
Geam
-
Posts
67 -
Joined
-
Last visited
Single Status Update
-
Floor-laying thing went very well. Got rid off 2 kg off ugly fatt too! Need to dump 5-6 kg more, but I'm not going to do it in the floor laying business.
Not easy to get back into the swing of yacht building again, but starting on some small jobs like fitting the steering well so that it can be removed for access to the propshaft and servos below deck.
The smaller deck hatches will be held down by brass-painted 6.5mm screws and washers. The main hatch will be held by Caldercraft/Krick 'hatch-latches.
A lot of small jobs to do on deck fittings for the sheets and standing rigging. Also dozens of blocks to be assembled with eyes and straps.
Not quite onto a good build rhythm yet. The coming summer weather will also delay 'play'.
George