Jump to content

CRI-CRI

Members
  • Posts

    1,405
  • Joined

  • Last visited

Everything posted by CRI-CRI

  1. The only difference with the first version is the removal of rear chamber Now, the planking of hull is done, tomorrow, I hope taking out the cake... 😘 :
  2. My chinese ship's boat in progress 😘 Four strikes each side done :
  3. Following new ship's boat I saw two ships come sailing in On Christmas Day, on Christmas Day; I saw two ships come sailing in On Christmas Day in the morning 😘 https://www.youtube.com/watch?v=hVDzFtNNlgE
  4. The main mast's rake is an interessant question For the Niña, I chose a rather neutral setting around 8° forwards, she was'nt a racing ship 😘 Some details : Weather helm (Source : english Wikipedia)
  5. Brass sheaves were added to the great down block (jeer-bitt of main mast) :
  6. Two desk's jeer-bitts were done (not glued), main with four sheaves, and mizain with only three :
  7. New test of main sheave"s blocks, the bottom one will be inclined along the mast :
  8. Hi Roger, I tested two possible presentations, but I prefere third project, on ship's deck :
  9. Today works : first complete upper block, and a new special boat's project adapted to Niña :
  10. Louie da fly : It's easier with sheaves eight ropes to rig : all sheaves look regular and follow future wood variations as the real ship did... First three sheaves rear block prepared :
×
×
  • Create New...