Jump to content

tadheus

Members
  • Posts

    663
  • Joined

  • Last visited

Everything posted by tadheus

  1. Continuation. I made a stencil of the bowsprit. Will be used to match parts. Part of it is worked by hand, without the use of mechanical tools. The beginning of the relationship is available at this address: http://5500.forumact...ndre-1-24#66516 Regards, Paul
  2. Continuation. I made a new deck aft deck. Previous have a large radius of curvature. I used the template to the main deck beams. The beginning of the relationship is available at this address: http://5500.forumact...ndre-1-24#66516 Regards, Paul
  3. Continuation. The beginning of the relationship is available at this address: http://5500.forumact...ndre-1-24#66516 Regards, Paul
  4. Continuation. Adhesives deck design elements. The beginning of the relationship is available at this address: http://5500.forumact...ndre-1-24#66516 Regards, Paul
  5. Continuation. The beginning of the relationship is available at this address: http://5500.forumact...ndre-1-24#66516 Regards, Paul
  6. Continuation. Came more items. Visible on the deck connected components without glue. Numbered will wait in a queue for permanent installation. The beginning of the relationship is available at this address: http://5500.forumact...ndre-1-24#66516 Regards, Paul
  7. Continuation. Slowly coming new parts. Regards, Paul
  8. Continuation. The beginning of the relationship is available at this address: http://5500.forumact...ndre-1-24#66516 Regards, Paul
  9. Mtaylor, mirek, juzek, thanks to you. Regards, Paul
  10. Continuation. I fit components of the deck. Regards, Paul
  11. Continuation. I started stacking the outer skin. The beginning of the relationship is available at this address: http://5500.forumact...ndre-1-24#66516 Regards, Paul
  12. The beginning of the relationship is available at this address: http://5500.forumactif.org/t2303-la-salamandre-1-24#66516
  13. Continuation. Adapts elements of the design of the deck.
  14. Continuation. I hammered and blackened 98 nails in internal frames.
  15. Thanks Jeronimo. Continuation. I did the door to the storage compartments under the deck. Not finished.
  16. Continuation. Blackened all nails inside the hull. I prepared the material for the further stages of work. Wood is a pear.
  17. Continuation. Blackened iron nails in the fore part of the model.
  18. Jeronimo, thank you for your interest in the subject. But I am not convinced, and the analysis of other plans will stay with type 1. The plans la Salamandre shown so. Do not explain, however, how these boards were connected. I started assembly of beams.
  19. The plans, which have, type 2 has: The 74 gun ship L'Ambiteux Bon Home Richard La Renommee Le Francois Le Boulongne La Salamandre type 1 has: Le Gros Ventre Le Commerce de Marseille Le Fleuron L' Artesien
×
×
  • Create New...