Jump to content

aydingocer

Members
  • Posts

    858
  • Joined

  • Last visited

Reputation Activity

  1. Like
    aydingocer got a reaction from Thukydides in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 159: 1 hr / Total 329 hours
    Photo 841: With the below, Mizzen stays are complete (except the Crowsfeet which come later). 

     
    Photo 842: I noticed the instructions for how to loop the thread around the masts too late for Mizzen stays. I had made them my own way (check the photo above), though not looking too bad. I hope to follow the instructions for the Fore and Main stay collars.

  2. Like
    aydingocer got a reaction from Clark in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 159: 1 hr / Total 329 hours
    Photo 841: With the below, Mizzen stays are complete (except the Crowsfeet which come later). 

     
    Photo 842: I noticed the instructions for how to loop the thread around the masts too late for Mizzen stays. I had made them my own way (check the photo above), though not looking too bad. I hope to follow the instructions for the Fore and Main stay collars.

  3. Like
    aydingocer got a reaction from Glenn-UK in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 159: 1 hr / Total 329 hours
    Photo 841: With the below, Mizzen stays are complete (except the Crowsfeet which come later). 

     
    Photo 842: I noticed the instructions for how to loop the thread around the masts too late for Mizzen stays. I had made them my own way (check the photo above), though not looking too bad. I hope to follow the instructions for the Fore and Main stay collars.

  4. Like
    aydingocer got a reaction from RossR in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 159: 1 hr / Total 329 hours
    Photo 841: With the below, Mizzen stays are complete (except the Crowsfeet which come later). 

     
    Photo 842: I noticed the instructions for how to loop the thread around the masts too late for Mizzen stays. I had made them my own way (check the photo above), though not looking too bad. I hope to follow the instructions for the Fore and Main stay collars.

  5. Like
    aydingocer got a reaction from wvdhee in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 159: 1 hr / Total 329 hours
    Photo 841: With the below, Mizzen stays are complete (except the Crowsfeet which come later). 

     
    Photo 842: I noticed the instructions for how to loop the thread around the masts too late for Mizzen stays. I had made them my own way (check the photo above), though not looking too bad. I hope to follow the instructions for the Fore and Main stay collars.

  6. Like
    aydingocer got a reaction from mugje in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 159: 1 hr / Total 329 hours
    Photo 841: With the below, Mizzen stays are complete (except the Crowsfeet which come later). 

     
    Photo 842: I noticed the instructions for how to loop the thread around the masts too late for Mizzen stays. I had made them my own way (check the photo above), though not looking too bad. I hope to follow the instructions for the Fore and Main stay collars.

  7. Like
    aydingocer got a reaction from rcweir in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 158: 1,5 hrs / Total 328 hours
    Today I started to work on the stays, completed the parts I marked with a red X. I have added several photos showing the steps in detail.
     
    Photo 825:

    Photos 826-837: The "upper" stay (indicated with "G" type thread in the plan screenshot)












    Photos 838-840: The "lower" stay the (indicated with "H" type thread in the plan sceenshot)



  8. Like
    aydingocer got a reaction from Clark in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 158: 1,5 hrs / Total 328 hours
    Today I started to work on the stays, completed the parts I marked with a red X. I have added several photos showing the steps in detail.
     
    Photo 825:

    Photos 826-837: The "upper" stay (indicated with "G" type thread in the plan screenshot)












    Photos 838-840: The "lower" stay the (indicated with "H" type thread in the plan sceenshot)



  9. Like
    aydingocer got a reaction from schooner in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 158: 1,5 hrs / Total 328 hours
    Today I started to work on the stays, completed the parts I marked with a red X. I have added several photos showing the steps in detail.
     
    Photo 825:

    Photos 826-837: The "upper" stay (indicated with "G" type thread in the plan screenshot)












    Photos 838-840: The "lower" stay the (indicated with "H" type thread in the plan sceenshot)



  10. Like
    aydingocer got a reaction from DonSangria in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 158: 1,5 hrs / Total 328 hours
    Today I started to work on the stays, completed the parts I marked with a red X. I have added several photos showing the steps in detail.
     
    Photo 825:

    Photos 826-837: The "upper" stay (indicated with "G" type thread in the plan screenshot)












    Photos 838-840: The "lower" stay the (indicated with "H" type thread in the plan sceenshot)



  11. Like
    aydingocer got a reaction from Glenn-UK in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 158: 1,5 hrs / Total 328 hours
    Today I started to work on the stays, completed the parts I marked with a red X. I have added several photos showing the steps in detail.
     
    Photo 825:

    Photos 826-837: The "upper" stay (indicated with "G" type thread in the plan screenshot)












    Photos 838-840: The "lower" stay the (indicated with "H" type thread in the plan sceenshot)



  12. Like
    aydingocer got a reaction from Clark in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 156-157: 1,5 hrs / Total 326,5 hours
     
    1,5 hours of more work and fitting of the yards are complete. Now I can tick the 4th item in my  checklist:
    Edit: I have Crossjack Sling also in position. So, 5th item is also ready.
     
    ✅ Fit masts
    ✅ Rig lower shrouds
    ✅ Rig upper Shrouds
    ✅ Fit the yards (do not rig them yet)
    ✅ Fit the crossjack sling to the crossjack yard (at this point for accesibility)
    Rig the mast stays
    (Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
    Add the Crowsfeet to the mast tops
    Rig the back stays
    Rig the yards
    Fit Sheets and Tacks
    Fit the Main Stay Tackle (but do not lash them yet)
    Rig the Yard Braces
    Fit the ship's boats
    Lash down the Main Stay Tackle and Fore Hatch Tackle
     
    A photo for the record:
    Photo: 824

  13. Like
    aydingocer got a reaction from Clark in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    The order of steps recommended in the instruction manual slightly differ from the numbering in the Plan Sheets. I have now studied the plans and instructions once again in detail before moving forward and came up with my updated reference task list. I don't want to make irreversible mistakes at this moment. Hence I will go with this order:

     
     
  14. Like
    aydingocer got a reaction from Thukydides in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 156-157: 1,5 hrs / Total 326,5 hours
     
    1,5 hours of more work and fitting of the yards are complete. Now I can tick the 4th item in my  checklist:
    Edit: I have Crossjack Sling also in position. So, 5th item is also ready.
     
    ✅ Fit masts
    ✅ Rig lower shrouds
    ✅ Rig upper Shrouds
    ✅ Fit the yards (do not rig them yet)
    ✅ Fit the crossjack sling to the crossjack yard (at this point for accesibility)
    Rig the mast stays
    (Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
    Add the Crowsfeet to the mast tops
    Rig the back stays
    Rig the yards
    Fit Sheets and Tacks
    Fit the Main Stay Tackle (but do not lash them yet)
    Rig the Yard Braces
    Fit the ship's boats
    Lash down the Main Stay Tackle and Fore Hatch Tackle
     
    A photo for the record:
    Photo: 824

  15. Like
    aydingocer got a reaction from Glenn-UK in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    The order of steps recommended in the instruction manual slightly differ from the numbering in the Plan Sheets. I have now studied the plans and instructions once again in detail before moving forward and came up with my updated reference task list. I don't want to make irreversible mistakes at this moment. Hence I will go with this order:

     
     
  16. Like
    aydingocer got a reaction from Dave B in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 156-157: 1,5 hrs / Total 326,5 hours
     
    1,5 hours of more work and fitting of the yards are complete. Now I can tick the 4th item in my  checklist:
    Edit: I have Crossjack Sling also in position. So, 5th item is also ready.
     
    ✅ Fit masts
    ✅ Rig lower shrouds
    ✅ Rig upper Shrouds
    ✅ Fit the yards (do not rig them yet)
    ✅ Fit the crossjack sling to the crossjack yard (at this point for accesibility)
    Rig the mast stays
    (Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
    Add the Crowsfeet to the mast tops
    Rig the back stays
    Rig the yards
    Fit Sheets and Tacks
    Fit the Main Stay Tackle (but do not lash them yet)
    Rig the Yard Braces
    Fit the ship's boats
    Lash down the Main Stay Tackle and Fore Hatch Tackle
     
    A photo for the record:
    Photo: 824

  17. Like
    aydingocer got a reaction from RossR in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 156-157: 1,5 hrs / Total 326,5 hours
     
    1,5 hours of more work and fitting of the yards are complete. Now I can tick the 4th item in my  checklist:
    Edit: I have Crossjack Sling also in position. So, 5th item is also ready.
     
    ✅ Fit masts
    ✅ Rig lower shrouds
    ✅ Rig upper Shrouds
    ✅ Fit the yards (do not rig them yet)
    ✅ Fit the crossjack sling to the crossjack yard (at this point for accesibility)
    Rig the mast stays
    (Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
    Add the Crowsfeet to the mast tops
    Rig the back stays
    Rig the yards
    Fit Sheets and Tacks
    Fit the Main Stay Tackle (but do not lash them yet)
    Rig the Yard Braces
    Fit the ship's boats
    Lash down the Main Stay Tackle and Fore Hatch Tackle
     
    A photo for the record:
    Photo: 824

  18. Like
    aydingocer got a reaction from wvdhee in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 156-157: 1,5 hrs / Total 326,5 hours
     
    1,5 hours of more work and fitting of the yards are complete. Now I can tick the 4th item in my  checklist:
    Edit: I have Crossjack Sling also in position. So, 5th item is also ready.
     
    ✅ Fit masts
    ✅ Rig lower shrouds
    ✅ Rig upper Shrouds
    ✅ Fit the yards (do not rig them yet)
    ✅ Fit the crossjack sling to the crossjack yard (at this point for accesibility)
    Rig the mast stays
    (Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
    Add the Crowsfeet to the mast tops
    Rig the back stays
    Rig the yards
    Fit Sheets and Tacks
    Fit the Main Stay Tackle (but do not lash them yet)
    Rig the Yard Braces
    Fit the ship's boats
    Lash down the Main Stay Tackle and Fore Hatch Tackle
     
    A photo for the record:
    Photo: 824

  19. Like
    aydingocer got a reaction from Glenn-UK in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 156-157: 1,5 hrs / Total 326,5 hours
     
    1,5 hours of more work and fitting of the yards are complete. Now I can tick the 4th item in my  checklist:
    Edit: I have Crossjack Sling also in position. So, 5th item is also ready.
     
    ✅ Fit masts
    ✅ Rig lower shrouds
    ✅ Rig upper Shrouds
    ✅ Fit the yards (do not rig them yet)
    ✅ Fit the crossjack sling to the crossjack yard (at this point for accesibility)
    Rig the mast stays
    (Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
    Add the Crowsfeet to the mast tops
    Rig the back stays
    Rig the yards
    Fit Sheets and Tacks
    Fit the Main Stay Tackle (but do not lash them yet)
    Rig the Yard Braces
    Fit the ship's boats
    Lash down the Main Stay Tackle and Fore Hatch Tackle
     
    A photo for the record:
    Photo: 824

  20. Wow!
    aydingocer got a reaction from chris watton in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 156-157: 1,5 hrs / Total 326,5 hours
     
    1,5 hours of more work and fitting of the yards are complete. Now I can tick the 4th item in my  checklist:
    Edit: I have Crossjack Sling also in position. So, 5th item is also ready.
     
    ✅ Fit masts
    ✅ Rig lower shrouds
    ✅ Rig upper Shrouds
    ✅ Fit the yards (do not rig them yet)
    ✅ Fit the crossjack sling to the crossjack yard (at this point for accesibility)
    Rig the mast stays
    (Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
    Add the Crowsfeet to the mast tops
    Rig the back stays
    Rig the yards
    Fit Sheets and Tacks
    Fit the Main Stay Tackle (but do not lash them yet)
    Rig the Yard Braces
    Fit the ship's boats
    Lash down the Main Stay Tackle and Fore Hatch Tackle
     
    A photo for the record:
    Photo: 824

  21. Like
    aydingocer got a reaction from James H in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 156-157: 1,5 hrs / Total 326,5 hours
     
    1,5 hours of more work and fitting of the yards are complete. Now I can tick the 4th item in my  checklist:
    Edit: I have Crossjack Sling also in position. So, 5th item is also ready.
     
    ✅ Fit masts
    ✅ Rig lower shrouds
    ✅ Rig upper Shrouds
    ✅ Fit the yards (do not rig them yet)
    ✅ Fit the crossjack sling to the crossjack yard (at this point for accesibility)
    Rig the mast stays
    (Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
    Add the Crowsfeet to the mast tops
    Rig the back stays
    Rig the yards
    Fit Sheets and Tacks
    Fit the Main Stay Tackle (but do not lash them yet)
    Rig the Yard Braces
    Fit the ship's boats
    Lash down the Main Stay Tackle and Fore Hatch Tackle
     
    A photo for the record:
    Photo: 824

  22. Thanks!
    aydingocer got a reaction from Cjames in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Thanks for the advice. I think in this case I will sand the lower part to thinner than 3.8x3.8 mm, maybe 3.2 x3.2 or something and slightly enlarge the mast cap hole also if I need to.  
  23. Like
    aydingocer got a reaction from Clark in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 155: 5 hrs / Total 325 hours
     
    Installing Crossjack Yard and Main Yard. Below I share the process of rigging the thread structure for mounting the Main Yard, as good as I understood from the plans. Last two photos show the yards in place with their thread fittings. I used nails here, too, to mount them strongly in place.
     
    Photos 818-823






  24. Like
    aydingocer got a reaction from wvdhee in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 155: 5 hrs / Total 325 hours
     
    Installing Crossjack Yard and Main Yard. Below I share the process of rigging the thread structure for mounting the Main Yard, as good as I understood from the plans. Last two photos show the yards in place with their thread fittings. I used nails here, too, to mount them strongly in place.
     
    Photos 818-823






  25. Like
    aydingocer got a reaction from RossR in HMS Sphinx 1775 by aydingocer - Vanguard Models - 1:64 - Revision #2   
    Build day 155: 5 hrs / Total 325 hours
     
    Installing Crossjack Yard and Main Yard. Below I share the process of rigging the thread structure for mounting the Main Yard, as good as I understood from the plans. Last two photos show the yards in place with their thread fittings. I used nails here, too, to mount them strongly in place.
     
    Photos 818-823






×
×
  • Create New...