ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-09-18: The platforms in the hold.
Putting the keel assembly, the planking in the hold, and the platforms together.
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-09-18: The planking in the hold was also completed.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-09-18: By this date, the lower deck was completed.
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-06-15: main wale
2011-06-15: shape of the external planking
The frames can be seen by setting the external planking transparent!
2011-06-16: Cutting the bottom planking into individual planks.
2011-06-17: Finished cutting the bottom planking.
2011-06-18: The main wale was also cut into individual pieces.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
Hello,
This is my 3D build log for HMS Pandora. The build was started in February 2011, and it is still in progress.
The primary references include the Anatomy of the Ship: The 24-gun Frigate Pandora (the plans), The Shipbuilder's Repository (it contains the dimensions and the scantlings of HMS Porcupine, which is of the same class as the Pandora), and the “Swan” Series. Many other books and online resources are also referred to.
I began with drafting a 2D drawing of the ship, and then I imported different parts of the 2D drawing into Solidworks to guide the 3D building process.
In the following posts I will post the screenshots I captured during the build and briefly describe what is new in each figure.
Jingyang
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
Let's get started!
2011-02-09: keel, false keel, perpendiculars, cutting down line, lower deck, upper deck, stem post, stern post, stern counters, stern timbers
2011-02-10: toptimber line, top side lines, water lines, forecastle, quarter deck
2011-02-12: lower breadth line, upper breadth line, main wale, sheer rail, waste rail, drift rail, fife rail
2011-02-15: gun ports
2011-02-17: channels, deadeyes
2011-02-18: planking above the load water line, platforms, knee of the head, ladder, fenders, chestree
2011-02-19: lower cheek, upper cheek
2011-02-20: head rails, head timbers, cathead
2011-02-21: taffrail, quarter gallery
2011-02-22: rudder
2011-02-24: gun port lids, sweep ports, scuppers, hammock cranes, swivel guns. The taffrail and the quarter gallery were modified.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-02-26: details of the chains and deadeyes
2011-02-28: HALF-BREADTH PLAN added - keel assembly, main half breadth, toptimber half breadth, top side half breadth, half breadth of the rising line, projections of the diagonals
2011-03-02: BODY PLAN added. A set of lines for the inner surface of the frames are also drawn but not shown in this figure.
2011-03-04: water lines, cant frames, fashion piece, hawse pieces, transoms, inner post, apron, keelson, first thick limber strake next the limbers
2011-03-05: deadwood knee, disposition of the frames
2011-03-08: disposition of the square frames
The 3D build began from this point!
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-05-17: internal planking and external planking
2011-05-20: The space between the internal planking and the external planking was filled to form the shape of the frames.
2011-05-21: the shape of the keel assembly
2011-05-23: cutting the frames
2011-06-12: All frames were completed!
-
ppddry got a reaction from PeteB in HMS Pandora 1779 in 3D
Thanks everyone for the good words!
Garward, thank you for providing more details about the Pandora model. That’s the very model that inspired me into doing this 3d build.
Bernard, that’s a great video! I have seen it before, but I still couldn’t help but watched the full 10 minutes of it again.
Tony, it’s alright. My progress is slow so it is good to have something else to fill in the gap.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
Gaetan, this is for you.
Inside the great cabin, looking aft.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2013-03-18 Upper deck bulkheads finished
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2013-03-10&11: waist rails, sheer rails, drift rails, fife rails, plank sheers, cutting the external planking above the main wale into individual pieces
This is the progress up to now. Enjoy!
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-06-05: assembling the stern to the hull, adding the rudder chains
2013-02-11: ladders connecting the lower deck to the upper deck, chain pump winches, iron pillars on the upper deck, shot racks on the upper deck
2013-03-04 to 05: forecastle planking and fittings, quarter deck planking and fittings, catheads, stove, capstan, forecastle planksheer
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-02-29 to 05-31: working on the stern
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-01-18&19: began to draw the copper sheathing
2012-01-19: cutting the copper sheathing into individual pieces
2012-01-21: copper sheathing completed
2012-01-21: the hull with copper sheathing
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-01-11: upper deck planking
2012-01-14: internal planking above the upper deck
2012-01-15: forecastle beams, quarterdeck beams, and knees
2012-01-17: the whole assembly
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-12-19: upper deck ledges, riding bitts, gratings, capstan partner
2011-12-24: main jeer bitts, main topsail sheet bitts, lower deck pillars, pump well
2011-12-24&25: the whole assembly
2012-01-05: lower deck cabins
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-12-09: internal planking of the Lower Deck, elm tree pumps, chain pumps, upper deck beams, carlings, partners, and upper deck hook
2011-12-09: coamings of the upper deck hatches
2011-12-09: assembling all parts
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-12-04: First rendering attempt. The material was too reflective.
-
-
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-09-18: By this date, the lower deck was completed.
-
ppddry got a reaction from harvey1847 in HMS Pandora 1779 in 3D
2011-06-15: main wale
2011-06-15: shape of the external planking
The frames can be seen by setting the external planking transparent!
2011-06-16: Cutting the bottom planking into individual planks.
2011-06-17: Finished cutting the bottom planking.
2011-06-18: The main wale was also cut into individual pieces.
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-02-26: details of the chains and deadeyes
2011-02-28: HALF-BREADTH PLAN added - keel assembly, main half breadth, toptimber half breadth, top side half breadth, half breadth of the rising line, projections of the diagonals
2011-03-02: BODY PLAN added. A set of lines for the inner surface of the frames are also drawn but not shown in this figure.
2011-03-04: water lines, cant frames, fashion piece, hawse pieces, transoms, inner post, apron, keelson, first thick limber strake next the limbers
2011-03-05: deadwood knee, disposition of the frames
2011-03-08: disposition of the square frames
The 3D build began from this point!
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
Let's get started!
2011-02-09: keel, false keel, perpendiculars, cutting down line, lower deck, upper deck, stem post, stern post, stern counters, stern timbers
2011-02-10: toptimber line, top side lines, water lines, forecastle, quarter deck
2011-02-12: lower breadth line, upper breadth line, main wale, sheer rail, waste rail, drift rail, fife rail
2011-02-15: gun ports
2011-02-17: channels, deadeyes
2011-02-18: planking above the load water line, platforms, knee of the head, ladder, fenders, chestree
2011-02-19: lower cheek, upper cheek
2011-02-20: head rails, head timbers, cathead
2011-02-21: taffrail, quarter gallery
2011-02-22: rudder
2011-02-24: gun port lids, sweep ports, scuppers, hammock cranes, swivel guns. The taffrail and the quarter gallery were modified.