Jump to content

Recommended Posts

Posted

Sponges and sponge fishing were well known in the ancient times and they are mentioned in several documents of the Greek classical literature.

 

From the 19th till the first half of the 20th century the sponge fishermen were coming mainly from the Dodecanese islands (Kalymnos, Symi, Kastelorizo, Chalki, Leros, Patmos and Astypalea), from Asia Minor (Kidoniai (Ayvalik), Krini (Tsesme) and Alikarnassos (Bodrum)), as well as from the Argosaronic Golf (Hydra, Hermioni, Spetses, Kranidi, Aegina, Piraeus). Trikeri, Chalkis, Oropos, Paros were some other islands in the rest of the Aegean and the island of Kutalis in the Sea of Marmara  were also known for their sponge fishermen. The eastern Mediterranean basin and the northern African coasts were the main sponge fishing areas.

 

The sponge as a commodity was highly appreciated amongst the people, throughout the centuries. The industrialization in Europe increased drastically the demand. It is therefore obvious why the fishing and export of sponges contributed substantially in  the local economy for many islands as late as the middle of the 20th century.

 

Sponge fishing was a special trade carried out by highly skilled and experienced divers and it required special types of vessels, suitable to support the sponge gathering from considerable depths in the sea.

 

The sponge fishing vessels can be identified into two groups, depending on their use. The vessels used without any diving activity (e.g. trawling for sponge fishing or harpooning) belonged to the first one, while the vessels equipped for sponge diving belonged to the second group of vessels. “Symiaki Skafi” belonged  in this second group.

 

There is a third group of vessels called “depozito” or “bageto” which were not of any specific type of hull and they were used as supporting and supplying vessels to the divers and the crew of the sponge fishing vessels.

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted (edited)

Symiaki Skafi

 

The most common type of sponge fishing vessel was Skafi and especially the one, which was usually built on the island of Symi. That type of vessel was very common in Symi since the beginning of the 19th century and by the end of the same century vessels of this type in the island were over 160.

 

Skafi was a small vessel less than 15 m. L.O.A  and a distinctive form. The length of its keel was about half of the L.O.A. The stern post was straight and inclining sharply forward, occupying more than 1/3 of the L.O.A. and bearing almost an equal length to that of the keel. The transom on the stern was inclining backwards and occupying less than half of the height of the stern post. The middle beam (M.B.) was about 2/3 of the length of the keel and about 1/3 to 1/4 of the L.O.A. The capacity of the boat was 40-50 tons.

 

Skafi had an extensive draught and a very pronounced sheer. The profile of the middle frame-section of the vessel was like a double ended boat below the water level (V-shape) and like a boat with a transom on the part above the water level (the sides fairly parallel to a bow and buttock plan). Because of this special form of the hull and the extensive sail's area which was carried the boat needed a lot of ballast, usually composed of beach stones.

 

The rigging of Skafi had several variations. The most complicated one was with a spritsail (mainsail), a main topsail and a main (course) sail on the mast, a mizzen on a small mizzen mast and a foresail, a jib topsail and a jib fore of the main mast. Alternatively the mainsail on some Skafi boats was a lateen instead of a spritsail. A simpler recorded version on a small Skafi from Symi was only with a spritsail, a foresail and a small jib, while on a small Skafi from Kalymnos only a spritsail and a forsail appeared.

 

It is worth to mention the special use of the small steering sail (mizzen) on the stern of the skafi. As the boat had to follow slowly the diver that was connected to the boat by means of a rope, this sail, together with the wide rudder provided slow side movements of the boat when she casted anchor, with long line. The vessel had  the ability to move very smoothly during diving or to stay on a certain position, despite the weather and the prevailing currents.

This special and distinctive form however made sailing very dangerous. Sudden changes of the wind did cause a very unstable balance of skafi, since the hull's centre of volume had sudden and automatic repositioning. Most of the accidents concerning these boats occurred during sailing rather than diving for sponges.

 

post-3284-0-99085400-1365105958_thumb.jpg

Skafi - from the maritime museum of Symi

Edited by stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

Bringing the plans to the desired scale.

 

The first stages of the project one may say they are not that exciting as one must deal with a lot of research, and preparatory work.

 

One of the most crucial steps in such a project is to bring the plans to the desired scale. It is crucial, because plans from different sheets must be resized and brought at the same proportions.

 

In my case I had to resize 6 different sheets (scanned copies from a book). The program I used is Adobe photoshop, however I’m sure the same process can be run with a similar software.

 

The steps below were followed for all pages:

 

Print  a copy of the plan at 100% scale. If the plan does not fit within the paper size, make sure that the legend of the  plan is within the print area, as it is the element that will assist us to resize the plan.

post-3284-0-80373700-1365105724_thumb.jpg

Take accurate measurement of the legend. I used  the callipers, as it can give me a measurement with a good precision.

 

To figure out the resizing percentage I used basic arithmetic:

 

If  for example, the 6m actual size corresponds to 42.8 mm on the printed plan, then at 1:50 the 6m actual size corresponds to 120 mm. The ratio 120/42.8 equals to 280.37% which will be used as the resize parameter in  Photoshop.

Each resized picture was saved with a different name (to preserve the original one).

 

The next step was to print the resized image and verify that the scale is correct.

post-3284-0-57506500-1365105805_thumb.jpg

As I do not have other than a standard A4 laser printer, I print only the area with the legend. With the aid of a scale ruler I verified that the new plan was correctly resized.

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

THE DRY DOCKS (adapted from the initial post)

 

These are the first two pictures of this project:

 

post-3284-0-34190400-1365440054_thumb.jpg

 

post-3284-0-60776400-1365440053_thumb.jpg

 

 

 

The jig is not ready yet,  in order to secure  the keel in vertical postition in relation to the board, a metal guide will be fit on the board to serve as a fence.

 

Stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

The fence  mentioned in my previous post has been fit on the board.

Before securing the upper board in place, I first needed to build the keel with the stem and stern posts, as seen in the next picture:

post-3284-0-71259200-1365441650_thumb.jpg

 

In the next two pictures the upper board as fixed in place and ready to accomodate the frames.

 

post-3284-0-66428800-1365441651_thumb.jpg

 

post-3284-0-68248400-1365441649_thumb.jpg

 

A few words about the wood I used for the keel and the frames: it is iroko hard wood with good texture and I found no issues so far while cutting it either the disk saw or the fret saw.

 

As I chose to build it at 1:50 scale and the  actual LOA is not greater than 15 m, the dimensions of the build will make the construction challenging and interesting…

 

Stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

FRAME BLANKS

 

The frame blanks are used to construct the frames. The principle is very simple: glue on the frame blank the shape of a frame, cut it then with a fret saw, and you're ready.

 

The frame blaks themselves are made out of wooden strips; It took me some time, as I had to cut strips of wood from a bigger log. The picture below shows a log  similar to the one I cut such strips.

 

post-3284-0-68928300-1365444588_thumb.jpg

 

Starting  from the mid-ship frames, the next step was to design the blanks with the appropriate shape and size cut the wood strips according to their pattern. The protractor is very handy in this case, as the angles of the parts  must be accurate, otherwise they will not fit together properly.

 

post-3284-0-88217700-1365444589_thumb.jpg

 

The picture below shows the first 5 blanks. They are marginally  thicker than the required, but with a little sanding this will be corrected.

 

post-3284-0-29391400-1365444587_thumb.jpg

 

Next step is to design the frame templates and stick them on the blanks.

 

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

FRAMES

 

In the below pictures you may see the first 5 frames were fit on the keel.  The end result is satisfying, for various reasons:

The wood in use (iroko) did not create any troubles; the scroll saw gave clean cuts and the sanding produced clean surfaces with the correct thickness (4 mm).

The most important is that the frames were fit in the expected position, with no visual deviation from the drawing board.

 

post-3284-0-41067400-1365445812_thumb.jpg

 

post-3284-0-40824300-1365445811_thumb.jpg

 

The horizontal sticks serve as spacers and are removable.

Stelios

 

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted (edited)

FRAME CONSTRUCTION

 

This is a brief summary of the frame construction.

In principle, the steps  followed to build the frames are:

  1. Design the frames
  2. Design the blanks
  3. Prepare blanks
  4. Make frames
  5. Fit frames on the keel.

 

The picture below relates to step 3).

 

post-3284-0-59208200-1365447178_thumb.jpg

 

Please note that the coffee mug is part of the equipment needed for a successful frame construction.

 

Office stationery can be very handy as seen in the picture below…

 

post-3284-0-01808900-1365447180_thumb.jpg

 

I took into consideration your feedback (NB: from the original posts) and I marked in advance on the template the position of the frames; I must admit, it made my life much easier.

 

Secondly, the spacers are not movable any more,  I glued them between the frames.

I positioned them underneath the wooden template. Once the frames are in place, the spacers will be cut and trimmed leaving only a small joint between the frames. These joints  as a whole, will provide extra sturdiness to the entire construction.

 

post-3284-0-14253100-1365447181_thumb.jpg

 

post-3284-0-40412100-1365447177_thumb.jpg

 

Stelios

Edited by stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

The abacus (stern)

After the installation of the frames and prior to the installation of the deck beams, it was the turn of the abacus construction.

The abacus (this is a Greek word by the way) are the wooden panes that make the stern.

In the pictures below  is shown the steps of making the two panels:

 

Wooden strips, aprox. 1mm thick were used; they're glued together on those small flat pieces of wood to imitate the planks.

post-3284-0-11223700-1365539530_thumb.jpg

 

In the picture below one can see how it looks like, before sanding them down:

post-3284-0-62106800-1365539531_thumb.jpg

 

Same after sanding them down

post-3284-0-02265700-1365539533_thumb.jpg

 

In order to cut into shape, the paper pattern was glued on; the method is simple: print the pattern from a laser printer and glue it. I used quick mount glue (spray) which can be found in all stationery stores.

post-3284-0-38200000-1365539534_thumb.jpg

 

In the next two pictures, one can see the final outcome after the frame installation and the stern abacus.

The spacers are also seen that now serve as joints between the frames (see my previous post).

post-3284-0-78197900-1365539535_thumb.jpg

 

post-3284-0-47405900-1365539528_thumb.jpg

 

Stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted (edited)

FORECASTLES, DECK BEAMS, HATCH

 

As part of the deal with a carpenter who was employed to  do some wood works in the house, it came to my possession five pieces of cherry wood, which I intend to use for the planking of all exterior of my current build.

 

From that point and onwards, the build continues with cherry wood, starting with the forecastles of the ship.

Needless to say, cutting down to strips it was a neat job, much easier compared to iroko:

 

post-3284-0-69867700-1365619687_thumb.jpg

 

The forecastles were build with the same method  used for the abacus, (please refer to my previous post). The ned results was very good; iroko is a strong wood,  a good choice to build the keel and the frames, whilst the cherry wood is ideal fro the visible parts of the hull.

 

post-3284-0-86735900-1365619688_thumb.jpg

 

post-3284-0-02260500-1365619690_thumb.jpg

 

The build is continues  with the construction of the deck beams; the picture below shows the first steps of the deck construction: I have dry fitted the first beams that will host the hatch.

 

post-3284-0-44218900-1365619686_thumb.jpg

 

Stanchions

The stanchions installation is inter-related with the correct thickness (scale) of the upper part of the frames. Hence, before continuing with the deck beams and in order to  be able to trim effectively the upper part of the keel frames,  I decided to do some outer planking first to secure the bulwark shape and then trim the frames. Otherwise,  trimming (or weakening) them, might  make difficult (at a later stage) the bulwark construction.

 

post-3284-0-69931000-1365619708_thumb.jpg

 

After the first planks were in place, it is safe to continue with the installation of the rest of the deck beams. Please notice that they sit on some sort of guardrails, (glued strips of wood on the inner part of the frames.)

post-3284-0-84489500-1365619709_thumb.jpg

 

The Stanchions under construction

post-3284-0-37847000-1365619711_thumb.jpg

 

The hatch installation

This is one of my favorites: two strips of wood glued together and then cut  at 45 degrees and form the square shape of the hatch. I let the picture s tell the story:

post-3284-0-28245300-1365619712_thumb.jpg

 

post-3284-0-38333200-1365619713_thumb.jpg

 

post-3284-0-63069900-1365619714_thumb.jpg

 

Now, the deck is ready for planing.

post-3284-0-76342400-1365619707_thumb.jpg

 

to be continued...

Edited by stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

Deck Planking

 

In the following sequence, you can see the methodology followed to plank the deck.

Thin square strips of wood (about 1mm x 1mm), were glued together one next to other on the beams. 

 

post-3284-0-59915600-1365794208_thumb.jpg

 

post-3284-0-78452000-1365794211_thumb.jpg

 

Once finished,  the surface was smoothed down and varished (one coat) to avoid smudges on the surface.

 

post-3284-0-36888100-1365794207_thumb.jpg

 

For the record, these pictures were taken between 20 and 24/12/2010

Stelios

 

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

Hull Planking

Skafi's unique hull shape made planking challenging. It took a lot of plank bending ironing trimming in order to achieve  a respectable outcome.

Initially I made the mistake to use brass nails with visible head. I used only a few,  so the problem is not very visible, only to those who know...

For the rest I made my own nails, (without head) made out of galvanized steel. My source was a pack of staples, purchased from the local office  supplies store.

The gaps were filled with small flakes of wood reinforced with carpenter's glue. Finally, it was sanded down, and varnished.

 

Its unique shape made planking a challenging process

post-3284-0-09862500-1365955691_thumb.jpg

 

It took a lot of sanding to smooth  down this ugly duckling

post-3284-0-11268700-1365955690_thumb.jpg

 

The home made nails are not visible at the final stage

post-3284-0-21209300-1365955689_thumb.jpg

 

post-3284-0-00772200-1365955693_thumb.jpg

 

This is the first varnish coat, to avoid smudges...

post-3284-0-96882400-1365955691_thumb.jpg

 

Galvanized staples. they can  be used as nails.

post-3284-0-77187900-1365957399_thumb.jpg

 

Stelios

 

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

Following the same methodology followed to build the abacus, I built the forecastles.

For the record, the picture showing them installed was taken on 27/03/2011...

 

post-3284-0-12473400-1366487476_thumb.jpg

 

post-3284-0-72270000-1366487472_thumb.jpg

 

post-3284-0-46144800-1366487532_thumb.jpg

 

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

From the captain's log: September 23rd, 2011:

Various works on the bulwarks and the construction of the deck house; it is  shown on the deck (dry fit last picture), whilst in the previous ones you can see the various construction stages.

 

An entire summer had passed with minimum to no modelling activity. This is at least what was recorded in my photo log...

 

post-3284-0-26239600-1366488568_thumb.jpg

post-3284-0-18202500-1366488598_thumb.jpg

post-3284-0-18801100-1366488597_thumb.jpg

post-3284-0-05339400-1366488599_thumb.jpg

post-3284-0-00918400-1366488600_thumb.jpg

post-3284-0-14020300-1366488601_thumb.jpg

post-3284-0-02971900-1366488596_thumb.jpg

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

The rudder:

 

In the following pictures you can see the various stages of its construction.

It is worth noting that the hull was varnished with one coat, just to avoid the smudges o on the wood.

The final coating was applied after all wood works were completed.

For the record, the date the rudder was fixed on the hull was November 27th, 2011, whilst construction of the brass hinges were logged  earlier, on Aug 14th 2011.

post-3284-0-49877500-1366489877_thumb.jpg

post-3284-0-34962700-1366489885_thumb.jpg

post-3284-0-03828100-1366489893_thumb.jpg

post-3284-0-09774100-1366489937_thumb.jpg

post-3284-0-63644100-1366489938_thumb.jpg

post-3284-0-18901500-1366489940_thumb.jpg

post-3284-0-57789100-1366489983_thumb.jpg

post-3284-0-78266300-1366490034_thumb.jpg

post-3284-0-11926000-1366490036_thumb.jpg

post-3284-0-17993200-1366490037_thumb.jpg

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

In the meantime, various wood-works were taking place such as the construction of the hatch cover and the pin rails.

 

In the last photo, (dated 28/11/2011) the ship is varnished and all wood works completed. 

Next step  is the mast construction, the sails and the rigging.

 

post-3284-0-23055300-1366492507_thumb.jpg

post-3284-0-67467900-1366492508_thumb.jpg

post-3284-0-65818700-1366492505_thumb.jpg

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

Ian and Dave,

thank you!

 

Stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

Having finished the hull construction together with the all major superstructure features, it was time to start phase number two, and that was the construction of the masts, the sails and all relevant elements.

 

The details involved are many, even if you decide to build a "simple version"!

 

To start with,  I started making some blocks. Admittedly, they cannot be compared with the blocks made by some fine modellers in this forum,  but the whole process was fun, and at the end of the day, this is all about it. 

The process is relatively easy:

 

Drill holes on a strip of wood at constant intervals, then cut the strip into pieces. For example, if the gap of the holes is  say 3mm, I cut the pieces with the same gap, allowing the hole to be at the beginning of each piece.

The grooves shown on the blocks was made before drilling the strip. It does not really add to the functionality, but at a later stage it will help the string to look better when it will pass through the hole of the block.

 

Needless to say that a drill stand and a compound table are necessary to do such a job.

post-3284-0-98798800-1366559591_thumb.jpg

post-3284-0-75763800-1366559601_thumb.jpg

post-3284-0-90467100-1366559618_thumb.jpg

 

Another element of this process are the various multipurpose rings as I call them, because they will be used in various  situations, as is, or as part of a more complex construction.

In the picture below, you can see how a broken drill bit  is used to shape the rings:

I just coil around the tip (with the pliers) the brass wire.  the rings are ready to be soldered...

post-3284-0-87794300-1366559619_thumb.jpg

post-3284-0-48854800-1366559617_thumb.jpg

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

In the following sequence of pictures I tried to illustrate the bowsprit ironworks. (or to be accurate brass works!)

 

I did not have brass tube at the time to cut the collars, so I had to make them by myself.Not difficult really, I just coiled brass wire at the desired diameter, then soldered in order to become a solid ring. A little trimming with the needle files, and they are ready.!

 

Next drill four holes insert the rings, and solder them.

 

Once ready, fit on the bowsprit, blacken them.

Finally varnish the bowsprit. Not bad I guess...

 

post-3284-0-23821000-1366563560_thumb.jpg

post-3284-0-78743100-1366563570_thumb.jpg

post-3284-0-37028300-1366563585_thumb.jpg

post-3284-0-91623100-1366563596_thumb.jpg

post-3284-0-71824400-1366563606_thumb.jpg

post-3284-0-94995700-1366563619_thumb.jpg

post-3284-0-39562500-1366563633_thumb.jpg

post-3284-0-76899000-1366563650_thumb.jpg

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

...and while I was preparing myself for the next step, (the construction of masts and their paraphernalia),

I stepped back for a while and took some macro pictures.

 

I'm always fascinated from macro pictures as they give you an entirely different perspective.

Stelios

 

PS. for the record, the date was 24/12/2011

 

post-3284-0-58435000-1366748437_thumb.jpg

 

post-3284-0-48196300-1366748438_thumb.jpg

 

post-3284-0-63173300-1366748436_thumb.jpg

 

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

In the following pictures I try to portray the construction of various metal parts.

For some reason, when it comes to metal works ans soldering, I really enjoy it.

There is always room for improvement, the more I exercise, the better the outcome, (I like to believe). 

 

In the next four pictures, you can see how I make the rings, as I did not have tube available to cut. The principle is simple: coil the wire and then solder it. With some trimming it becomes a nice ring.

post-3284-0-17303900-1366749860_thumb.jpg

post-3284-0-06187200-1366749861_thumb.jpg

post-3284-0-98889800-1366749861_thumb.jpg

post-3284-0-86291600-1366749862_thumb.jpg

 

The methodology of the little ring construction was already mentioned.I just share a better quality picture. Anyway they will be used further below, so it is relevant.

post-3284-0-52271300-1366749864_thumb.jpg

 

Some wood work: the masts, sprits etc.

post-3284-0-65158700-1366749865_thumb.jpg

post-3284-0-08731400-1366749867_thumb.jpg

post-3284-0-77978900-1366749868_thumb.jpg

 

A small deviation to make my anchor; yes it is an ugly duck, but I love it, it is my first anchor!

post-3284-0-26199000-1366749872_thumb.jpg

post-3284-0-09953700-1366749859_thumb.jpg

 

In the following picture you can see various metal works, I think they are self explanatory.

post-3284-0-09142700-1366749889_thumb.jpg

post-3284-0-26022900-1366749890_thumb.jpg

post-3284-0-44741100-1366749891_thumb.jpg

post-3284-0-78816900-1366749892_thumb.jpg

post-3284-0-67350900-1366749893_thumb.jpg

post-3284-0-97739200-1366749894_thumb.jpg

post-3284-0-32580900-1366749896_thumb.jpg

post-3284-0-75371900-1366749897_thumb.jpg

post-3284-0-85145800-1366749887_thumb.jpg

 

Stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

What a fine looking model you are making Stelios.

 

Michael

Current builds  Bristol Pilot Cutter 1:8;      Skipjack 19 foot Launch 1:8;       Herreshoff Buzzards Bay 14 1:8

Other projects  Pilot Cutter 1:500 ;   Maria, 1:2  Now just a memory    

Future model Gill Smith Catboat Pauline 1:8

Finished projects  A Bassett Lowke steamship Albertic 1:100  

 

Anything you can imagine is possible, when you put your mind to it.

Posted (edited)

In today's economic environment, people need to be multiskilling (and sometimes) multitasking.

Oops, wrong forum!

What I wanted to say is that this hobby requires to develop many skills, one of them is to know how to use a Singer. Actually, I use an electric  sewing machine  made back in the early 60ties. the mechanical parts are line new. I only had to replace the motor, as after so many years, it simply died; it had lived beyond its normal life expectancy....

 

In the following pictures I try to portray the various steps, I think they are self explanatory.

Stelios

 

Notes:

  • The fabric in use is poplin.
  • The pencil marks were removed at the end my hand washing the sails with detergent.
  • the patches were glued with textile glue
  • the eyelets were mabe from black thread, hardened with some CA glue, to give the metal "feeling"
  • ah, yes, at the end I steam ironed them (that skill please do not share with my wife...)

post-3284-0-70249600-1366833648_thumb.jpg

post-3284-0-59001500-1366833649_thumb.jpg

post-3284-0-77471300-1366833650_thumb.jpg

post-3284-0-25665900-1366833652_thumb.jpg

post-3284-0-36232500-1366833653_thumb.jpg

post-3284-0-47218500-1366833654_thumb.jpg

post-3284-0-76876900-1366833655_thumb.jpg

post-3284-0-80568000-1366833656_thumb.jpg

post-3284-0-85504400-1366833647_thumb.jpg

Edited by stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

Stelios,

 

I am really impressed by what you are doing. Such nice details and historical accuracy, for me that is a big step too far. Thanks for these nice pictures.

 

Regards,

John

<span style='font-family: courier new'>In progress: <a class='bbc_url' href='http://modelshipworld.com/index.php?/topic/177-king-of-the-mississippi-artesania-latina-scale-180/'>King of the Mississippi</a></span><br />

<br />

<span style='font-family: courier new'>Completed : <a class='bbc_url' href='http://modelshipworld.com/index.php?/topic/176-mare-nostrum-4331-artesania-latina-scale-135/'>Mare Nostrum 4331</a></span><br />

<span style='font-family: courier new'><a class='bbc_url' href='http://modelshipworld.com/index.php?/gallery/album/51-16th-century-galeass-imai-scale-1160/'>16th century Galeass</a></span><br />

<span style='font-family: courier new'><a class='bbc_url' href='http://members.upc.nl/carla.en.john/Modelbouw/Rocket.htm'>George Stephenson Rocket Locomotive</a></span><br />

<br />

<span style='font-family: courier new'>Next build : sl Louise</span>

Posted

Stelios the sails look great, I am taking notes because it will be useful for me later.

 

michael

Current builds  Bristol Pilot Cutter 1:8;      Skipjack 19 foot Launch 1:8;       Herreshoff Buzzards Bay 14 1:8

Other projects  Pilot Cutter 1:500 ;   Maria, 1:2  Now just a memory    

Future model Gill Smith Catboat Pauline 1:8

Finished projects  A Bassett Lowke steamship Albertic 1:100  

 

Anything you can imagine is possible, when you put your mind to it.

Posted

John,

Thank you.I cannot tell if I'm accurate or not.  The truth is  that for this build I do not rush and I spend more time studying the details, which is fun actually!

 

Michael, I'm honored!

 

Stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted

The bowsprit.

The bowsprit is finally fit on the vessel.

In the next two pictures I just tried to make some double blocks, to be used to the guys.

I did not finally used them,(i did not like how they looked on the sprit) but the methodology I think is worth noticing.

 

The strip of wood with the little nail, is the jig to hold the small bits in place and attach the thread around.

 

Stelios

post-3284-0-08388300-1366915137_thumb.jpg

 

post-3284-0-53354100-1366915138_thumb.jpg

 

post-3284-0-07813000-1366915136_thumb.jpg

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Posted (edited)

Dear all,

I think that with this post I arrive from past to the present, as the picture from now on are considered as current.

 

In the following pictures another milestone is logged, and this is the installation of the main mast on the ship.

 

I decided just for fun, to show the details first, then the overall picture:

 

The dead-eyes ready to be fit on the shrouds.

In order to have an understanding about the dimensions, just note that the square on the mat is 1cm x 1cm.

post-3284-0-01183500-1366915852_thumb.jpg

 

The jig (spacer) used between the dead-eyes.

Nothing fancy, just to brass wires, in the shape of a staple.

NB. all my threads are waxed that's why you don't see any fibers coming out and around the thread.

post-3284-0-27070000-1366915853_thumb.jpg

 

The mast with the shrouds before the installation.

post-3284-0-86248200-1366915850_thumb.jpg

Edited by stelios

Current build: not decided yet.

 

Previous builds:

Traditional Greek vessel "Symiaki Skafi" (scratch)

Traditional Greek vessel "Perama" (scratch)

HMS Bounty (kit)

 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...