Jump to content
drtrap

HMS Snake by drtrap - Caldercraft

Recommended Posts

The wheel in place, finally.

A question still in debate: the rope for the wheel... Should I use 0,1 or 0,25 line for the rigging?

And something for the front platform: is it a major fault to leave it's gap (for the bowsprit) rectangular than to shape it in a semicircular fashion, like you did ?

I used 0.25mm rope, I also recommend winding the rope round the wheel and sealing with watered pva before anything is fixed in position.

 

Cheers,

 

Pete

Share this post


Link to post
Share on other sites

I used 0.25mm rope, I also recommend winding the rope round the wheel and sealing with watered pva before anything is fixed in position.

 

Cheers,

 

Pete

Thanks Pete, I'm thinking to start from the tiller the rigging, going bilaterally to the eyelets/blocks and finishing at the wheel....

Edited by Stergios

Share this post


Link to post
Share on other sites

Thinking of use carpenter;s glue to cover those 1 mm holes before the final painting instead of wood filler...

What;s your suggestion?

Thanks

post-944-0-13275100-1380223055_thumb.jpg

Share this post


Link to post
Share on other sites

Can only speak for my experience, but I'd stick with woodfiller, I use the fast drying stuff which is very easy to use.  Glue isn't really made to fill gaps in the way you need it to, so you'd probably still have indentations when its dry that need to be taken care of.

Share this post


Link to post
Share on other sites

Can only speak for my experience, but I'd stick with woodfiller, I use the fast drying stuff which is very easy to use.  Glue isn't really made to fill gaps in the way you need it to, so you'd probably still have indentations when its dry that need to be taken care of.

Thank you Jason.

Any recommendation on the type of fast drying stuff?

You know, local products are'nt the same and personal experience is highly required..!

Share this post


Link to post
Share on other sites

Thinking of use carpenter;s glue to cover those 1 mm holes before the final painting instead of wood filler...

What;s your suggestion?

Thanks

Yes wood filler would allow you to blend it into the wood better and make the hole unnoticeable, why did you want to use glue as a filler?

 

Pete

Share this post


Link to post
Share on other sites

Yes wood filler would allow you to blend it into the wood better and make the hole unnoticeable, why did you want to use glue as a filler?

 

Pete

I was thinking about glue, only as a coverage of the holes, Pete...

Share this post


Link to post
Share on other sites

Two planks (1,5 mm each) help me to place and drill the capping rails in the middle border (between the inner and outer bulwarks...

I try to do my best despite the fact that the capping rails and bulwarks respectively are'nt cut in relative harmony...

Out of plan for another time...

post-944-0-13894400-1380318312_thumb.jpg

Edited by Stergios

Share this post


Link to post
Share on other sites

Those shearing lateral forces of the bad-shaped capping rail especially at the stern is a huge headache for me.

I think that using beam or heat is a useless option to decrease the unwanted curvature at the rear edge....

I hope to finally have a nice result with those 1 mm wires....

post-944-0-44393000-1380319149_thumb.jpg

Edited by Stergios

Share this post


Link to post
Share on other sites

Trying to place on the right (middle) point of the bulwark  the posterior edge of the capping rail. 

Its pre-shaped posterior arch and bending can't help me at all.

Thinking to leave it as it is, as a so-called lateral "offset", on that place.

Hope to not create additional troubles following next phases...

post-944-0-81860000-1380463796_thumb.jpg

Share this post


Link to post
Share on other sites

As Jason said, don't worry about the capping rail exact positioning. They were a pain to do and as long as they look sensible and are pinned to the bulwarks then all should be well.

Share this post


Link to post
Share on other sites

Hi to everyone.

Capping rail (lateral and posterior) dry-fitting is in progress, I'm concerned with the shape of the aft capping rail, as it's a bit curve and not so suitable to the upper rim of the (more straight) stern fascia...

Did you re-shape it anyway or just left as it was and glued in place?

(I saw Jason has made his own aft capping rail, propably for the above mentioned reason..).

Thanks.

Share this post


Link to post
Share on other sites

Hello to everyone, I'm back again.

Jim, Pete,  I still wonder, did you use and glue in place the (somehow curved) standard posterior capping rail provided by the kit, or did you place another not so curved 2x2 wallnut plank?

I'm about to fix it, but because of its curved shapeI can't place it "equally spaced" on the stern fascia.

Thanks a lot

post-944-0-26252500-1381494277_thumb.jpg

Edited by Stergios

Share this post


Link to post
Share on other sites

Lateral bulwark capping rails glued in place.

I've left unglued only the anterior and posterior thirds just to have the option to manipulate the edges later to obtain a equally spaced placement on the bulwark's rim and a better symmetrical adaption on the anterior and posterior platforms respectively.

post-944-0-04876800-1381494813_thumb.jpg

post-944-0-75535800-1381494827_thumb.jpg

post-944-0-63585100-1381494848_thumb.jpg

Share this post


Link to post
Share on other sites

Great progress, looking very good.  I love the colour of the wood in the second photo.

 

I forgot to comment on your previous post, you are correct that I made the stern capping rail because the curvature wasn't quite right.  It was as much for practice as anything, and I could have used the pre-cut piece and it would probably have looked OK.  It easy to judge the curve by putting some card overhanging the stern and draw the profile with a pencil, that gives you the template to make your own or compare to the supplied piece and see if its close enough for you.

Share this post


Link to post
Share on other sites

Great progress, looking very good.  I love the colour of the wood in the second photo.

 

I forgot to comment on your previous post, you are correct that I made the stern capping rail because the curvature wasn't quite right.  It was as much for practice as anything, and I could have used the pre-cut piece and it would probably have looked OK.  It easy to judge the curve by putting some card overhanging the stern and draw the profile with a pencil, that gives you the template to make your own or compare to the supplied piece and see if its close enough for you.

 

Thank you Jason, finally I did my own (custom-made) posterior capping rail.

post-944-0-24408700-1381684564_thumb.jpg

post-944-0-16912700-1381684608_thumb.jpg

Edited by Stergios

Share this post


Link to post
Share on other sites

Building like a turtle....

The slots of the capping rails (that unfortynatelly I've permanently glued) are undersized comparing to the timberheads. :(

Should I use my dremel for a bit of enlargement?

post-944-0-43490800-1382440542_thumb.jpg

post-944-0-70439900-1382440557_thumb.jpg

Edited by Stergios

Share this post


Link to post
Share on other sites

Hi Stergios, don't think you need to do anything drastic at all. They are a tight fit. I'd suggest just sanding down the timberhead pieces slightly, and then pushing them into place with a small amount of force (wiggling back and forth). The wood is pretty soft and I found it does respond to this well. The other benefit, you'll have a nice solid fit.

Share this post


Link to post
Share on other sites

Hi Stergios, don't think you need to do anything drastic at all. They are a tight fit. I'd suggest just sanding down the timberhead pieces slightly, and then pushing them into place with a small amount of force (wiggling back and forth). The wood is pretty soft and I found it does respond to this well. The other benefit, you'll have a nice solid fit.

This!

Share this post


Link to post
Share on other sites

Hi Stergios, don't think you need to do anything drastic at all. They are a tight fit. I'd suggest just sanding down the timberhead pieces slightly, and then pushing them into place with a small amount of force (wiggling back and forth). The wood is pretty soft and I found it does respond to this well. The other benefit, you'll have a nice solid fit.

Thank you again, Jason!

By the way, from your experience what;s the best next step you advise me to follow: placing the pinrails etc or placing, fixing and rigging the cannons & carronades? 

Cheers!

Share this post


Link to post
Share on other sites

You definitely want to do the pinrails on the bulkheads before doing the cannons. Leaving the ones in the center off the deck until cannons are complete is fine as you ill have more room and are less likely to accidentally knock and break something.

Share this post


Link to post
Share on other sites

Hi Guys,

 

Just a comment. Why don't you make up the pin rails first and mark where they belong on the bulworks but do not glue them in place. Next rig your cannons and then glue the pin rails in place. The extra rigging room will come in handy.

 

Mort

Share this post


Link to post
Share on other sites

Hi Guys,

 

Just a comment. Why don't you make up the pin rails first and mark where they belong on the bulworks but do not glue them in place. Next rig your cannons and then glue the pin rails in place. The extra rigging room will come in handy.

 

Mort

Hi Mort, this was my point of concern.

I think that Jason (so many steps ahead) knows better... 

Share this post


Link to post
Share on other sites

My personal opinion only - didn't find that the bulwark pinrails interfered at all in the cannon rigging, but do what you think you' be comfortable with.    I'd definitely suggest fixing the bulwark cleats (part 165) before the cannons and this may also play into where you position the pinrails.  This is one of those sneaky items that the instructions don't call out and you need to look at plan '3 of 7' to find them.  Confusingly there are 6 bulwark cleats identified (for lines 55, 5, 50) but only 4 supplied.  If you look at plan '4 of 7', you can see that line 5 does not in fact need to terminate at a bulwark cleat I ommitted that one, installing the bulwark cleats at locations indicated for lines 55 & 50 on plan '3 of 7'.  This is less than clear, and fingers crossed it is correct...hope I haven't caused more confusion.

Edited by Beef Wellington

Share this post


Link to post
Share on other sites

My personal opinion only - didn't find that the bulwark pinrails interfered at all in the cannon rigging, but do what you think you' be comfortable with.    I'd definitely suggest fixing the bulwark cleats (part 165) before the cannons and this may also play into where you position the pinrails.  This is one of those sneaky items that the instructions don't call out and you need to look at plan '3 of 7' to find them.  Confusingly there are 6 bulwark cleats identified (for lines 55, 5, 50) but only 4 supplied.  If you look at plan '4 of 7', you can see that line 5 does not in fact need to terminate at a bulwark cleat I ommitted that one, installing the bulwark cleats at locations indicated for lines 55 & 50 on plan '3 of 7'.  This is less than clear, and fingers crossed it is correct...hope I haven't caused more confusion.

I can't locate parts No 165 (4 pieces, casting) on my "3 of 7" plan...

Could you please upload any relative photo for understanding better?

Thanks

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Recently Browsing   0 members

    No registered users viewing this page.

About us

Modelshipworld - Advancing Ship Modeling through Research

SSL Secured

Your security is important for us so this Website is SSL-Secured

NRG Mailing Address

Nautical Research Guild
237 South Lincoln Street
Westmont IL, 60559-1917

About the NRG

If you enjoy building ship models that are historically accurate as well as beautiful, then The Nautical Research Guild (NRG) is just right for you.

The Guild is a non-profit educational organization whose mission is to “Advance Ship Modeling Through Research”. We provide support to our members in their efforts to raise the quality of their model ships.

The Nautical Research Guild has published our world-renowned quarterly magazine, The Nautical Research Journal, since 1955. The pages of the Journal are full of articles by accomplished ship modelers who show you how they create those exquisite details on their models, and by maritime historians who show you the correct details to build. The Journal is available in both print and digital editions. Go to the NRG web site (www.thenrg.org) to download a complimentary digital copy of the Journal. The NRG also publishes plan sets, books and compilations of back issues of the Journal and the former Ships in Scale and Model Ship Builder magazines.

Our Emblem

Modelshipworld - Advancing Ship Modeling through Research
×
×
  • Create New...