Jump to content
DONATION DRIVE - SUPPORT MSW - DO YOUR PART TO KEEP THIS GREAT FORUM GOING! ×

Recommended Posts

Posted

I've reached a point in my build where I need to make a lot of slings to connect blocks & pulleys.  I don't know how to make a sling.  The picture in my document isn't clear enough to determine how to tie a sling (item C in the picture).  I would also like to know what knots I need to learn for rigging in general.  

 

scan22.jpg.6427d9a4150aa6ad629e3b50dee72463.jpg

Posted

To strop your block, take your line and lay it around the block. Pull tight and place the block in a spring clamp to hold tight and maintain tension. Place the two line ends in another clamp to maintain tension One end of the line cut to about 1/2 to 3/4 the desired length to your bolt. The other end keep long for the moment. Using thread tie a series of square knots, 3 or 4, to fasten/splice the two ends tightly together to fix the block in place. Hit with pva diluted 1 to 1 with water. Let dry. Then take your long end through the bolt and turn back towards block. Fasten with 3 to 4 square knots. Hit with the pva water mix and let dry. Trim as desired Your done.

Rich

On the workbench: The bomb vessel Carcass 1758. Nelson sailed on her in 1773 as a midshipman during England's first Polar expedition.

Completed scratch build: The 36 gun frigate "L'Unite" 1797. Nelson briefly commanded in 1801.

Completed scratch build: The armed brig "Badger" 1777. Nelson's first command

Completed kits: Mamoli "Alert", Caldercraft "Sherbourne"

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...