
Geam
-
Posts
67 -
Joined
-
Last visited
Single Status Update
-
Progressing slowly with the different components of the interior. Now rounding the last 'corner'. Not too happy with the home-made hinges on the stbd locker door. Only one or two of the locker doors actually need working hinges. I have found some miniature brass doll's-house hinges in the UK -which are now in the post to Norway.
The workshop area, aft to port, and the adjacent 'heads' are also in progress. The opening for the compass-viewing porthole in the steering well has been drilled.
George