ppddry
-
Posts
42 -
Joined
-
Last visited
Reputation Activity
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
Let's get started!
2011-02-09: keel, false keel, perpendiculars, cutting down line, lower deck, upper deck, stem post, stern post, stern counters, stern timbers
2011-02-10: toptimber line, top side lines, water lines, forecastle, quarter deck
2011-02-12: lower breadth line, upper breadth line, main wale, sheer rail, waste rail, drift rail, fife rail
2011-02-15: gun ports
2011-02-17: channels, deadeyes
2011-02-18: planking above the load water line, platforms, knee of the head, ladder, fenders, chestree
2011-02-19: lower cheek, upper cheek
2011-02-20: head rails, head timbers, cathead
2011-02-21: taffrail, quarter gallery
2011-02-22: rudder
2011-02-24: gun port lids, sweep ports, scuppers, hammock cranes, swivel guns. The taffrail and the quarter gallery were modified.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
Gaetan, this is for you.
Inside the great cabin, looking aft.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2013-03-18 Upper deck bulkheads finished
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2013-03-10&11: waist rails, sheer rails, drift rails, fife rails, plank sheers, cutting the external planking above the main wale into individual pieces
This is the progress up to now. Enjoy!
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-06-05: assembling the stern to the hull, adding the rudder chains
2013-02-11: ladders connecting the lower deck to the upper deck, chain pump winches, iron pillars on the upper deck, shot racks on the upper deck
2013-03-04 to 05: forecastle planking and fittings, quarter deck planking and fittings, catheads, stove, capstan, forecastle planksheer
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-02-29 to 05-31: working on the stern
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2012-02-20 to 25: working on the steering gear
2012-02-25: changed the color scheme
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-05-17: internal planking and external planking
2011-05-20: The space between the internal planking and the external planking was filled to form the shape of the frames.
2011-05-21: the shape of the keel assembly
2011-05-23: cutting the frames
2011-06-12: All frames were completed!
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-09-18: The planking in the hold was also completed.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-09-18: By this date, the lower deck was completed.
-
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
Gaetan, this is for you.
Inside the great cabin, looking aft.
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-12-09: internal planking of the Lower Deck, elm tree pumps, chain pumps, upper deck beams, carlings, partners, and upper deck hook
2011-12-09: coamings of the upper deck hatches
2011-12-09: assembling all parts
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-12-09: internal planking of the Lower Deck, elm tree pumps, chain pumps, upper deck beams, carlings, partners, and upper deck hook
2011-12-09: coamings of the upper deck hatches
2011-12-09: assembling all parts
-
-
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-09-19: Putting all the parts together.
Midship section
-
ppddry got a reaction from JerryTodd in HMS Pandora 1779 in 3D
2011-09-18: The platforms in the hold.
Putting the keel assembly, the planking in the hold, and the platforms together.
-
ppddry got a reaction from KORTES in HMS Pandora 1779 in 3D
2011-09-18: By this date, the lower deck was completed.
-
ppddry got a reaction from BANYAN in HMS Pandora 1779 in 3D
Gaetan, this is for you.
Inside the great cabin, looking aft.
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
2013-03-18 Upper deck bulkheads finished
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
2013-03-10&11: waist rails, sheer rails, drift rails, fife rails, plank sheers, cutting the external planking above the main wale into individual pieces
This is the progress up to now. Enjoy!
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
2012-06-05: assembling the stern to the hull, adding the rudder chains
2013-02-11: ladders connecting the lower deck to the upper deck, chain pump winches, iron pillars on the upper deck, shot racks on the upper deck
2013-03-04 to 05: forecastle planking and fittings, quarter deck planking and fittings, catheads, stove, capstan, forecastle planksheer
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
2012-02-29 to 05-31: working on the stern
-
ppddry got a reaction from Bill Morrison in HMS Pandora 1779 in 3D
2012-02-20 to 25: working on the steering gear
2012-02-25: changed the color scheme