Jump to content
Supplies of the Ship Modeler's Handbook are running out. Get your copy NOW before they are gone! Click on photo to order. ×

Recommended Posts

Posted

Before moving on to making and adding the boomkins I decided I should add both the jibboom and flying jibboom so the fore topsail and fore topgallant stays could be rigged.

 

The first two photos show the jibboom and flying jibboom in place.

001.thumb.JPG.b82d6669418b3be7947dcdf4d9499e4a.JPG002.thumb.JPG.9a52f1507fc993b7c200d8a8ac7008ff.JPG

The dolphin striker was also added. As you will note, when looking at the photo, I made an error with where the fore topsail sail stay should be reeved. I used the upper hole rather than the middle hole. I only realised this error after I had added the thimble to the stay end. I concluded that I could accept this mistake rather than running in a new stay.

003.thumb.JPG.c2687ad40419cf376d2f785f0732adfd.JPG

Both stays are belayed using thimbles, with the reciprocal thimbles for each stay hooked to eyebolts on the bow, as can be seen in the next photo.

004.thumb.JPG.9a541c86bee6c1eb6aaa92e57678a2e1.JPG

The next photo shows the foremast with the all the various mast stays in place.

005.thumb.JPG.a52be192eff3722ee40bc808ab1e2873.JPG

The final photo of this post shows the current status of the Harpy rigging.

006.thumb.JPG.250ce30f0e55d675a835b9d55208b631.JPG

Glenn (UK)

Posted

The two boomkins have now been added. It was a simple task to cut and shape two lengths of 3mm dowel as per the plan sheet. Once painted they were glued in place. The shroud were added along with the 5mm single blocks.

001.thumb.JPG.1a80586002a31cf896bc4ba702c5d52b.JPG002.thumb.JPG.618899ba028bdac1d82887b5bd87862c.JPG003.thumb.JPG.a6197d041d41ddaba3ef2462088378a0.JPG

The boomkin shrouds were added, as shown below. Can you spot the error I made?

004.thumb.JPG.e6d8f4c63cfaf788a16387572e6c36e6.JPG

The next photo shows the error. The green arrow shows what I did right. The three red arrows shows where the various shrouds should have been placed. Thankfully, as far as I am concerned, it does not matter as no one will notice this once the model has been completed.

005.thumb.JPG.ab4f5f8d17786fbe25ebed2be68ffdf1.JPG

Glenn (UK)

Posted

I spent a bit of time yesterday belying the rigging that had been run in, some of which can be seen in the first three first photos below.

001.thumb.JPG.6f4f51a8f046557a56a5526651b50028.JPG002.thumb.JPG.4281fc49f88abf59b450aa1b41f56bc7.JPG

003.thumb.JPG.8b62f21f4aa8d3973187282f01b8470e.JPGWith the jibboom and flying jibboom added their respective shroud rigging were next to be added. I opted to use hooks to secure these blocks to the bow for ease of installation, as can be seen in the two photo below, noting the plan sheet shows these blocks should be seized directly to the eyebolts. The free ends of the inter-block rigging will be belayed to pins located on the bow inner bulwark belay pin racks.

004.thumb.JPG.5831002f5a534e5c4f0457dcddd5584b.JPG005.thumb.JPG.aa95032e2bc3db25b10f741892267673.JPG

The shrouds are also feed through eyelets located on the spritsail yard before being secured to the ends of the jibboom and flying jibboom.006.thumb.JPG.93559ab9eedaf9b7727abf4fa2689da1.JPG

 

 

Glenn (UK)

Posted

This post details the method I have used to rig the topsail sail tyes.

 

As can be seen in the first two photos below the rigging is fed through a double block on the topsail yard and is the reeved through a single block located on the topsail platform. The rigging is then belayed to the deck via two 5mm single blocks.

001.thumb.JPG.9723bbd579733cee2a9a142151355289.JPG002.thumb.JPG.275114873a4db337394a4c146a993c8c.JPG

Starting with the upper 5mm single block the tye thread is held in place as the block seizing is added as shown by the red arrow in the photo below.

003.thumb.JPG.6f0b40131c00122084650953504eb0e7.JPG

The lower thread is then added, held in place with a reef knot.

004.thumb.JPG.c3163e3ffa4a17c4873e636a2571c18c.JPG

The lower thread is then held in the quad hands so the seizing can be added,

005.thumb.JPG.e2ccdb483e7d4a539ed7ecfea8d98496.JPG

The block is then reversed so the seizing can be added to the upper tye thread.

006.thumb.JPG.ae4f175a2e2fe9f19bac6cfa08e8e261.JPG

The completed upper 5mm block is shown in the next photo.

007.thumb.JPG.d6591a40e47d0baec0b206dcb07b5216.JPG

These threads are then reeved through the 3mm single block and the 4mm double block, the 4mm block is shown in the photo below.

008.thumb.JPG.d1a99576f9d8727535ddcadff66338bb.JPG

A length of thread is then seized around the lower 5mm single block.

009.thumb.JPG.46d69f0be7e131e807f5a258501985b3.JPG

An eyebolt is then added to the thread, using a template to set the distance between the eyebolt and single block.

010.thumb.JPG.b8d40fac7b0aeb1992ab8e07cdaf0971.JPG

The next set of photos shows the completed rigging.

011.thumb.JPG.804d1fbb8055968c824ef8b1f15140ba.JPG012.thumb.JPG.268c9bdbb463de89cea33336ea643fa1.JPG013.thumb.JPG.c37eceb3f1fd4f56b320d11981820001.JPG014.thumb.JPG.f8d18e5e9d656f72a9b182fd711ff2b7.JPG

Glenn (UK)

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...