I have fitted the reefing tackles to the foremast topsail yard, but am having difficulty determining how the running part (hauling part) of the tackle is belayed for HM Bark Endeavour as of 1768/1770.  

 

According to the AOTS, there is a simple statement (callout number with comment)  that it is belayed at the associated Top.  The running rigging belay plan does not show the belay point.  Earlier diagrams for the Top indicate two eyebolts in the after part of the Top (located just aft of the lubbershole) on either side of the mast.  However, from what I can determine these are for the Topgallant Tye tackle?

 

Can anyone point me in the right direction please.  Peterson is too early to use as a reference and I cannot find anything in Lees (yet).

 

cheers

 

Pat

If at first you do not suceed, try, and then try again!
Current build: HMCSS Victoria (Scratch)

Next build: HMAS Vampire (3D printed resin, scratch 1:350)

Built:          Battle Station (Scratch) and HM Bark Endeavour 1768 (kit 1:64)

Link to comment
Share on other sites

Hi Banyan;

 

I have had a look in Lees and Marquardt,  and both of them say that the reef tackle fall led down to the deck. 

 

All the best,

 

Mark P

Previously built models (long ago, aged 18-25ish) POB construction. 32 gun frigate, scratch-built sailing model, Underhill plans.

2 masted topsail schooner, Underhill plans.

 

Started at around that time, but unfinished: 74 gun ship 'Bellona' NMM plans. POB 

 

On the drawing board: POF model of Royal Caroline 1749, part-planked with interior details. My own plans, based on Admiralty draughts and archival research.

 

Always on the go: Research into Royal Navy sailing warship design, construction and use, from Tudor times to 1790. 

 

Member of NRG, SNR, NRS, SMS

Link to comment
Share on other sites

Thanks Mark and Frankie; much appreciate your responses.

 

I have rechecked the AOTS (by Marquardt also) and again all that is said is  "belays at Top"  - so I think I will go with that - saves me a bit of rigging  also :).

 

Frankie, that is a good solution; I will see if I can achieve that as it is a bit fiddle to reach in there but I should be able to do it.

 

Many thanks again

 

Pat

If at first you do not suceed, try, and then try again!
Current build: HMCSS Victoria (Scratch)

Next build: HMAS Vampire (3D printed resin, scratch 1:350)

Built:          Battle Station (Scratch) and HM Bark Endeavour 1768 (kit 1:64)

Link to comment
Share on other sites

Hi Pat If it might help, have a look in this for how the replica does it.

I think that 20.6 is one one of the ropes you are talking about.

 

http://juwarki.org.au/wp-content/uploads/2012/03/VC-Man-final.pdf

 

And if I follow you correctly I think it is no 61 you are talking about.

 

Hooroo Chris

Link to comment
Share on other sites

Thanks Chris, yep it is 61; interesting they also bring it down.  Unfortunately for my rigging plan, I have been following the AOTS whom utilise these shroud cleats in a different sequence and it is already taken up.  More to ponder.

 

Appreciate your input, very useful.

 

cheers

 

Pat

If at first you do not suceed, try, and then try again!
Current build: HMCSS Victoria (Scratch)

Next build: HMAS Vampire (3D printed resin, scratch 1:350)

Built:          Battle Station (Scratch) and HM Bark Endeavour 1768 (kit 1:64)

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...