  1. The deck ledges were installed next. Do to the type of frames I am using I couldn’t use the jig described in the practicum. I marked the beginning, end and midpoint of each ledge then marked the top of the ledge at these three points from the top of the frame with a compass and glued the ledges in place. The ledges for the lower decks are the only ones installed at this time.