Jump to content

Seamanpeter

Members
  • Posts

    68
  • Joined

  • Last visited

2 Followers

About Seamanpeter

  • Birthday 03/06/1948

Profile Information

  • Gender
    Male
  • Location
    Luton UK
  • Interests
    sailing, building RC ships, playing chess.

Recent Profile Visitors

1,719 profile views

Single Status Update

See all updates by Seamanpeter


  1. It has been a while due to domestic problems home and other issues but I'm back and want to finish the built.

    I did some other changes as well as you will see on the pics, made the bow nearly massive and also around the bow trust as to me looks like this is a weak point and I want to keep this built for years to come.

    Anyway, presently I have done the hull, closed it up so no holes inside and now use filler, sanding, filler and again sanding until I have a smooth surface to apply the first paint on it. 
    The deck will be started afterwards like accommodation, mast (still not content with the mast present), Schottels propulsion back as bow trust already mounted. 

    So completely sit still I haven't but not worked as frequently I want to be.

    Going at the UNI now to get my BSc is another target I want to achieve, I know people say I'm crazy with 71 going back to school but I want to do something with myself and this is keeping me busy, no time getting Alzheimer too and having my Master already just want to have this done too in 4 years time incl the foundation. 

    Also having a night job so it will keep me going so to speak but still want to do my built and hopefully it will be done by next year.

    I will put some pics here too with explanation what I have done and hope you enjoy it in the same way I did make.20190506_134722.thumb.jpg.3dd3d0bb7a35f3ce56cedd7ec6b99bb8.jpgLast time I was here and upload this pic.

    20190917_194000.thumb.jpg.64deb68aafe57cb6a24a5531416dc1ec.jpg

    Made the bow itself out of a massive part to have more strength in there.

    20190917_194020.thumb.jpg.d36ed65ab1af7d4e2236079048160190.jpg

    Raw shape of the bow to allow the hull plates glued on to it.

    20190918_111004.thumb.jpg.c8784db51ae95893a488888d52d45816.jpg

    Also the bow trust surroundings with massive wood for strength and support.

    20190918_131902.thumb.jpg.0ca902363a1658e60d40c56e17092843.jpg

    Applied glue on the wooden support blocks

    20190919_115241.thumb.jpg.1767559447456d294a269f83b979c77c.jpg

    Raw building port side and you see the block wood I made the massive parts out.

    20190920_092132.thumb.jpg.10ecab11a4956fee611216e1e6c837e9.jpg

    Coming there after works and glued parts there but still needs more work to be done

    20190920_092144.thumb.jpg.0d0f6c72f06000bcbcd15d61ded3ffc1.jpg

    As she is still on the slip the bow comes to getting shape.

    20190920_092154.thumb.jpg.ffcfd7fa39b4f36ef8d95f3c43daa55c.jpg

    Also starboard side is coming to be in shape

    20190920_092321.thumb.jpg.b70709f4991cec477cc390d685836e83.jpg

    bow trust itself (without motor) in place and secured

    20190921_200954.thumb.jpg.c166cc87def9b0c025eaea94edc6c39d.jpg

    Closing up the bow part

    20190927_111420.thumb.jpg.0af6baa313e53fb48c60431e572de8c3.jpg

    After both parts finalised and applied first time filler by finger to close all holes

    20190927_111430.thumb.jpg.82920f59b06a19309392655352f6fa3a.jpg

    Also port side and did both sides anchor pockets protection and bow trust water line the flow of water afterwards

    20190927_111442.thumb.jpg.2304500055be737b23a166ef50a31976.jpg

    Bow is looking good but all in a raw stadium as need a lot more works to be done

    20190927_111451.thumb.jpg.63e617948345c50bfc26a6b4487f42b1.jpg

    Also the hull itself is going fine and connection to the kim is also done

    20190927_111511.thumb.jpg.9ec8069071f08a1df668564e17fc931d.jpg

    same on the starboard side the filler just applied for the first time

    20191003_065335.thumb.jpg.b579cfa65065aef33a4a645e19fcb7a9.jpgHull and bottom plate applied filler also the kim plates

    20191003_065346.thumb.jpg.df45cd07730dbd04f46ba7c2ab2640d7.jpg

    Not a direct sharp picture but you can see the hull and bottom connected by the kim

    20191003_065425.thumb.jpg.3f86dad467b1b28b3223c846db5a21d9.jpg

    You can see the lines already of the bow part. Not sure if I want to make the protection on the sides but guess I will go for direct rubber covers.

    20191003_065439.thumb.jpg.e0626a5487fccffc0e5aa75ec9566cdf.jpg

    Aft part raw done but need more attention

    20191003_065740.thumb.jpg.e59968f633b11dafa7604997e24e38c5.jpg

    Will have the roller in later and if having place under the deck built towing pins.

    20191003_065805.thumb.jpg.97197f79b22265d675db7865c94c9302.jpg

    Also the towing winch will be built in later

    20191003_065819.thumb.jpg.ee39aaa91411edf9abad25e814b0c8e6.jpg

    Railing works will be done when hull finished and accommodation sanded

    20191005_213722.thumb.jpg.64bcdc3e5ebfbbd3fe08e9f4e17f1206.jpg

    After first time sanded the hull and surroundings, looks good already

    20191006_075532.thumb.jpg.80d2469eb6d70035497cdf6c34dd8eb1.jpg

    Also starboard side coming there

    20191006_075552.thumb.jpg.991fdf77d962e5ef9858f02edbbe2de8.jpg

    Included port side but still needs more filler and sanding

    20191006_075611.thumb.jpg.a6d589cd4e5f3ea1d2f747143a8c09e1.jpg

    Even not standing and taking the picture direct in the center line of the vessel the bow looks good.

    20191006_080053.thumb.jpg.a940593c128a70c99dc2028f29237c9e.jpg

    Bow trust engine mounted and secured waiting to connected

     

    1769_Schottelantrieb_III_01.jpgSchottels I'm going to use.

     

    Just an update till now.

    Already informed you that it will go slower as expected but still doing works to it.

    Did the sanding accommodation and bridge.

    Changed also the uptake stairs / ladders to the helideck as was not content with it, now looks much better.

    Also received the railing and can imagine how it looks wenn all mounted but will be something on both sides of the stairs to!

    Having just 3 pics to go with this update.

    But this all for the next weeks or so to start and finalise with that.

    Wish all of you a great time, X-mas is just around the corner too.

     

     

    20191019_224139.jpg

    20191019_223926.jpg

    20191019_224005.jpg

    Having the last pics of the built.

    Made / altered the mast, made from a round piece of wood and by hand in the shape I like.

    Also the railing on the border/platform made but need to drill the holes for it, it gives you an idea how it will be.

    Then the kim keels made and permanent glued to the built. 

    Was not an easy job as could not get them in the side I want so had to be altered by  hand but it looks good and hopefully it will work to not to have the Boka Alpine rolling that much in the water later.

    Have a great day and weekend.

    Peter.

    20191024_164115.jpg

    20191024_164039.jpg

    20191024_164022.jpg

    1. SHIPSCAT

      SHIPSCAT

      Hello Peter

       

      I have missed your posts but I am pleased you are back now in your shipyard.

       

      I hope your domestic problems are not serious and you have overcome them.

       

      You have done a lot of work on your ship she looks fabulous.

       

      Jo.

    2. Seamanpeter

      Seamanpeter

      20191108_163331.thumb.jpg.a60fddacecf08c2791e14623dab8eaf3.jpg20191109_193228.thumb.jpg.bf9b5b723267b87cb1a96837c4a0205d.jpgHello all,

      not much done then just the fore mast.

      Still waiting for spares / parts to arrive but they already did inform me the delay as some are out of stock.

      Made last week some more orders but they have to be made as those are mostly 3D and that takes its time and also all in scale 1:75.

      The deck cranes I have on order 2 x and will also make the "buckle" crane on ps aft deck for later the ROW and other equipment to handle. Those cranes (all 3) will be remote controlled.

      The helicopter on order and will be having it's own remote so it can land and take-off from the helideck.

      Mainly those are the inventaris on the bridge deck like chart table, consoles, chairs etc.

      Also some equipment going on the Monkey Island and between the funnels.

      Also the towing winch what comes out USA will take its time.

      Waiting for more info about the Schottels as already waiting 3 weeks and hopefully they will be here before X-Mas.

      Anyway, as weather conditions are zero cannot do anything outside so just working slowly day by day in between "Home work" UNI and my work finding some time to make some small issues to my built.

      Have a great day all and will revert.

      (Just image some parts I have on order already)

      Peter

      20191108_163015.jpg

      20191108_163038.jpg

      20191108_163104.jpg

      20191108_163141.jpg

      20191108_163208.jpg

      20191108_163229.jpg

      20191108_163727.jpg

      20191108_163411.jpg

      20191108_163851.jpg

      20191108_163932.jpg

      20191108_183113.jpg

      20191108_183819.jpg

      20191109_193228.jpg

      20191109_193246.jpg

       

       

      20191114_132841.jpg

      mm size schottel component.jpg

×
×
  • Create New...