-
Posts
676 -
Joined
-
Last visited
Single Status Update
-
Sidetracked on the Constitution project to repair a commissioned work, Sultana, delivered 2 years ago.
She had to return to the yard for an availability due to Metal Fitting Corrosion. Removed rigging and masts. Cleaned, primed, and repainted fittings. Stained the deck, painted the mast and spars, and redid all the rigging.
She looks better than ever.