Hey guys, any tip or advice on how to drop/hang symmetrically the footropes and yards ropes in general...?

Especially for the spritsail yard, the relative procedure is a real hedache...

Thanks

IMG_1888.JPG

Share this post


Link to post
Share on other sites
9 minutes ago, Davemc said:

i use counter weights

 

Hi Davemc and thank you.

Did you use any watered carpenter glue or floor varnish as a hardener for the footropes?

Cheers

Share this post


Link to post
Share on other sites

One thing I did Stergios (I used the supplied CC rope), was to ensure that it had been fully straightened to remove any kinks ( simply running through fingers or leaving a length suspended from a door frame with a clamp on one end as a small weight).  It should then hang a lot more naturally, and if necessary then a little watered down PVA can help as well once on place.

Share this post


Link to post
Share on other sites

Davemc, jason, thank you so much.

I've prepared two rope-specimen (using watered pva and floor varnish respectively).

I'll inform you about the final results...

Share this post


Link to post
Share on other sites
20 hours ago, drtrap said:

Davemc, jason, thank you so much.

I've prepared two rope-specimen (using watered pva and floor varnish respectively).

I'll inform you about the final results...

Well, i think that the floor varnish is the best option to stabilize ropes and footropes and give a natural sense of the whole creature.

Removing the pins-counterweights from the pva hardened rope leaves a rope sticky spot at the place of each pin which is totally undesirable....

Share this post


Link to post
Share on other sites

These days the yards dpt is working hard to achieve the best possible balance and footropes-symmetry.

Stay in touch. :)

Share this post


Link to post
Share on other sites

Hi to everyone.

After the final trimming of the yards I'm showing you the latest picture of the ship and this way the stage of the current construction. Sorry for the anti-dust cover :)

Now, I really need your recommendations on "how to proceed, next":

working on the standing rigging ?, working upwards (and outwards)?, leaving the vulnerable bowsprit and its rigging for later? Doing something else?

 

Thank you in advance.

 

Stergios

IMG_1912.JPG

Share this post


Link to post
Share on other sites
On 15/6/2018 at 8:41 PM, Davemc said:

I worked from the back having first put in the stays

Hi Davemc and thank you.

To put all the stays correctly you have to attach the bowsprit mast in place, right?

Share this post


Link to post
Share on other sites
On 17/6/2018 at 5:59 AM, Beef Wellington said:

Bowsprit standing rigging does not interfere with the other masts - I also started from the back.

Hi Jason 

To my knowledge, to be able to put and finish the stays (main and preventer) I have to fix the bowsprit dowel in advance.

Am I wrong somewhere?

Share this post


Link to post
Share on other sites

Hi Stergios - my apologies, I used the wrong words in a hurry.  The bowsprit does need to be fitted as you describe for the main, preventer stays to be completed.  There is also a fair amount of standing rigging on the bowsprit that I would suggest doing before you do that.  I think I actually did the bowsprit standing rigging before actually starting the mast standing rigging working from the stern.

 

What I meant to say above was that its not really necessary to attach the jib boom at this point - makes manipulating the model much easier as the jib boom seems to be an accident waiting to happen.  Good Luck!

 

 

Edited by Beef Wellington

Share this post


Link to post
Share on other sites
On 18/6/2018 at 3:27 PM, Beef Wellington said:

Hi Stergios - my apologies, I used the wrong words in a hurry.  The bowsprit does need to be fitted as you describe for the main, preventer stays to be completed.  There is also a fair amount of standing rigging on the bowsprit that I would suggest doing before you do that.  I think I actually did the bowsprit standing rigging before actually starting the mast standing rigging working from the stern.

 

What I meant to say above was that its not really necessary to attach the jib boom at this point - makes manipulating the model much easier as the jib boom seems to be an accident waiting to happen.  Good Luck!

 

 

Hi Jason and thank you again.

I think I've finished with the standing rigging of the bowsprit. The rest of it's rigging, needs to have attached the bowsprit to the ship.

Pic to follow...

 

So (excluding the jib boom, I strongly agree with you), what's in your opinion the very first point to start with working the rigging form the stern?

Cheers.

Stergios

Share this post


Link to post
Share on other sites

Everytime I'm seeing the plan, I feel more unsecure about those "H" structures, named as "3 mm single blocks" in the plan...

It is possible to be in fact 3 mm deadeyes?

I tried to find a reference using Petersson rigging period ship models, but no chance....

What do you think?

Thank you

IMG_1944.JPG

Edited by drtrap

Share this post


Link to post
Share on other sites
6 minutes ago, Davemc said:

the attached should answer your question

IMG_0434.JPG

Wow, so they are blocks indeed, but single (?) ..!!

I thought it was wrong the whole plan, I thought "H" was 3mm deadeye or 3mm double block....

Thank you so much anyway Davemc!

 

Stergios

Share this post


Link to post
Share on other sites

Now ready to place the main mast back stays and those (spotted in red) ropes structures (i'm not sure about their terminology).

A question in brief: I've applied serving at the upper 1/5 of the shrouds of the main mast, those days.

Should I continue the some way (serving) of those rope structures, too?

Thank you

 

4 - Αντίγραφο.JPG

Share this post


Link to post
Share on other sites
On 8/5/2018 at 9:06 PM, Davemc said:

Sorry beyond my knowledge and skill level

 

Dave

Thank you Dave.

 

I still can't understand their role and orientation.

Am I dealing with those so-called "main topmast halliards" (L. Petersson page 39)?

Studying the Snake plans I'm not seeing any connection with the yards....

Any advise from someone senior modeller?

Thank you.

Share this post


Link to post
Share on other sites

Hi drtrap.

 

As GrandpaPhil says these are two of the Topmast backstays they are called running breast backstays according to Lees. 

 

Dave :dancetl6:

 

 

Share this post


Link to post
Share on other sites

Thank you all for your replies.

It was my fault to show you a wrong initial picture...

 

I'm asking you about the threads noted in the circle (see pic below) ......

Those are different ropes, A 1mm and B 0,75 mm and I dont think those are the topmast backstays...

Apart for the issue of the serving I'm trying to realize their orientation and final (could be a yard ??) attachment .

Thank you again.

4 - Αντίγραφο.JPG

Edited by drtrap

Share this post


Link to post
Share on other sites

Hi drtrap,

They are the Topmast backstays,respectively from fore to aft.

The first is the Shifting Backstay.

The second is the Breast Backstay.

The third is the Standing Backstay which is set up with deadeyes.

I have checked Steels' dimensions of Standing and Running rigging,he quotes for a 6th rate ship

such as HMS Snake :-

4 1/2" rope for the Standing Topmast Backstay and the Shifting Backstay and 3" rope for the Breast Backstay

hence the two different sizes quoted on your plan for A and B. They have nothing to do with yards or running rigging.

I have just noticed that there is an almost identical arrangement on the Foremast except the Breast Backstay is further aft.

I hope this helps with your problem.

 

Kind regards,

 

Dave :dancetl6: 

Edited by davyboy

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Recently Browsing   0 members

    No registered users viewing this page.

About us

Modelshipworld - Advancing Ship Modeling through Research

SSL Secured

Your security is important for us so this Website is SSL-Secured

NRG Mailing Address

Nautical Research Guild
237 South Lincoln Street
Westmont IL, 60559-1917

About the NRG

If you enjoy building ship models that are historically accurate as well as beautiful, then The Nautical Research Guild (NRG) is just right for you.

The Guild is a non-profit educational organization whose mission is to “Advance Ship Modeling Through Research”. We provide support to our members in their efforts to raise the quality of their model ships.

The Nautical Research Guild has published our world-renowned quarterly magazine, The Nautical Research Journal, since 1955. The pages of the Journal are full of articles by accomplished ship modelers who show you how they create those exquisite details on their models, and by maritime historians who show you the correct details to build. The Journal is available in both print and digital editions. Go to the NRG web site (www.thenrg.org) to download a complimentary digital copy of the Journal. The NRG also publishes plan sets, books and compilations of back issues of the Journal and the former Ships in Scale and Model Ship Builder magazines.

Our Emblem

Modelshipworld - Advancing Ship Modeling through Research
×
×
  • Create New...