Jump to content

PSF

Members
  • Posts

    106
  • Joined

  • Last visited

Everything posted by PSF

  1. I installed the lower right Gallery I installed the lower deck at once I immediately made ​​the lower deck flooring test knyavdiged
  2. Construction of the ship "Le Mirage" started in October 2010 Have a lot of pictures. I will post photos in small batches.
  3. Very nice to look at your model. Zedes nahodittsya report on the construction of the model moegy LE Mirage: part 1: http://forum.modelsworld.ru/topic7141start0.html part 2: http://forum.modelsworld.ru/topic10598.html Pleased to meet you and look forward to further communication. Good luck!
×
×
  • Create New...