Jump to content

USF Essex by mtbediz - FINISHED - 1:50


Recommended Posts

  • 2 months later...

Great looking model, Mustafa.

🌻

STAY SAFE

 

A model shipwright and an amateur historian are heads & tails of the same coin

current builds:

HMS Berwick 1775, 1/192 scratchbuild; a Slade 74 in the Navy Board style

Mediator sloop, 1/48 - an 18th century transport scratchbuild 

French longboat - CAF - 1/48, on hold

Link to comment
Share on other sites

  • 3 weeks later...

Rigging has begun. The arrangement and run of the lines is being taken from the rigging diagrams in AOTS Essex.
I've completed the burton pendants, shrouds and stay on the lower mizzen mast. I have served the lines with a hommade serving machine.

1.jpg

2.jpg

3.jpg

4.jpg

5.jpg

6.jpg

7.jpg

8.jpg

9.jpg

10.jpg

11.jpg

12.jpg

Link to comment
Share on other sites

  • 3 weeks later...

Amazing work  - Simply Superb.

 

OC.

Current builds  


28mm  Battle of Waterloo   attack on La Haye Saint   Diorama.

1/700  HMS Hood   Flyhawk   with  PE, Resin  and Wood Decking.

 

 

 

Completed works.

 

Dragon 1/700 HMS Edinburgh type 42 batch 3 Destroyer plastic.

HMS Warspite Academy 1/350 plastic kit and wem parts.

HMS Trafalgar Airfix 1/350 submarine  plastic.

Black Pearl  1/72  Revell   with  pirate crew.

Revell  1/48  Mosquito  B IV

Eduard  1/48  Spitfire IX

ICM    1/48   Seafire Mk.III   Special Conversion

1/48  Kinetic  Sea Harrier  FRS1

Link to comment
Share on other sites

On 10/29/2021 at 1:07 PM, rafine said:

Wonderful work Mustafa. Beautiful.

 

Bob

Thank you very much Bob. 

Thanks very much friends for the nice comments and likes.
I added the crow's feet to the tops.

23.jpg

24.jpg

25.jpg

26.jpg

27.jpg

Edited by mtbediz
Link to comment
Share on other sites

  • 3 weeks later...
  • 3 weeks later...

Happy christmas friends. I am sharing what I did on Essex since my last post. Not too much proceeding because the rope, blocks etc. production continues alongside the model.

17.jpg

18.jpg

19.jpg

20.jpg

21.jpg

22.jpg

23.jpg

24.jpg

26.jpg

16.jpg

Edited by mtbediz
Link to comment
Share on other sites

  • 2 weeks later...

Thanks so much for the likes my friends.

The main lower yard has now been mounted and I've begun the running rigging lines. The jeers, sling and truss pendant have been completed.

34.jpg

35.jpg

37.jpg

38.jpg

40.jpg

41.jpg

42.jpg

43.jpg

44.jpg

Edited by mtbediz
Link to comment
Share on other sites

  • 3 weeks later...
  • 4 weeks later...
Link to comment
Share on other sites

  • 2 weeks later...
Link to comment
Share on other sites

  • 2 weeks later...
  • 3 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...