Jump to content

mtbediz

Members
  • Posts

    1,084
  • Joined

  • Last visited

Everything posted by mtbediz

  1. Thank you very much Bob. That means a lot coming from you, master.
  2. The rigging of the yards is now done. I will add a gaff to the mizzen mast to complete.
  3. I have now done the fore lower, topsail, topgalant and royal yards and their rigging.
  4. Hello friends. I watched a few videos on the internet on how to make rope coils for the belaying pins, but I couldn't get the image I wanted in the trials and I developed my own method.
  5. The yards and rigging of the main mast have been completed.
  6. Thanks so much for the likes my friends. The main lower yard has now been mounted and I've begun the running rigging lines. The jeers, sling and truss pendant have been completed.
  7. Happy christmas friends. I am sharing what I did on Essex since my last post. Not too much proceeding because the rope, blocks etc. production continues alongside the model.
  8. I have made and mounted the three topgallant/royal masts and started rigging them.
  9. I completed the shrouds and ratlines of the topmasts and added main and mizzen topmast stays and backstays.
  10. Thank you very much Bob. Thanks very much friends for the nice comments and likes. I added the crow's feet to the tops.
  11. The lower shrouds, fore stay and preventer stay are now completed.
  12. Rigging has begun. The arrangement and run of the lines is being taken from the rigging diagrams in AOTS Essex. I've completed the burton pendants, shrouds and stay on the lower mizzen mast. I have served the lines with a hommade serving machine.
  13. Hammock cranes on the quarter deck were made and installed.
  14. This is a very clean an nice work. Do you have a plan to do the full rigging or it will be an admiralty style? I apologize if you declared before.
×
×
  • Create New...