Jump to content

Recommended Posts

Posted

I saw this model and wanted to put it on my build list since these boats frequented Hampton Roads where I grew up. I also spent time on one of these boats that the Virginia Institute Marine Science chartered while we studied the changes that hurricane supplied freshwater had on the local rivers and Bay.

 

Having some unexpected time off from my part-time job, I decided to start this model for my second build.  I was a little concerned because I only saw one build log for the box stern and the log only documented part of the build. The kit arrived with an instruction manual (just pictures with no detail building instructions) and drawings along with a material list and supplies. I spent time reviewing the material list and handwritten changes to the list that didn’t jive with the material supplied. The material question was 1/16 x 3/8 strips of Balsawood, which is readily available so I don’t expect to have a problem.  Review time ~1.5 hours IMG_6379.thumb.jpeg.7468fee75f5fef26165d9711b0f2397d.jpegIMG_6378.thumb.jpeg.b651323dc2317ec6b1062b61e9c4568c.jpegIMG_6380.thumb.jpeg.88a494641d81f18bb87395e4ca5c0c31.jpeg

Posted (edited)

I built a table which allowed me to clamp the keelson for this part of the build. Installed the bow stem, bulkhead and the transom to the keelson. The plans called for floor frames number 1 and 4 to be installed first so that they align to the chine. I glued the chine to the bow stem, # 1 and 4 frames and the transom.  Time for this build ~3 hours.IMG_6390.thumb.jpeg.6a38e938dfd22cbff3153d08347c54cb.jpegIMG_6392.thumb.jpeg.2f2e50060ab48c41d3ad8a7e423b0729.jpegIMG_6393.thumb.jpeg.fece8b0c420ff6ca8afa7bd39e2e30b3.jpeg

Edited by LJC
Posted

Cut floor frames for the other 4 members which had to be individually fit to the chine on the port and starboard side. Positioned and glued remaining frames to the keelson and chines.  Several of the floor frames were high so were plained down so the floor will lie flat.   Next, the 2 pieces of the deck were joined with a cross brace at the bulkhead and at the transom. Positioned and glued the deck to the bow stem, bulkhead and transom.  Shaped the keel to fit flush to the keelson and glued. 

Cut and glued individual deck supports at each floor frame. The angle and position of these braces relative to the edge of the deck needs to be consistent so that when all planks are attached, their position relative to the deck is consistent.

Installed one 1/2” hull plank to each side. In review of material provided, determined that 1/8” wide strips were provided instead of 3/8” wide. I will need additional 24” strips of 1/2” or 3/8” wide to complete the hull planks.   Time for this build ~4 hours.IMG_6394.thumb.jpeg.8d746c64c900f10e9d9128ad8c1f1199.jpegIMG_6395.thumb.jpeg.9aa5b5d9d0badc91dd48ffcde5e550d9.jpegIMG_6396.thumb.jpeg.ba8c1de703f0772bd1eee74c6c340268.jpegIMG_6397.thumb.jpeg.746b57a475f09fb6f9b2c60080c303ac.jpeg

Posted

Looks like you're off to a great start! Very cool to be able to model something you have a personal connection with. Wye River seems to make some very interesting models.

Posted

Nice start on your workboat.  I really like these Chesapeake workboats.

Ryland

 

Member - Hampton Roads Ship Model Society

            - Ship Model Society of New Jersey

               - Nautical Research Guild

       

 

Current Build - Armed Virginia Sloop, 18th Century Longboat

Completed Build - Medway Longboat

Posted

Nice looking project to work on.  

 

Following along with the log.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Robert Chenoweth

 

Current Build: Maine Peapod; Midwest Models; 1/14 scale.

 

In the research department:

Nothing at this time.

 

Completed models (Links to galleries): 

Monitor and Merrimack; Metal Earth; 1:370 and 1:390 respectively.  (Link to Build Log.)

Shrimp Boat; Lindbergh; 1/60 scale (as commission for my brother - a tribute to a friend of his)

North Carolina Shad Boat; half hull lift; scratch built.  Scale: (I forgot).  Done at a class at the NC Maritime Museum.

Dinghy; Midwest Models; 1/12 scale

(Does LEGO Ship in a Bottle count?)

 

Posted

I finished installing hull planks using 1/8 inch strips cut down to fill the gaps. I’m not sure how much time to spend trying to cut strips to fill or should I just use model filler. Build time ~1 hour.IMG_6423.thumb.jpeg.761e88ec9d659e9b49c5598451c56611.jpegIMG_6424.thumb.jpeg.a5b1929a2c7e5522deaf61d5bd961461.jpeg

Posted

My humble opinion (and limited experience): I think cutting the filler planks for larger areas like you did in the top photo of the topic #11 is the better way to go.  That is because I get too carried away with applying filler in gaps and end up with a mess.  Your results may vary. I just think it's worth the time.

 

The bottom photo in topic #12 where you see the filler 'plank' looks very nice to me and will probably need minimal sanding to smooth it out. 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Robert Chenoweth

 

Current Build: Maine Peapod; Midwest Models; 1/14 scale.

 

In the research department:

Nothing at this time.

 

Completed models (Links to galleries): 

Monitor and Merrimack; Metal Earth; 1:370 and 1:390 respectively.  (Link to Build Log.)

Shrimp Boat; Lindbergh; 1/60 scale (as commission for my brother - a tribute to a friend of his)

North Carolina Shad Boat; half hull lift; scratch built.  Scale: (I forgot).  Done at a class at the NC Maritime Museum.

Dinghy; Midwest Models; 1/12 scale

(Does LEGO Ship in a Bottle count?)

 

Posted

Individually fit bottom planks. Fitting planks for the bow will require soaking and shaping. I did that with 2 planks and it seemed to work. I’m pleased with how the bottom looks,  hope it won’t be too hard to trim all the overhang. I don’t think it will need much filler.  I’ll work on the bow next. Build time ~2.5 hrs

IMG_6432.thumb.jpeg.382c23bb0c80a745d786c15644f4074d.jpegIMG_6433.thumb.jpeg.3ac49b5426fbdd7994246249d13c349e.jpegIMG_6434.thumb.jpeg.e3c6c7690431175831229041bd5ef8ad.jpegIMG_6435.thumb.jpeg.d4f0c5e3703d1b9c8830e4af758c82c5.jpegIMG_6436.thumb.jpeg.169a989bb1d8916fa09b53407866f80d.jpeg

Posted

This model build looks similar to my Skipjack kit from Wye River. Same type of construction done around the Chesapeake around the 1800 -1900s.  My kit came with a similar assortment of wood and miscellaneous parts. The plans were in the “The Skipjack” book by Steve Rogers. Many colorful photos in the step by step instructions. 
 

I purchased this “kit” to hone my skills before attempting to build a 48” Skipjack from Calvert Museum and SIMBC.

 

 I modified the Wye River plan to convert it for Radio Controlled sailing.

Posted

Installed final planks at the bow. These required soaking with a twist to fit properly. The last plank installed was custom fit from a wide piece of scrap. After sanding, I filled some gaps. More filler and sanding needed. Build time 2.5 hours.

IMG_6457.thumb.jpeg.0b5a41b92900de0badf07177ea6e5034.jpeg

 

Posted

Next step is building the cabin. And looking at the instructions that’s all there was “build the cabin.“ Needing to have the cockpit floor installed before the cabin, I fit that and stained it using Graystone (General Finishes). I also stained the interior hull Aged Barrel (Minwax). I’ll need to clean up the bleed through on the outside of the hull.  Build time 1 hour.

IMG_6448.thumb.jpeg.135040ebc42edd9eca652f83f8a4c6b4.jpeg

Posted

I prepared the cowling by soaking and shaping. I was concerned that trying to glue the cowling to a 1/16 inch thick deck board was gonna be next to impossible. I added support plates under the deck at the bow, stern, and on either side midship. It turns out that this worked OK – I could’ve used more support along both sides. Any overhang on the support can be trimmed flush with the cowling.
IMG_6450.thumb.jpeg.3c9aa8bd38eac6ed826ca412f7e3e96a.jpeg
 

 IMG_6451.thumb.jpeg.36285c1e65239cec574607bfd7a46ecb.jpeg
IMG_6443.thumb.jpeg.b5942a06eb3bdb4ad2d31b3f3afdb960.jpegIMG_6442.thumb.jpeg.21b8c1564eeaec10984f4eee9168ee06.jpeg

 

I had to recut the lower cabin front to fit as the plans were too short. As an afterthought, cutting many of the pieces early may result in ill fitting situations although this is the first to short (several have been long). The lower cabin roof was installed.

 

I needed to add to the roof in order to get back to the rear of the cabin and to have someplace for the front and side windows of the upper cabin to sit on.
IMG_6458.thumb.jpeg.b03aa15127031d9e0942306cf3a0709d.jpeg


Had to make adjustments to the rear cabin on each side to fit the hull and cabin roof line. I assembled the rear cabin and decided to cut a space for the door out of the center. I added supports on the top and bottom of the rear cabin in order to join the two pieces together.

IMG_6441.thumb.jpeg.63ee0a66ec875a4b721078d254fab8b1.jpegIMG_6445.thumb.jpeg.f9e6de2836c1e01e3d60b9174f0b8aa7.jpegIMG_6447.thumb.jpeg.353d20264695c8456f3d4c6bd7c79777.jpeg

Before I finish up the cabin, I need to decide on what accessories for the cabin  I want if any. I’m thinking as a minimum a helm and seat in the cabin and also some pre-cut items for the deck. If that’s the case, I’ll have to find some to order before I complete the cabin build.

Build time 4.5 hours.

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...