brown - actually washed in diluted brown paint on the prototype.

 

So, after getting the three lower masts completed I had to generate Cherry to provide the four topmasts, four booms and the jib boom (all starting with 3/16" material (dowels for the booms and jib boom and square for the topmasts). I have not yet addressed the gaffs which are 1/8".

 

Since the lower masts are mostly 5/16" without taper but has a substantial 1/4" square section at the top (1 3/4" per the instructions, 1 1/2" on the drawings), I started by creating the round lower part from a square piece of Cherry that I used the thickness sander to get to 21/64" (the Byrnes thickness sander can get this accuracy - the thickness did not vary more 1/64" through the entire 12+ inch piece I fabed). I used a jig I made for fabbing the Niagara lower masts from Yellow Cedar - it is pictured below.

IMG_5326.thumb.jpeg.41814514cf3b2ae6317d92a3489ae633.jpeg

I clamped it to the desk to keep it from moving and used a 3" block plane to take it from square to octagonal. Then I used my big Jet drill press as a poor man's lathe to smooth the octagonal to round and down to the 5/16" speced diameter. That leaves a still square section at the top that needs to be reduced from the nominal 21/64" square to 1/4" square (and in the center of the circular part).

 

I had two ideas for doing this, one involved using the table saw (with micrometer adjustment) to carefully remove the required material. It would take four passes (once I got the rip fence in the right location), one for each face. This worked like a charm on the first two faces but section being cut lacked lateral support for the final two cuts and the square section looked a bit "off". Here is what this looked like.

IMG_5322.thumb.jpeg.905a5e4b13976ddde3b28195a43e9e9e.jpeg

The part closest to the round section is close to the required 1/4" but it does have some taper and there is considerable "clean-up"at the transition to round. So I decided not to risk any more of my 5/16" round blanks going that route.

 

My second method was to use the disc sander to take the square section down to 1/4". That is not without difficulties (getting the piece against the sander sufficiently evenly to get the same amount removed from the top and bottom of the face among them).  I stopped with the disc sander a few 64s from 1/4" and used sanding sticks to get the rest of the way and try and get the sides to remain (or return) to square (as opposed to rhomboid). Here is what this looked like before the taper to the 5/16" round was done.

IMG_5323.thumb.jpeg.c0752a99000070c52145b456a109b3da.jpeg

I used the sanding sticks to taper from the 5/16" round to the 1/4" per the plans.

 

This worked and I was able to fab four lower masts in a few hours. Here they are without any finish and not yet cut the lengths speced in the plans.

IMG_5334.thumb.jpeg.340885237a49b8d1e6dcfd66c421413b.jpeg

With the lower masts taken care of (more or less) I moved on to the topmasts and booms (including the jib boom).

 

I used the same technique as for the lower masts (but took more pictures). So here is one of the top masts (I have masking tape to mark the area that is to remain square on the jig and what it looks like after being made octagonal (more or less).

IMG_5325.thumb.jpeg.f3680b05d288f6e5a07e93784d7aca2d.jpegIMG_5327.thumb.jpeg.d1ed3cd11a03c363cd10931bd99b5bf7.jpeg

The square end goes in the drill chuck and a certain amount of care is required to get it in straight. Since there is no support (or restraint) at the bottom I found it a good idea to lightly hold on to the bottom when starting the dill press. I used 1200 rpm and 80 grit sandpaper wrapped around the topmast and applied pressure with both thumbs and as many fingers I could bring to bear and slowly moved up and down the topmast. After doing it several times I figured out that it took five transits of the length of the top mast top get to 3/16" round. I then went over the topmast with a piece of 220 sandpaper and called it quits for now. Here are pictures of before and after (although it is hard to tell the difference).

IMG_5328.thumb.jpeg.a7a42c26743796e5a8f6086e3b303b9e.jpegAllIMG_5330.thumb.jpeg.951b891c05efbb3eb85431e655363fae.jpeg

Anyone need a pile of Cherry sawdust?

IMG_5331.thumb.jpeg.b85b66e03e057eb6ec25fbbe5777a9f9.jpeg

 

 

I went through a similar process to generate the five pieces of 3/16" dowel needed for the four booms and the jib boom. I did not attempt to taper any of these while they were chucked in the drill press as I need to carefully study the taper requirements and the provided hardware (for booms and jib boom) to make sure I do not taper more than required to get the hardware to fit. I will probably just do that tapering by hand.

 

Anyway, here are the Cherry spars as they stand at the moment (I made one spare top mast "just in case").1022415109_IMG_53322.thumb.jpeg.2ebefb4f41f050cfa410c550c1ebd015.jpeg

 

 

 

 

 

 


 

 

 

 

Edited by cdrusn89

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I had hoped that changing from basswood to Cherry would provide the needed "darkening" on the spars to replicate the brown paint wash of the prototype.

 

Silly boy. I took a sample of the Cherry and put three coats of Wipe-on-Poly Satin on and still was not as deep a color as I wanted.

 

So I resorted to staining the Cherry wood with Cherry stain (from MinWax).

 

Here are the four lower masts, the bowsprit and the jib boom after staining but before the Wipe-on-Poly treatment.

IMG_5337.jpeg

Edited by cdrusn89

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I took the 3/16" "dowel" that I created and used the four 'bands" that are speced on the drawing to shape the jib boom.

 

The drawing shows that the two outermost bands are the same diameter (1/8") which the inner two are 5/32". That means, essentially no taper between each set of bands. Some what of a challenge especially if you tried to do it in a "power" environment.

 

I chose to do it "manually" and here is what Im came up with. The only issue is the first of the larger bands - the spar is too small where it needs to be - not dramati ally but enough that it will take thick CA to glue it in place.

 

Speaking of the smaller bands - there are a total of 16 provided for the jib boom and gaffs, and each has four "ports" which would support a line for some purpose. None of those holes are actually a hole. In most cases there is a "dimple" where the hole should be but each and every one has to be drilled out to be useful. So 16 X 4 = 48 holes; #75/76 size) that need to be drilled in very small, Britannia metal pieces. Luckily I have a MicroLux drill press which makes this somewhat easier. I cannot imagine the frustration for those who would have to resort to a pin vice to drill these out - hope for a really sharp #76 drill bit - but you will probably be disappointed.

IMG_5336.jpeg

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

Thanks Nic - I hope to keep exposure to sunlight to a minimum. Maybe I should ask for a "blue tint" to the glass in the case since most interior lights these days are LEDs which have considerably more "blue" in them than an incandescent.

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I agree that Cherry darkens with sunlight and age. I also feel it gets more beautiful with age but possibly not on masts...Moab

Completed Builds:

Virginia Armed Sloop...Model Shipways

Ranger...Corel

Louise Steam Launch...Constructo

Hansa Kogge...Dusek

Yankee Hero...BlueJacket

Spray...BlueJacket

26’ Long Boat...Model Shipways

Under Construction:

Emma C. Berry...Model Shipways

 

Link to comment
Share on other sites

The replacement poop decking piece arrived today and I got both sections glued on.

 

Tomorrow the hull gets turned over and glued to the build board and the fun really starts - fairing in the balsa fillers and the bulkheads.

 

I did not try and take the laser char off the bulkheads as this gives a good indication if you have "touched" a particular bulkhead or not.

 

I plan on putting masking tape over the center bulkheads while I fair the filler blocks so I do not inadvertently grind one down while trying to get a filler block fair.

 

Here is the hull with the final piece of decking weighted down while the glue dries.

IMG_5339.jpeg

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

With the decking completed it is time to glue the hull to the build board.

 

As might be expected, less than half of the bulkhead extensions touched the build board when the hull was inverted. I checked each one using an Xacto knife and marked those that were in contact.

IMG_5342.thumb.jpeg.707cce9f3d30a0f14b713b811368104f.jpeg

 

IMG_5343.thumb.jpeg.905d31047449a15c8be0aed5725d6a0c.jpeg

 

 

I put a dollop of glue on each one, inverted the hull, made sure it was straight on the build board and added weights (storage bags filled with BBs).

 

Then went back (alternating sides to avoid putting any twist on the hull) and added shims and glue to all the bulkhead extensions that did not meet the build board.

IMG_5347.thumb.jpeg.db28db83f6fe4f7f48b6fa377acad854.jpeg

So here is the hull glued to the build board. I will let this set overnight to make sure all, the glue is set.

IMG_5346.thumb.jpeg.bf3f96034dc488361ea8652d973767a8.jpeg

 

 

Edited by cdrusn89

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I cheated and started fairing the hull this evening after dinner.

 

3 hours later I think I have the stern in pretty good shape.

 

I will tackle the bow tomorrow after a few "house" chores (like stringing wire from one end of the attic to the other. Best done early in the day in Florida.

 

Here  is how the stern looks and the overall "platform for this work - very stable.

 

IMG_5350.thumb.jpeg.f48532d7598b48e6f15310fc31d878da.jpegIMG_5351.thumb.jpeg.09ff9e20ca03bb77424f0e438a3283af.jpegIMG_5352.thumb.jpeg.0c6712d121bf0e67518ec8e8e4e9e3f1.jpegIMG_5353.thumb.jpeg.fb1bb4516d240e7b3f2b2cd3fdd0004c.jpeg

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I finally got to the bow after a full day of "house" work.

 

It was somewhat faster on the bow as I did not have to contend with the very undefined billet at the transom.

 

So the fairing is done (and a masterful job if I do say so myself). I was able to draw on the experience fairing the Endeavour which had balsa everywhere and the hull was over 4' long so this seemed easy by comparison. On the center six bulkheads I really did little more than take the laser char off.

 

Planking begins tomorrow (after more "house" work).

 

Build board and hull have been returned to the "working" bench

IMG_5354.jpeg

IMG_5355.jpeg

IMG_5356.jpeg

IMG_5358.jpeg

Edited by cdrusn89

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

I tried the laser cut garboard strakes but could not get the forward set to work. I noticed that contrary to the instructions the prototype photos show the pointy end of the forward set about half way between bulkhead 7 and 8 (instructions say at centerline of BH 8). Even moving them forward did not yield a "satisfactory" result IMHO so I chose to just use the 1/4" wide planks for the forward garboard strakes.

Here is what the first two planks at the bow look like.

IMG_5365.thumb.jpeg.5bf26b24250350ace33850857d4921a9.jpegIMG_5366.thumb.jpeg.8e1db2b3add45d68b2849651dc11fd63.jpeg

Attention will have to be paid to how the planks at the bow go together since they will be sanded flat to accept the stem.

 

I also did not follow the instructions and add the sheer strakes before planking. They appear too fragile to survive the planking process, especially across the main deck where they are unsupported except for the bulkhead extensions. My solution was to pin (and then glue) a 1/8" wide plank with the bottom (hull is inverted) even with the subdeck, leaving the edge of the "real" deck open to later have the sheer strake installed after the hull is filled, sanded and ready (more or less) for paint. In the pictures of the prototype I could not see any evidence that the sheer strake was installed prior to the planking.

Here are some pictures of the "sheer plank" pinned and glued on the starboard side. I had to "adjust" some of the bulkhead extension to permit a smooth flow of the sheer plank across the bulkhead extensions.

 

 

 

 

 

IMG_5364.jpeg

IMG_5363.jpeg

IMG_5361.jpeg

IMG_5362.jpeg

IMG_5360.jpeg

Thanks,

 

Gary

 

Current Build -  HMS Sphinx 1775

 

Prior Builds:  HMS Winchelsea

                       USF Confederacy

                     

 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...