Jump to content

Norwegian Plastic

Members
  • Posts

    126
  • Joined

  • Last visited

Everything posted by Norwegian Plastic

  1. Tonight was decal-time. Big milestone for the project because this was the last part to be added before I start on the ropes and gaffs/booms. The kit decals were not stored well and were both shabby and bent. Had a local company scan them and make pre- cut letters. The Syren rope will arrive in a month or so and a break in the project will occour…
  2. Today I added the life buoys. Not perfect but better than sugested in the instructions where they where supposed to be tied to the railings…
  3. Well, I gave up on the fiber, they were hard to bend in the restricted room inside the mast. Used 3 mm flathead leds inside the lanterns and soldered a 2 mm brass tube wich cables are running trough.
  4. Working on the lanterns, they need some more sanding so I have to repaint them…
  5. Getting crowded in there. Still 3 more servo’s and battery for lightning and the pump, buck converters and pwm for the flow of cooling water to install. All lightning in lanterns will be fed with 1 mm optic cables and central lightning will be yellow leds. Rudder and motor is installed and working😃 IMG_4994.MOV
×
×
  • Create New...