Jump to content

Search the Community

Showing results for tags 'belaying'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • The Captain's Cabin
    • How to use the MSW forum - **NO MODELING CONTENT** 
    • New member Introductions
  • Member's Build Logs
    • Build logs for SHIP MODEL KITS - by era - launch date
    • Build logs for SCRATCH projects - by era - launch date
  • Group Projects on MSW
    • Group Projects on Model Ship World
  • Shop Notes, Ship Modeling Tips, Techniques and Research
    • Nautical/Naval History
    • Discussions for Ships plans and Project Research. General research on specific vessels and ship types..
    • Building, Framing, Planking and plating a ships hull and deck
    • Discussion for a Ship's Deck Furniture, Guns, boats and other Fittings
    • Masting, rigging and sails
    • Model Tips and Tricks and Making Jigs
    • Modeling tools and Workshop Equipment
    • Metal Work, Soldering and Metal Fittings
    • Wood discussion...Where to use it? Where to get it? What types are best? How to Finish it?
    • Painting, finishing and weathering products and techniques
    • CAD and 3D Modelling/Drafting Plans with Software
    • Photographing your work. How to do this.
  • Ship Modeling News And Reviews.....Traders and Dealers...Ship Model Clubs
    • General Ship Model Kit Discussions - NOT build logs
    • Reviews
    • Book, Monograph and Magazine reviews and Downloads. Questions and Discussions for Books and Pubs
    • Traders, Dealers, Buying or Selling anything? - Discuss New Products and Ship Model Goodies here as well!!
    • NAUTICAL RESEARCH GUILD - News & Information
    • Important Ship Model Club News, Links to ship modelling resources and museums
  • The Crew's Lounge
    • Non-ship/categorised builds
  • Medway Long Boat - 1742 - Public group project.'s Plans and Instructions/Downloads
  • Medway Long Boat - 1742 - Public group project.'s Medway Long Boat - 1742 - Public group project.
  • Medway Long Boat - 1742 - Public group project.'s General discussions/How to join
  • Rope Making/Ropewalks's Ropewalk Plans/Downloads
  • Rope Making/Ropewalks's Discussions about Rope Making
  • Rope Making/Ropewalks's Rope Materials and parts resources
  • Rope Making/Ropewalks's Commercial sources for ropewalk machines
  • Intro to carving - typical decorative relief carving for ship models's Build Logs for the Carving Group Project
  • Intro to carving - typical decorative relief carving for ship models's Tutorials and Discussion for the Carving Group
  • Intro to carving - typical decorative relief carving for ship models's How to join this Carving Group
  • HMS Triton - 28 gun frigate's Build Logs for the Full Hull Version of HMS TRITON
  • HMS Triton - 28 gun frigate's How to Join The HMS TRITON Group Build
  • HMS Triton - 28 gun frigate's Cross Section Build Logs for HMS TRITON
  • HMS Winchelsea 1764's How to join this group project???
  • HMS Winchelsea 1764's General project discussions on planking, fittings and monograph chapters
  • HMS Winchelsea 1764's Member Build logs for the HMS Winchelsea
  • Planking Techniques's Planking Downloads and Tutorials and Videos
  • Planking Techniques's Click Here for Topics dedicated to planking!!!!
  • HMS Granado 'Cross Section' - CAF Model's Questions and discussions about building the kit
  • HMS Granado 'Cross Section' - CAF Model's Build Logs for the CAF Granado Cross MID-Section

Calendars

There are no results to display.

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests

Found 5 results

  1. Please can anyone tell me what the alternative to pln boards and belaying pins were in the 16th century? Like cleats under the rails or something? KIts avoid this problem by simply ignoring it as far as I can tell.
  2. I am building the Mantua Albatros Art 771 kit from the 1980s. I am trying to create a belaying plan for the ship. The main mast is simple, but the fore mast is quite complex. The Mantua plans show only the basic standing rigging, and show none of the running rigging. I have eleven books that discuss sailing ship rigging, including the standards Steel, Lees, Biddlecombe, Lever, etc., but these describe full square-rigged ships and are mostly useless for deriving a schooner rigging and belaying plan. After detailed discussions of how to rig the lines on the masts, spars and sails they all finish by saying the line "runs to the deck." I do have several books that talk specifically about schooner rigging (Petersson, Underhill, Leather, Hahn, Marquardt). Most of these also say to run the line "to the deck" or "to the rail." Again, no help. Petersson's "Rigging Period Fore-and-Aft Craft" shows the belaying plan for a topsail schooner, and is the best reference I have found, but it doesn't describe the variations found on different ships. Underhill's "Masting and Rigging the Clipper Ship and Ocean Carrier" has far and away the best an most detailed discussion of ship rigging I have found, but it is mostly for full-rigged ships, with only a brief discussion of schooners. Marquardt's "Global Schooner" has good detail about rigging but it also says the lines run "to the deck." Leather's "The Gaff Rig Handbook" is nearly useless, having no useful index and focusing mainly upon 20th century racing yachts. So I have been left to my own devices to figure out how to belay the fore mast rigging. I am using two assumptions. First, lines coming down from purchases close to or on the mast lead down to ring bolts or fife rails at the base of the mast (or pins, cleats or spider bands on the mast), and lines running from the yard arms run down to the pin rails or cleats on the bulwarks or to ring bolts in the waterways near the bulwarks. Second, lines from lower purchases lead forward, and lines from higher positions lead aft. The idea is to avoid crossing lines. Here is my working plan: As you can see, there are 35 running rigging lines coming down from the foremast (not counting studding sails!). The base of the mast seems a bit crowded with 21 standing and running lines attached to ring bolts in the deck and pins in the fife rail. To achieve this I had to run the fore course bunt lines and clew lines outboard to the pin rails even though they lead from the lower top and the quarters of the fore course yard. I would appreciate comments and corrections from those who understand belaying better than I do. NOTE: I expect that as I start rigging the mast I will to have to reorder some of these positions to eliminate fouled lines.
  3. Hi all. Anyone know of an authoritative reference showing late 19th-century merchant pinrail diagrams? It is my understanding that belaying pin arrangements were fairly standardized by ship-type throughout most of the world, or at least within a nation's fleet, so that crew could be hired in nearly any port and would be able to serve with little additional training. I am looking specifically for the pinrail layout typical of a late-19th century, West-Coast, brigantine merchant of medium size. Any assistance will be appreciated. Terry Egolf Colorado Springs, CO, USA
  4. I'm getting nearer to finishing my Heller HMS Victory and I am at the stage where I am literally tying up loose ends. I had installed all the running rigging but most of it was left dangling and not made off to anything so I could have flexibility and access to the deck. Now I am belaying the lines going from fore to aft. The foremast looks great and the bow area is now clear of Irish pennants and lose ends.. , But I have come across something I find odd: the Fore Topsail Braces belay to the second skid beam. This strikes me as an odd and awkward and hard to access place to put these frequently used lines. There are many lines of running rigging on a ship, but the Fore Topsail braces are on the short list of lines you will be using all the time. And they are lines which will be under a LOT of strain and which will require a lot of crew to take up on. . John McKay, Longridge and the Heller instructions themselves have them belaying in this odd place (although the kit instructions may indicate the rail at the forward edge of the hatch, the kit has a molded on pin where the others say the lines belay). Lees doesn't specify where they belay in his section on Fore Topsail Yards. . The lines begin on the main stay close to the main mast then run to the blocks on the yardarms. From there they come right back to lead blocks on the stay, close to where they originated. From there they run forward down the stay to another pair of lead blocks on the stay above the belfry, and from there to a lead block on the forward edge of the hatch (or a fairlead in a timberhead there?) then belay to a fore and aft pin which pierces the second skid beam. The references I have that show the pin show it several feet away from the gangways, not within easy reach of someone standing there. . The only way this makes sense to me is if the crew were intended to handle the line from the gundeck below. Which makes me wonder then why it wouldn't belay on a big hefty cleat on the bulwarks there. Why above their heads in a place difficult to access? Why not on one of the timberheads at the forward edge of the hatch? The way it is rigged it zigzags through space quite a bit and I believe it could have been lead nearly anywhere with the resources it is using. So why is it 1/4 of the way inboard on a skid beam, which I believe would be a difficult place for anyone to manage it?
  5. Hi Folks, Are there any standards for bulwark-mounted belaying pin racks? The kit-provided parts for my HMS Mars build, which I am replacing, are 16 scale inches deep, which seems a bit large. She's a late 18th century, 18-gun brig, and specifically I'd be interested in standards for: depth of rack (from bulwark to inboard edge) mounting height off of deck Thanks, Robert
×
×
  • Create New...