
Geam
-
Posts
67 -
Joined
-
Last visited
Single Status Update
-
I've been planning building sequences and doing some small jobs on the Fisher but I can't say there's been much noticeable progress. I've been 'hovering' around the fact that I have to get going with gloss paint on the coach roof and wheelhouse roof sections. Made the grab-rails and 22 small stand-offs/bases. The grab-rails will be glued onto the bases after the coach rooves are glossed white. The requirement for removeable top sections is causing some head-scratching as to where to cut for the joins to be least noticeable, but generally all joins/cuts will have to be abeam the main mast P&S.
The photo shows the grab-rails just loosely placed on top of the bases. The wheelhouse FWD window frame is also just 'placed' -not glazed yet nor faired/glued in place
George