Jump to content

portchieboy

Members
  • Posts

    51
  • Joined

  • Last visited

Recent Profile Visitors

838 profile views

Single Status Update

See all updates by portchieboy

  1. Hello max

                 Info for you.... before you fit the main and fore match in position  go to plan sheet nine.   Main mast,      Then plan ten for fore mast

    See the upper jeer blocks. ( I )Fit them in position now. Fit the thread onto the jeer block.  

    Go to the side elevation (right Hand side of the drawing) and you will see 

    how the rigging on the block runs under the tops. ( platform ) then fits onto the V shaped rigging thread which runs around the mast about 4 or 5 times. Fit the V shaped thread to the mast as shown.

    next fit the rigging thread from the jeer block to the V shaped thread.

    The jeer block should hang about  a. Quarter of an inch below the tops (platform).  The instruction in the manual tell you to fit the jeer blocks a lot later on in the build which is not easy at all. 

    The lower jeer block as you know is fitted to spar, and the blocks will be joined up when the spar is fitted.      Also notice the jeer blocks ( upper and lower ) on the drawing are both upside down on the drawing. The drawing is wrong.  Let me know if you don’t understand.   Regards   DAVID 

    6207D8B0-DFD6-4000-A6A3-6D63460AAC36.jpeg

    image.jpg

    image.jpg

×
×
  • Create New...