Jump to content

kmurph

Members
  • Posts

    4
  • Joined

  • Last visited

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Finished up the deck furniture and started to mount the bits and cleats. I Have the mast spreader cut and painted. Working on the masts and booms. It is going to be a few weeks before a can do any more work on the model.
  2. I have gotten the hull painted and the brass rod installed on the hull. I am going to wait on the bow Decorative brasswork, until after the Bowsprit it is installed. The deck houses made a little bit more sanding and then staining. I need to take some time to figure out the rest of the deck connections for the rigging.
  3. Started this build a few weeks ago. Hull all shaped and started the painting process.
  4. I retroactive created this build log. I went off the build plan when it came to the light towers. I used tubing instead of the supplied wooden dowels because i want to install mini LED lights in the towers. For the mounts i used 1/4" bolts that i drilled a hole through the middle for the wires. For the lights i used Lighthouse LED 12V, 5MM flat top prewired and the power supply from lighthouseled.com. The Model is 98% complete. I lost a couple of items during a move. I ordered the parts along with my next project.
×
×
  • Create New...