Hi all,   Well finally been able to get some things done that tangibly move things forward.  The area around the mainmast is one of the more interesting and complex areas to get situated.  All of these items were scratchbuilt, which of course resulted in the usual re-does as the geometry is critical to get right as the pump axel and cranks need to align with minimal tolerances.   Capstan and aft coamings now glued into position, the deck beam needs to be modified to allow the