Jump to content

Recommended Posts

Posted (edited)

Hello everyone!

 

The last four frames have now been completed. The wedges between the keel and counter keel were milled and installed one after the other. Additionally, the filler pieces were inserted approximately at the end of the bottom timber and in the middle of both the bottom timber and the keel. This layout is also found in Gerard's A'rtésien. Thanks again for your help with this. The individual filler pieces between the frames were installed as shown in the plan, and additional ones were placed above each frame for reinforcement.

 

Since the spacing between the frames is only 2mm, I deliberately omitted showing the bolts. Please forgive me :)

 

IMG_20260120_102446_copy_1224x691.jpg.05fdd7b2706dd3025acb6b2deec72f07.jpg

 

IMG_20260121_184218_copy_1305x736.jpg.6242ef85b6d0396e2d0bd1f0e305437d.jpg

 

IMG_20260121_184231_copy_979x552.jpg.4b88f9361182c451029792ab971cec9c.jpg

 

IMG_20260121_184250_copy_1142x561.jpg.800413a49e797fbe36b7bbe49ca92b0f.jpg

 

IMG_20260121_184302_copy_1142x644.jpg.b22c5b343af7731b7d6bbaff0b1d7db0.jpg

 

IMG_20260121_184342_copy_1224x690.jpg.ca58293fd6504e6ffaf8ec465efe01ff.jpg

 

IMG_20260121_184410_copy_1142x644.jpg.e1f7568d66fa14fa0fb2eb9451dcdd33.jpg

 

IMG_20260121_184357_copy_1305x736.jpg.64e7d2a1ff67523468199015129dce2b.jpg

 

Regards 

Andreas

Edited by Cpt.Barbossa

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...