Jump to content

Tie down for boat on davits


Recommended Posts

Mark
"The shipwright is slow, but the wood is patient." - me

Current Build:                                                                                             
Past Builds:
 La Belle Poule 1765 - French Frigate from ANCRE plans - ON HOLD           Triton Cross-Section   

 NRG Hallf Hull Planking Kit                                                                            HMS Sphinx 1775 - Vanguard Models - 1:64               

 

Non-Ship Model:                                                                                         On hold, maybe forever:           

CH-53 Sikorsky - 1:48 - Revell - Completed                                                   Licorne - 1755 from Hahn Plans (Scratch) Version 2.0 (Abandoned)         

         

                                                                                                                                                                                                                                                                                                

Link to comment
Share on other sites

No...that was the other part -the pudding spar. The outline is of the attachment to the straps that criss-cross the boat. Its the low resolution that make this hard to see. I think the white part on the end is a 2 purchase block. How was the rest of it is made is the question. Is it just a thick rope with an eye in the end?

Link to comment
Share on other sites

TS,

Hard to say, but to my (poor) eyes, it looks to be a single block tied to the davit, with the line running to the double block and back to the single, before running back outboard and finally being tied off to the davit, with lots of running line left to belay out and loosen the strap.

Carl
 
 
Completed builds: AL Bluenose II 1:75  Gallery
                              Amati Hannah SIB 1:300  Gallery
 
Current Build: Bluenose II - SIB - unknown scale

Link to comment
Share on other sites

Does this make it easier for you? The block seized to the davit could be either single or double - usually double.

post-18517-0-43726300-1428598338_thumb.jpg

Edited by Tallshiptragic

Anton T

 

Current build

1/78 Sovereign of the Seas - Sergal - kit bashed

1/72 Arleigh Burke class DDG flight iia/iii - Sratch built RC - no log

 

Waiting for further inspiration

STS Leeuwin II 1/56 scratch built (90% completed)

 

Previous builds - completed

1/72 HMAS Brisbane, Airwarfare Destroyer 2014 -Scratch built RC - completed

1/64 HMS Diana 1796 - caldercraft kit - completed

1/75 Friesland 1668- mamoli kit - completed

1/96 HMAS Newcastle FFG 2011- scratch built RC - completed

1/75 Vasa - Billing Boats - completed

Link to comment
Share on other sites

Looks to me like bowsing tackle. Used to keep the lifeboat alongside the ship when embarking. It is eased out and cast off immediately prior to lowering the boat.Typically though, it is two double blocks.

 

Andy

Quando Omni Flunkus, Moritati


Current Build:

USF Confederacy

 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...