Jump to content

Apxeos

Members
  • Posts

    76
  • Joined

  • Last visited

Everything posted by Apxeos

  1. All service comes from the upper deck of the forecastle extended further into the bow. Thus, the nose can be pulled up high enough.
  2. Set the second side, glued everything to the main deck. Deck sheathing and waterways on a poop deck.
  3. Installed the upper deck and deck flooring, put additional top timber (upper futtock) and sheathing of the aft superstructure.
  4. I will continue. Set capstan, pumps, gun carriage, beams and beam bracket supporting them. At this stage, the main task is to verify the collectability of the model body and the correctness of the solutions in principle. Therefore, I do not plan to finish small parts on the lower deck now, I will not paint the internal volumes of the hull, etc.
  5. The term carrack is too fuzzy. It can be a vessel with transom and semicircular stern. A single-masted vessel may also be designated as a carrack.
  6. Not everything is so simple with the term galleon. I found the table of the Portuguese author Joao da Gama Pimentel Barata, from the article The Portuguese galleon (1519-1625) interesting.
×
×
  • Create New...