Jump to content
Supplies of the Ship Modeler's Handbook are running out. Get your copy NOW before they are gone! Click on photo to order. ×

Recommended Posts

Posted

Next project is the rear mast.

Some PE parts were incredibly small. I didn't loose anything but managed to loose two spare airbrush noses while trying to replace a clogged one. Fortunately I have spare airbrush as well

Brass was used extensively to make a rigid and durable  piece. One thing that made me happy is that I found a way to make strong masts without use of messy soldering. With my low rpm rotary tool and a disc cutter I made a slot, filled it with ca glue and attach thehe yarddam vertically. How come I haven't thing of it early would have saved big mess and effort

 

 

 

 

IMG_20250727_164907.jpg

IMG_20250727_165245.jpg

IMG_20250727_184348.jpg

IMG_20250727_195019.jpg

IMG_20250727_195029.jpg

Posted

I made the catapults and the crane. Instructions are horrible so I research onine to see real pics. Its called Mk6 catapult.

Test fitting is essential. The catapults are colliding with the rear gun platforms. Thats because PE instructions calling for the base to be glued at the middle of the catapults which is wrong. They should be put at the 2/3 of the length of it. So I need to make another mini operation, detach and relocate  the base without causing damage to the fragile PE part

 

IMG_20250731_191223.jpg

IMG_20250731_210459.jpg

IMG_20250731_210838.jpg

IMG_20250731_210926.jpg

Posted

The bases  for the Bofors proved somewhat narrow. So I decided to remove them. So that gave me the chance to remove they supports closer to the crane as indicated above. Another save - step back. 

I worked on the Bofors and improved a design used in the past. The outcome was pretty satisfying, the detail was excellent. Some were put in place along with the new bases.

Later addition was the set of crane almost amidships, the PE was pretty detailed also. For the 5" guns sterile needles were used for barrels.

Unfortunately I wasn't able ro finish the project on the desired time, it will take at least two weeks of evening work to put in more details like Oerlikons, liferafts etc, as well as rigging, weathering and a base

 

 

IMG_20250802_143233.jpg

IMG_20250802_182043.jpg

IMG_20250803_092429.jpg

IMG_20250803_092639.jpg

IMG_20250803_211015.jpg

IMG_20250803_211009.jpg

IMG_20250803_211028.jpg

IMG_20250803_211041.jpg

  • 3 weeks later...
Posted (edited)

Back  to work.

I bought some Mk51 fire directors from Black Cat models. They are of exceptional detail although most of it can be revealed using lens. 

More quad  Bofors installed. Also single  Oerlikons, were made, hey looked quite ok, some were put in place but there are  many more waiting. I painted the barrels using one single  thread of paintbrush and microlens. Finally I made my own version of SK2 . But removing the PE proved hard so better leave it as is no need further damage to be done had enough so far.

  

 

IMG_20250822_170056.jpg

IMG_20250822_170107.jpg

IMG_20250822_183520.jpg

IMG_20250822_171659.jpg

IMG_20250822_192011.jpg

IMG_20250822_192018.jpg

IMG_20250822_192033.jpg

IMG_20250822_192109.jpg

Edited by mikegr

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...