Jump to content

Lee J H

Members
  • Posts

    116
  • Joined

  • Last visited

Everything posted by Lee J H

  1. The space between the ribs was stuffed with balsa wood. Although this process is cumbersome, it is a good job for the overall line.
  2. The construction of Vasa ships has been postponed for some time. There was also the problem of obtaining wood materials, so I decided to start by buying another kit. This is the kit I've always been interested in. Please excuse me for not being familiar with English while writing the production log.
  3. Now the second flanking also shows 75% process. In the meantime, I'll be lazy and work hard.
  4. The deck was thus completed. I like to insert the paper. even if it's cumbersome.
  5. Producer was very late. Deck construction began. A black piece of paper was inserted into the gap.
  6. This work has been suspended for me, too. I believe this production period will help a lot.
  7. Thank you. hubac. Please understand even if your English is not good. I think so too. Walnut is difficult to handle, but the color is profound and nice
  8. Start the 1st planing. Use a walnut 1mm wood different from the contents. Start at the location indicated in the tutorial. However, it is also a bit of a strange location.
  9. I'm curious about the capacity of the LED used. It'll be so cool when the production is over.
×
×
  • Create New...