Jump to content
Welcome to our new sponsor - Engine DIY. See banner ad on Home page. ×

Lee J H

Members
  • Posts

    136
  • Joined

  • Last visited

1 Follower

About Lee J H

  • Birthday 10/18/1968

Profile Information

  • Gender
    Male
  • Location
    Seoul, south KOREA

Recent Profile Visitors

1,378 profile views
  1. This is how I finished the work. Now the sandpaper has work left, and we plan to implement the weil work.
  2. I did the 2nd Planking of Main deck. Since I worked on the frame of the statement first, I worked by cutting the second planking system well.
  3. The wood was manufactured and positioned with a thickness of 1.5 mm. Now I plan to make the outer planking and whale.
  4. During the production process, there was a difference between the drawing and the actual product, so the ribs had to be cut. Fortunately, it is hidden under the deck.
  5. The political situation in Korea is not good these days. I think it has been widely reported overseas through foreign media. I hope that politics will stabilize soon. I made the main deck gate frame. Since it is difficult to do it according to the drawing dimensions, the actual size is different, so I made a compromise with the lower gate frame and the drawing and marked it with a pencil.
  6. I did the second planking of work on the bottom. We worked by replacing the 6mm material enclosed in the box with 5mm material.
  7. As I'm trying to do the main deck, I think I need to complete the bottom 2nd planks to work on the battery, so I'm going to do the stern planks.
  8. The studio was so hot that I couldn't work on it for months. It's winter now, so I started again. The 1st planks of the main deck.
  9. Thank you for your support. It's something you have to proceed with as you decide on the stage of production. I'm struggling with my lack of experience. I'm planning to work hard on it.
×
×
  • Create New...