Jump to content

ppddry

Members
  • Posts

    42
  • Joined

  • Last visited

Reputation Activity

  1. Like
    ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D   
    2011-09-19: Putting all the parts together.




     
    Midship section




  2. Like
    ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D   
    2011-09-18: The planking in the hold was also completed.



  3. Like
    ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D   
    2011-09-18: By this date, the lower deck was completed.










     
  4. Like
    ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D   
    2011-05-17: internal planking and external planking


     
    2011-05-20: The space between the internal planking and the external planking was filled to form the shape of the frames.

     
    2011-05-21: the shape of the keel assembly


     
    2011-05-23: cutting the frames

     
    2011-06-12: All frames were completed!


  5. Like
    ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D   
    2011-02-26: details of the chains and deadeyes

     
    2011-02-28: HALF-BREADTH PLAN added - keel assembly, main half breadth, toptimber half breadth, top side half breadth, half breadth of the rising line, projections of the diagonals

     
    2011-03-02: BODY PLAN added. A set of lines for the inner surface of the frames are also drawn but not shown in this figure.

     
    2011-03-04: water lines, cant frames, fashion piece, hawse pieces, transoms, inner post, apron, keelson, first thick limber strake next the limbers

     
    2011-03-05: deadwood knee, disposition of the frames

     
    2011-03-08: disposition of the square frames

     
    The 3D build began from this point!
  6. Like
    ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D   
    Let's get started!
     
    2011-02-09: keel, false keel, perpendiculars, cutting down line, lower deck, upper deck, stem post, stern post, stern counters, stern timbers

     
    2011-02-10: toptimber line, top side lines, water lines, forecastle, quarter deck

     
    2011-02-12: lower breadth line, upper breadth line, main wale, sheer rail, waste rail, drift rail, fife rail

     
    2011-02-15: gun ports

     
    2011-02-17: channels, deadeyes

     
    2011-02-18: planking above the load water line, platforms, knee of the head, ladder, fenders, chestree

     
    2011-02-19: lower cheek, upper cheek

     
    2011-02-20: head rails, head timbers, cathead

     
    2011-02-21: taffrail, quarter gallery

     
    2011-02-22: rudder

     
    2011-02-24: gun port lids, sweep ports, scuppers, hammock cranes, swivel guns. The taffrail and the quarter gallery were modified.

×
×
  • Create New...