Jump to content

US Brig Niagara by Usgecko - Model Shipways


Recommended Posts

The first two lengths of planking attached to the outside of the hull progress!

IMG_0177.JPG

IMG_0178.JPG

IMG_0179.JPG

Link to comment
Share on other sites

  • 1 month later...
Posted (edited)

Started on the planing for the ceilings - on both inner and outer sides of the hull. I elected to cut them individually so progress has been slow

 

IMG_0185(1).jpg

I attached the planks directly to the hull at the bow, rather than pre-fabricating them as I have above

 

IMG_0183(1).jpg

IMG_0184.jpg

Edited by Usgecko
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...