HMS Vulture Build Log Resurrection
Following the Crash of MSW in February 2013 I’ve attempted to re-create as much of my former Build log as I can. The following is a very truncated version of the original. It doesn’t contain any of the comments posted by others, as they were unrecoverable. My apologies for that.
I've also left out the MISTAKES I made during the construction in the "Resurrection" section. Some of them can be found in this Topic : How I Fix Boo-Bo
Lower Deck Planking
The first plank for the lower deck is the King Plank which runs down the centre line. It is 12" wide and 3" thick and sits 1" proud of the rest of the planking. It is chamfered on both sides to match the adjoining planks. "Caulking" is done on one edge and butt join with an Archival Ink pen :
The remaining planks are nominally 8" wide and 2" thick. Work continues outward :
The planks narrow toward the bow and stern between the Bindi