Jump to content

HM Bark Endeavour by Sideways Sam - Caldercraft - 1:64


Recommended Posts

That's a busy looking deck Sam, your flying along.  :imNotWorthy:

Andrew
Current builds:- HM Gun-brig Sparkler - Vanguard (1/64) 
HMAV Bounty - Caldercraft (1/64)

Completed (Kits):-

Vanguard Models (1/64) :HM Cutter Trial , Nisha - Brixham trawler

Caldercraft (1/64) :- HMS Orestes(Mars)HM Cutter Sherbourne

Paper Shipwright (1/250) :- TSS Earnslaw, Puffer Starlight

 

Link to comment
Share on other sites

  • 3 weeks later...
  • 3 weeks later...

Fantastic Looking Endeavour Sam and you are obviously a very comitted working as you will soon be a head of me .At this rate you will soon be thinking of your next project. Any thoughts on what you would like to do?

Completed     St Canute Billings            Dec 2020

Completed    HMS Bounty Amati          May 2021 Finished

Currently building HM Bark Endeavour  

 

 

 

Link to comment
Share on other sites

Hi, thanks for visiting and the likes.

Dave  -  thanks for the comments.

Next project is already waiting on the shelf.

I thought that this would be the first kit where I wouldn't have to buy a load of extras

like better planking etc. but I have already purchased cabin furniture for it and,

if I don't go down the Navy Board route, I will need the pearwood blocks option.

Have already opened the box and the contents are staggering.

Best kit of parts ever.

 

Really looking forward to this one.

 

Best regards,

Sam.

 

IMG_1933.thumb.jpeg.0dc0177acafd5f755bd00305286aec44.jpeg

 

 

Link to comment
Share on other sites

Excellent Choice Sam. I have been thinking of going down the Vanguard route sometime in the future. There are some great builds on here of the Sphinx and other models by Vanguard. I will look forward to following her when you get started.

Edited by DaveBaxt

Completed     St Canute Billings            Dec 2020

Completed    HMS Bounty Amati          May 2021 Finished

Currently building HM Bark Endeavour  

 

 

 

Link to comment
Share on other sites

  • 3 weeks later...

Hi and, thanks for visiting.

Sprit, fore and main mast yards assembled and located.

Next will be the mizzen then the rest of the rigging will follow.

In spite of fat shaky fingers and poor eyesight this is going together well.

A good kit of parts from day one and the rigging plans provided are excellent.

Another couple of weeks and I should be going on to the fiddly bits.

Have mixed feelings about that phase of the build.

 

Best regards,

Sam.

 

IMG_1965.thumb.jpeg.f55f5946626314b2b2d7bc58714fa138.jpegIMG_1966.thumb.jpeg.8b993e6730267ae38f2ca47d33c6af37.jpegIMG_1967.thumb.jpeg.c0424881c980b144b74c49ac9fb036ae.jpeg

Link to comment
Share on other sites

16 minutes ago, SIDEWAYS SAM said:

Thanks for the comment Dave.

Also thanks for the likes.

Still feels like a lot of work left to finish the rigging

b ut will be worth the effort.

 

Best regards,

Sam.

Yeah Sam I am finding it slow progress and difficult to figure out with what to do first. I started with the lower shrouds before the stays but I am sure we will all get there in the end. I tend to work on the the Endeavour through the week and the Diana at the weekend. It gives me a headache working on the rigging all the time  so need a break .Ha ha. Good luck with the rigging and you are doing a cracking job so far and your workmanship is far superior to mine.

Completed     St Canute Billings            Dec 2020

Completed    HMS Bounty Amati          May 2021 Finished

Currently building HM Bark Endeavour  

 

 

 

Link to comment
Share on other sites

Thanks for the comments Dave.

If mine turns out as good as your efforts I will be well pleased.

Tend to follow your Endeavour rigging sequence except possibly

will leave the shrouds till later.

Just had a look at your Diana build.  Very impressive.

Seems I am not the only one having problems with kit supplied strip wood.

Thanks for the posts referencing timber supplies. Written these down for the future.

 

Best regards,

Sam.

 

Link to comment
Share on other sites

Hi and thanks for visiting.

Crossjack and topsail yard added to mizzen.

Gaff boom will be attached later.

Crowsfeet next then stays.

I know that the shrouds should be fixed before the stays

but due to fat fingers and poor eyesight I am having to

compromise with some aspects of the rigging.

Not a museum quality model by any means.

 

Best regards,

Sam.

 

IMG_1970.thumb.jpeg.dda6eaa9933f211ea065792f00eb1355.jpegIMG_1971.thumb.jpeg.23813a89089ce4deeaeacdb659b91189.jpeg

Link to comment
Share on other sites

Great progress Sam, really starting to take shape and get the feel for how she will look completed. 👍

Andrew
Current builds:- HM Gun-brig Sparkler - Vanguard (1/64) 
HMAV Bounty - Caldercraft (1/64)

Completed (Kits):-

Vanguard Models (1/64) :HM Cutter Trial , Nisha - Brixham trawler

Caldercraft (1/64) :- HMS Orestes(Mars)HM Cutter Sherbourne

Paper Shipwright (1/250) :- TSS Earnslaw, Puffer Starlight

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...