Jump to content

Recommended Posts

Posted

My first build and im starting the rigging but now i ran into a hurdle....im running the foremast backstays and my diagram does not give a clear picture of what i attach the top of rigging onto?? any info or pics would be great !! Thanks!!

Posted (edited)

Have you done the shrouds already? The reason I ask is because the backstays are attached to the masthead in the same way as the shrouds, and they go on OVER the shrouds. The shrouds and backstays and forestays all have an eye seized into their ends and the eye slips right over the top of the mast and rests on the bolsters upon the Trestle Trees. Here’s two diagrams I found by googling “topmast shrouds”. You can see the eyes that went over the mastheadand are now stacked on top of the bolsters and trestle trees.

52B119EA-6452-4236-B65E-3CEE1DAD9BF5.jpeg

This image is fuzzy but you can see in the upper right there’s a diagram showing each individual eye and it’s sequence in the stack of eyes.

1EB68E23-DCBD-46BD-9355-0F5A8F4D51A4.jpeg

This drawing omits the backstays eyes because it’s aparently the Lower masthead but the backstays would go over the shrouds and look exactly like the eyes of the shrouds in the drawing.

635C6703-ECE2-4663-ABB8-FA469AD5DA3D.png

Heres the real thing being set up in the shop. I think this is for the Morgan. The eyes have been leathered.

Edited by JerseyCity Frankie

  

Quote

 

 Niagara USS Constitution 

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...