Jump to content

Dutch HWS

Members
  • Posts

    3
  • Joined

  • Last visited

Posts posted by Dutch HWS

  1. On 10/17/2021 at 6:51 AM, RGL said:

    Superstructure dry fitted, painted and weathered. 

    8190CEEC-6724-4190-9EC9-33627AC4BA45.jpeg

    F4D104AB-3272-47B1-88E6-51F57970AD7B.jpeg

    73180C93-8FD5-4AD9-A511-16D8E257A8D0.jpeg

    3A658F38-1881-42A0-9E66-69A47A3B0131.jpeg

    7EF0CD49-5552-4690-BA5A-12993BE9D697.jpeg

    720D2DF3-3B25-4BFD-9E88-1DCC44822B10.jpeg

    C47CEB12-350C-4450-B5B7-48C12D56441C.jpeg

    4C6CD4D5-0CF5-4A64-8192-6DB602515E80.jpeg

    Hi guys, I was wondering where and how the crew would accesss the bridge (Trumpeter part E3) from the inside of the ship.  So I could drill a hole at the right spot and place an inclined ladder?

    Would that be feasable? Could you help me here? Thanks a lot already.

  2. Thanks for welcoming me into this group.  This post is a true goldmine of tips and expertise by RGL and so many others. Beautiful.

    The hull looks great with the plating effect. I was wondering if you leave the yellow or in this case red tape bands along the hull after you apply the grey primer coat? Or do yo remove it and hope the primer edges give the desired plating effect? Could you advise me how to achieve the plating effect? Thanks already for your help.   Friendly regards, From Dutch HWS, 

     

×
×
  • Create New...