ppddry
-
Posts
42 -
Joined
-
Last visited
Reputation Activity
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-06-15: main wale
2011-06-15: shape of the external planking
The frames can be seen by setting the external planking transparent!
2011-06-16: Cutting the bottom planking into individual planks.
2011-06-17: Finished cutting the bottom planking.
2011-06-18: The main wale was also cut into individual pieces.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-02-26: details of the chains and deadeyes
2011-02-28: HALF-BREADTH PLAN added - keel assembly, main half breadth, toptimber half breadth, top side half breadth, half breadth of the rising line, projections of the diagonals
2011-03-02: BODY PLAN added. A set of lines for the inner surface of the frames are also drawn but not shown in this figure.
2011-03-04: water lines, cant frames, fashion piece, hawse pieces, transoms, inner post, apron, keelson, first thick limber strake next the limbers
2011-03-05: deadwood knee, disposition of the frames
2011-03-08: disposition of the square frames
The 3D build began from this point!
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
Gaetan, this is for you.
Inside the great cabin, looking aft.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2013-03-10&11: waist rails, sheer rails, drift rails, fife rails, plank sheers, cutting the external planking above the main wale into individual pieces
This is the progress up to now. Enjoy!
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-02-29 to 05-31: working on the stern
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-02-20 to 25: working on the steering gear
2012-02-25: changed the color scheme
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-12-19: upper deck ledges, riding bitts, gratings, capstan partner
2011-12-24: main jeer bitts, main topsail sheet bitts, lower deck pillars, pump well
2011-12-24&25: the whole assembly
2012-01-05: lower deck cabins
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-06-05: assembling the stern to the hull, adding the rudder chains
2013-02-11: ladders connecting the lower deck to the upper deck, chain pump winches, iron pillars on the upper deck, shot racks on the upper deck
2013-03-04 to 05: forecastle planking and fittings, quarter deck planking and fittings, catheads, stove, capstan, forecastle planksheer
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-09-18: By this date, the lower deck was completed.
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
2012-06-05: assembling the stern to the hull, adding the rudder chains
2013-02-11: ladders connecting the lower deck to the upper deck, chain pump winches, iron pillars on the upper deck, shot racks on the upper deck
2013-03-04 to 05: forecastle planking and fittings, quarter deck planking and fittings, catheads, stove, capstan, forecastle planksheer
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
2012-02-29 to 05-31: working on the stern
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
2012-02-20 to 25: working on the steering gear
2012-02-25: changed the color scheme
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-12-19: upper deck ledges, riding bitts, gratings, capstan partner
2011-12-24: main jeer bitts, main topsail sheet bitts, lower deck pillars, pump well
2011-12-24&25: the whole assembly
2012-01-05: lower deck cabins
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-12-09: internal planking of the Lower Deck, elm tree pumps, chain pumps, upper deck beams, carlings, partners, and upper deck hook
2011-12-09: coamings of the upper deck hatches
2011-12-09: assembling all parts
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-09-18: The platforms in the hold.
Putting the keel assembly, the planking in the hold, and the platforms together.
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
2013-03-10&11: waist rails, sheer rails, drift rails, fife rails, plank sheers, cutting the external planking above the main wale into individual pieces
This is the progress up to now. Enjoy!
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2012-06-05: assembling the stern to the hull, adding the rudder chains
2013-02-11: ladders connecting the lower deck to the upper deck, chain pump winches, iron pillars on the upper deck, shot racks on the upper deck
2013-03-04 to 05: forecastle planking and fittings, quarter deck planking and fittings, catheads, stove, capstan, forecastle planksheer
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2012-02-29 to 05-31: working on the stern
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2012-02-20 to 25: working on the steering gear
2012-02-25: changed the color scheme
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-01-11: upper deck planking
2012-01-14: internal planking above the upper deck
2012-01-15: forecastle beams, quarterdeck beams, and knees
2012-01-17: the whole assembly
-
ppddry got a reaction from PeteB in HMS Pandora 1779 in 3D
2011-12-19: upper deck ledges, riding bitts, gratings, capstan partner
2011-12-24: main jeer bitts, main topsail sheet bitts, lower deck pillars, pump well
2011-12-24&25: the whole assembly
2012-01-05: lower deck cabins
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
Gaetan, this is for you.
Inside the great cabin, looking aft.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2013-03-18 Upper deck bulkheads finished
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-02-26: details of the chains and deadeyes
2011-02-28: HALF-BREADTH PLAN added - keel assembly, main half breadth, toptimber half breadth, top side half breadth, half breadth of the rising line, projections of the diagonals
2011-03-02: BODY PLAN added. A set of lines for the inner surface of the frames are also drawn but not shown in this figure.
2011-03-04: water lines, cant frames, fashion piece, hawse pieces, transoms, inner post, apron, keelson, first thick limber strake next the limbers
2011-03-05: deadwood knee, disposition of the frames
2011-03-08: disposition of the square frames
The 3D build began from this point!
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2013-03-10&11: waist rails, sheer rails, drift rails, fife rails, plank sheers, cutting the external planking above the main wale into individual pieces
This is the progress up to now. Enjoy!