Mike 41 got a reaction from Archi in HMY Fubbs 1724 by Mike 41 - Scale 1:48 - second rebuild
This is a few photos of the stern section. I still need to add the figures.
-
Mike 41 got a reaction from Archi in HMY Fubbs 1724 by Mike 41 - Scale 1:48 - second rebuild
This is a few pictures of the quarter deck galleries. I had a lot of trouble with the carvings they looked so bad I went with a simpler design.
-
Mike 41 got a reaction from Archi in HMY Fubbs 1724 by Mike 41 - Scale 1:48 - second rebuild
This set of phots shows the gun port wreaths installation. I decided to postpone the frieze and other decorations until the hull is complete.
-
Mike 41 got a reaction from Archi in HMY Fubbs 1724 by Mike 41 - Scale 1:48 - second rebuild
This is a few more photos of the planking she is starting to look like a Carnival cruise ship. LOL
-
Mike 41 got a reaction from CiscoH in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Cap Rail and Bulkhead Break
The cap rail with gold molding was added next. The bulkhead break pieces were precision laser cut and fit very well.
-
Mike 41 got a reaction from Archi in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Cap Rail and Bulkhead Break
The cap rail with gold molding was added next. The bulkhead break pieces were precision laser cut and fit very well.
-
Mike 41 reacted to mugje in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
That looks beautiful!
-
Mike 41 got a reaction from mugje in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Thanks, Mugje! The kit contained a large variety of woods that makes the model colorful.
-
Mike 41 got a reaction from gjdale in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Cap Rail and Bulkhead Break
The cap rail with gold molding was added next. The bulkhead break pieces were precision laser cut and fit very well.
-
Mike 41 got a reaction from Archi in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Poop Deck lining, Hull painting.
I used Myrtle wood for the lining and dark blue paint for the hull painting.
Progress photos.
-
Mike 41 got a reaction from gjdale in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Poop Deck lining, Hull painting.
I used Myrtle wood for the lining and dark blue paint for the hull painting.
Progress photos.
-
Mike 41 got a reaction from CiscoH in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Tiller
This is a few photos of the tiller installation.
-
Mike 41 got a reaction from Archi in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Tiller
This is a few photos of the tiller installation.
-
Mike 41 got a reaction from gjdale in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Tiller
This is a few photos of the tiller installation.
-
Mike 41 got a reaction from DocBlake in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Tiller
This is a few photos of the tiller installation.
-
Mike 41 reacted to DocBlake in Royal Yacht HMY Fubbs 1682 by DocBlake – 1:24 Scale - Stern Section
I finally got around to starting the glue up. I used double sided tape to tape the fore side of frame 25 to the template sheet and glued part 25A to it. This was followed by 26 and 26A. The floor frames (25A, 26A, 27A etc.) rest directly on the keel up until frame 32. The futtock frames sort of "float" above the keel, sandwiched in by the floor frames in front and behind them. The "offset" of these frames is important in establishing the shape and esthetics of the hull.
Jodie's build log explains this well. The distance between the bottom of frames 26 and 27 and the keel is supposed to be 7.4mm and 11.0 mm respectively. Mine were very close to those numbers. So far, so good!
-
Mike 41 got a reaction from CiscoH in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Rudder
The rudder consists of five CNC cut pieces that fit very well together very well. The rudder and stern post needed to be beveled at 45 degrees and the top of the rudder needed to be trimmed and shaped at the poop deck.
Progress photos.
-
Mike 41 got a reaction from CiscoH in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Settee
The settee was built next. The construction is fairly simple. This is a few photos of the assembly.
-
Mike 41 got a reaction from gjdale in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Settee
The settee was built next. The construction is fairly simple. This is a few photos of the assembly.
-
Mike 41 got a reaction from Archi in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Settee
The settee was built next. The construction is fairly simple. This is a few photos of the assembly.
-
Mike 41 got a reaction from CiscoH in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Poop Deck
The poop deck clamps were installed next.
The deck framing was constructed in three sections to allow viewing of the great cabin interior.
The bulkhead break was assembled and set in place to verify elevations.
Progress photos:
-
Mike 41 got a reaction from Archi in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Poop Deck
The poop deck clamps were installed next.
The deck framing was constructed in three sections to allow viewing of the great cabin interior.
The bulkhead break was assembled and set in place to verify elevations.
Progress photos:
-
Mike 41 got a reaction from gjdale in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Poop Deck
The poop deck clamps were installed next.
The deck framing was constructed in three sections to allow viewing of the great cabin interior.
The bulkhead break was assembled and set in place to verify elevations.
Progress photos:
-
Mike 41 got a reaction from DocBlake in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Poop Deck
The poop deck clamps were installed next.
The deck framing was constructed in three sections to allow viewing of the great cabin interior.
The bulkhead break was assembled and set in place to verify elevations.
Progress photos:
-
Mike 41 got a reaction from rlwhitt in HMY Fubbs 1682 by Mike 41 - FINISHED - Weasel Works – Stern Section – 1:24
Poop Deck
The poop deck clamps were installed next.
The deck framing was constructed in three sections to allow viewing of the great cabin interior.
The bulkhead break was assembled and set in place to verify elevations.