Jump to content

marktiedens

NRG Member
  • Posts

    1,737
  • Joined

  • Last visited

Reputation Activity

  1. Like
    marktiedens reacted to pirozzi in Royal William by pirozzi - FINISHED - Euromodels - 1/70   
    Middle gun deck ports cut out and false cannon blocks in place on deck.
     
    Vince P.





  2. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 31
     
     
     
     
     

    aft deckhouse (command cabin and nav- and Chart-room) and spare aft anchor.
    the blue guy had always become too much Porridge as a Baby already and now has to leave the Crew for his size
     

    chest-cover to sit on, for the auilliary rudder mechanics, here still without wheel
     

     

     

     

    some brass pinrails to the deckhouse, and the main rudderstand saddle for the 3 steering wheels, this rudderstand (the wheels) is operated manualy if necessary by up to 6 men
     

     
     

    the Long boom outside starboard bulwark is swivible and required for fastening the boats in water (when rigged 90° square to the hull). The brass wire through the top spanner-eyelets is only preliminary and prevents the spanners from tilting down between bulwarks and inboard pinrails
     

     
     

    vents and Skylight added on top of the small well-deckhouse
     
     
     
     
     
     
     
     
    Build log part 32 to follow.....
     
    Nils
  3. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 30
     
     
     
     
     

    check for cutter on the boats rack
     

     
     

    captain`s pinnace goes besides the cutter
     

     
     

     

     

     

     

     

    first deck Skylights....
     
     
     
     
     
     
    Build log part 31 to follow....
     
    Nils
  4. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 29
     
     
     
     

    decks ready for Fitting out
     

    Stern and bow of hull so far done
     

     

    checking backstays alignment with regular Cotton thread strings first
     

     
     

     

     

     
     

    set of masts and Yards painted
     

     
     
     
     
     
     
    Build log part 30 to follow....
     
    Nils
  5. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 28
     
     
     
     
     

    bottom Planks an sitting benches fit well
     

    parts glued together and bulwark rails fitted
     

    a Little bit of painting done and rudder fitted
     

    the ouitcuts for the oars are done
     

    three simular boats completed
     

    the captains pinnace is done in wood
     

     
     

    Fittings attached
     

    the figure in the Cockpit is scale 1:87 (a bit too large)
     
     

    nav lights, bulls eyes and windowframes still missing
     
     
     
     
     
     
     
     
    Build log part 29 to follow....
     
    Nils
  6. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 27
     
     
     
     
     

    this wooden form gives the inner space of the boat after removing it
     

     
     

    gratings for the boatrack
     

     
     

    aft bumpkins mounted
     

    middle bumpkins mounted
     

    produce 3 left and 3 right halves from the two moulds
     
     

    the deck inner portions are cut out
     
     

    made sitting Banks from Card templates and stained ply to match the boats interior contours
     

    ready for fit check
     
     
     
     
     
    Build log part 28 to follow....
     
    Nils
  7. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 25
     
     
     
     
     
     

    Need 28 halves of this raft Containment, so ist worth doing a mould.....
     

    the half of the metal model is pressed into schoolkids clay, this being the mould (s)
     

    when making the boats there is always, before it cures off, some Polyester left, so is goes
    into the moulds (without wasting it)
     

    sanding, primering, Fitting of the halves, and preliminary mounting (some cradles to be made first)
     

     
     

     

    fastening with brass wire straps
     

    fitted on to the raft Container launching flipboards
     

     
     

    a wooden model is made for the three boats of the Gorch Fock. The making of the boats Pictures shall follow later on
     
     
     
     
     
     
     
    Build log part 26 to follow.....
     
    Nils
  8. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    build log part 24
     
     
     

    Preparing for the captains Launch (Pinasse 9,2m )
     
     

    the Yards have to allow bracing to utmost Position before they touch the backstays
     

    checking alignment through topgallant platform before the final backstays are set
     

     
     

     

     

    the boats Derrick attached to the mainmast
     

    the mizzenmast bears no yards
     

    have the most masting parts done...
     

    the ventflaps for the scupper openings are attached
     

    my master raft Containment template for moulding the semi halves
     
     
     
     
     
    BUild log part 25 to follow....
     
    Nils
  9. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    build log part 23
     
    Here the mizzen mast unpainted....
     
     
     

    hooters, Radar station
     

     
     

     

     

    lower platform antenna
     

    top antenna
     

     
     

    Mast top
     

    middle gaff boom bearing
     

    set of masts, yards
     
     
     
     
    Build log part 24 to follow....
     
    Nils
  10. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 22
     
     
     
     

    the pinrails are removable for Access to the eyelets (shrouds and backstays fastening)in between
     

     
     

     

     

    mizzem mast pinrail, the nameplates are aside the poopdeck and at stern
     

    bowsprit netting
     

    swivible bumpkins for bracing tackle rope guides
     

     

     

    the tack Position of the Forward mast lower yard
     
     
     
     
     
     
     
     
     
    Build log part 23 to follow....
     
    Nils
  11. Like
    marktiedens reacted to DiKri in Wasa by DiKri - Corel - 1626-1628 1:75   
    All masts and spars are ready with blocks attached according to the Corel plans.
    I placed the masts on the hull just for the photo. The background isn't what it should be, but nice pictures is for later...
     
    Next I experimented a little bit with a Bosch PLL5 laser pen as help in aligning the masts. Seems to be very helpfull...
     



     
  12. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    build log part 21
     
     
     
     

    variety of Yards in different completion stages
     

    view skywards
     

    jib boom rigging done
     

    without figurehead
     

    Albatros at its place
     

     
     

     

     
     

    side hull bumpkins for bracing tackle
     

    bulwark bolts to be cut and nuts and washers to be painted white
     
     
     
     
     
     
    Build log part 22 to follow.....
     
    Nils
  13. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 20
     
     
     
     
     

    scetch for Yard / block tackle at mast
     

    preparing for soldering jackstays to the lower yard
     

    on the next model I would`nt do the footrope (horses) holders this way, They would touch the yard tangentialy from the Yard aft side, and be attached to the second jackstay row
     

     
     

    checking the Yard swiviling capability
     

     
     

    the geometry of the yardracks must allow a Close as possible Position of the leeward yardend to the shrouds when full braced
     

    startig jib boom tackle and safety netting
     

    the solid bobstays are from brass wire
     

    the Albatros figurehead is attached removable
     
     
     
     
     
    Build log part 21 to follow...
     
    Nils
  14. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 19
     
     
     
     

    scetche for rigging mainmast
     

    and for foremast
     

    scetch for Yard (one of many)
     

    impressions for masts and Yards after painting
     

     

     

     

     

     

     
     
     
     
     
     
     
    Build log part 20 to follow....
     
    Nils
  15. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 18
     
     
     
     

    foremast
     

     
     

    one of the two main lower Yards with twinjackstays attached
     

     

     

    Yard mounted to its place
     

     

     

     
     

    Stern decoration with nameplate, and hometown badge (Kiel)
     
     
     
     
    Build log part 19 to follow....
     
    Nils
  16. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 17
     
     
     
     

    getting all the eyelets soldered on
     

    stations for hight-fixed and vertical-moveable yards
     

    underside of topgallant platform
     

    masttop and slide rail for royal-yard
     

    underside of lower top platform
     

     
     

    Radar Station protection Cage on foremast
     

     

    fog horn within protection as well
     

     
     
     
     
     
     
    Build log part 18 to follow....
     
    Nils
  17. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 16
     
     
     
     
     

    roller for Yard hoisting / lowering chain (in mid mast)
     

    bulls eyes inserted
     

    checking mast angles and alignment
     

    Fitting for taking up the chainplate (anchoring for the lower top shrouds)
     

     

    top spars with access- ladder and devices for antenna and nav light attachments
     
     
     

     

     
     

    belaying Points in deck area
     

     
     
     
     
     
    Build log part 17 to follow....
     
    Nils
  18. Like
    marktiedens reacted to Ulises Victoria in Vasa by Ulises Victoria - FINISHED - Corel - Scale 1: 75 - Royal Ship   
    Hello all!!!
    I finished the running rigging in my Fore mast. 
    Next Main, Mizzen, Flags and done!!!!
     
    Thanks for watching.
    As always, comments and critiques welcome!!!
     












  19. Like
    marktiedens reacted to NAZGÛL in Wasan 1628 by Nazgul - FINISHED - Billing Boats Vasa 1:75   
    Here's a small update on the jacks:
     
    Carving the roman soldiers. The real ones are very corroded and little details can be seen, so I went for a design I liked.
     



     
    /Matti
  20. Like
    marktiedens reacted to JanV in Wasa 1628 by JanV - Corel - scale 1:75 - Vasa   
    all figures are mounted
     

     

     

     
    next step will be the finalization and repair of paintwork.
    also I hava to make a to-do list for the last items on the decks
    - stairs
    - doors finalization
    - decorations between the doors
    - .........
  21. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 15
     
     
     
     

    togallant platforms
     

    Connection to cap and spars (on the two mainmasts)
     

     
     

     

    alignment checks before soldering parts together
     

    the lower top is moved to the correct Position, then secured with a pin to the mast
     

    Mast rail shoe that goes to the appropriate yardrack
     

    set of uncompleted masts and jib boom
     

     
     

    some paint touch ups done, now ready for inserting portholes (bulls eyes)
     
     
     
     
     
    Build log part 16 to follow....
     
    Nils
  22. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 14
     
     
    Starting to do parts of the masts
     
     
     
     
     

    plattforms for the lower tops (multifold soldering Piece)
     

     
     

    These will be slipped on to the mast and later secured in Position by a pin
     

    handrails at rearside of plattforms
     

     
     

     
     

    chocolate Brown Color at poop and forecastle upper portions
     
     

    anchorchain portholes mounted
     

    other porthole openings drilled but no inserts yet
     
     

    White paint on...
     
     
     
     
     
    Build log part 15 to follow....
     
    Nils
  23. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 13
     
     
     
     
    Time to get primer and paint started...
     
     
     

    dull White resin based primer is brushed on
     

    the rudder has been plated as well, but the prop is too small in diam.
     

    found this one at a web-shop, and modified it a bit, cut off the eye and drill a M3 thread into the hub
     

    figure is 1:87 (H0) scale)
     

     
     

    here and the next pics the White Portion is only primered
     

     

     

     

     
     
     
     
     
    Build log part 14 to follow....
     
    Nils
  24. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 12
     
     
     
    The ultimate GF 2 actual Version has rivited plates to the frames and also welded plates for horizontal seams. As I do not exactly know to what degree the riviting was in 1958 when launched, I "rivited" the entire models hull. Perhaps someone may now better...
     
     
     

     

     

     

     

     

     

     

     

     

     
     
     
     
     
     
    Build log part 13 to follow.....
     
    Nils
  25. Like
    marktiedens reacted to Mirabell61 in Gorch Fock 2 by Mirabell61 - FINISHED - scale1:95   
    Build log part 11
     
     
     
     
     

    the ladder like fields dimensions orientate on the grating (later fitted) measurements
     

    the boatrack supports are screwed done under the same screws as the pinrack rails
     

    welldeckview looking foreward
     

    the functional flip launching boards shall take up the inflatable raft Containers (here closed)
     

    here flipped open, also the Center Support deck to boatrack Support can be seen
     

    here the plating of the hull Begins. The main plating to be seen in the next build log part
     
     

     

     

     

     
     
     
     
     
    Build log part 12 to follow....
     
    Nils
×
×
  • Create New...